China Major Ports and Airports Code Reference
Purchase orders, bills of lading and ERP port master tables need the right five-letter UN/LOCODE or three-letter IATA code. This list covers the main Chinese seaports, river ports and cargo airports so you can fill them in consistently.
| Location | Code | Type | Province or region | Note |
|---|---|---|---|---|
Shanghai | CNSHA | Seaport (UN/LOCODE) | Shanghai | Largest container gateway; Yangshan deep-water terminals |
Ningbo | CNNGB | Seaport (UN/LOCODE) | Zhejiang | Ningbo-Zhoushan port system |
Shenzhen | CNSZX | Seaport (UN/LOCODE) | Guangdong | General code for the port area |
Yantian, Shenzhen | CNYTN | Seaport (UN/LOCODE) | Guangdong | Container terminal in Shenzhen |
Shekou, Shenzhen | CNSHK | Seaport (UN/LOCODE) | Guangdong | Container terminal in Shenzhen |
Nansha, Guangzhou | CNNSA | Seaport (UN/LOCODE) | Guangdong | Guangzhou container terminals on the Pearl River estuary |
Hong Kong | HKHKG | Seaport (UN/LOCODE) | Hong Kong SAR | Separate customs territory from mainland |
Qingdao | CNTAO | Seaport (UN/LOCODE) | Shandong | Main northern container port |
Tianjin Xingang | CNXGG | Seaport (UN/LOCODE) | Tianjin | Gateway for Beijing and north China; CNTSN also appears in some systems |
Xiamen | CNXMN | Seaport (UN/LOCODE) | Fujian | Southeast coast container port |
Dalian | CNDLC | Seaport (UN/LOCODE) | Liaoning | Northeast China gateway |
Lianyungang | CNLYG | Seaport (UN/LOCODE) | Jiangsu | Coastal port with rail links inland |
Taicang | CNTAG | River-sea port (UN/LOCODE) | Jiangsu | Yangtze River port near Shanghai |
Nanjing | CNNKG | River port (UN/LOCODE) | Jiangsu | Yangtze River inland port |
Fuzhou | CNFOC | Seaport (UN/LOCODE) | Fujian | Fujian provincial capital port |
Yingkou | CNYIK | Seaport (UN/LOCODE) | Liaoning | Northeast port with rail connections |
Wuhan | CNWUH | River port (UN/LOCODE) | Hubei | Central China Yangtze port |
Chongqing | CNCKG | River port (UN/LOCODE) | Chongqing | Upper Yangtze inland port |
Shanghai Pudong | PVG | Airport (IATA) | Shanghai | Major international air cargo hub |
Shanghai Hongqiao | SHA | Airport (IATA) | Shanghai | Mainly domestic passenger traffic |
Beijing Capital | PEK | Airport (IATA) | Beijing | International passenger and cargo |
Beijing Daxing | PKX | Airport (IATA) | Beijing | Second Beijing airport |
Guangzhou Baiyun | CAN | Airport (IATA) | Guangdong | Large cargo hub for the Pearl River Delta |
Shenzhen Bao'an | SZX | Airport (IATA) | Guangdong | Electronics air freight, near Hong Kong |
Hong Kong International | HKG | Airport (IATA) | Hong Kong SAR | Major global air cargo hub |
Chengdu Shuangliu | CTU | Airport (IATA) | Sichuan | Southwest China hub |
Chengdu Tianfu | TFU | Airport (IATA) | Sichuan | Second Chengdu airport |
Hangzhou Xiaoshan | HGH | Airport (IATA) | Zhejiang | Yangtze Delta e-commerce and manufacturing |
Xiamen Gaoqi | XMN | Airport (IATA) | Fujian | Fujian international airport |
Qingdao Jiaodong | TAO | Airport (IATA) | Shandong | Shandong peninsula airport |
Nanjing Lukou | NKG | Airport (IATA) | Jiangsu | Jiangsu provincial capital airport |
Chongqing Jiangbei | CKG | Airport (IATA) | Chongqing | Western China hub |
Wuhan Tianhe | WUH | Airport (IATA) | Hubei | Central China hub |
Zhengzhou Xinzheng | CGO | Airport (IATA) | Henan | Inland air cargo hub |
Xi'an Xianyang | XIY | Airport (IATA) | Shaanxi | Northwest China hub |
Kunming Changshui | KMG | Airport (IATA) | Yunnan | Southwest gateway to Southeast Asia |
UN/LOCODE codes identify locations and may cover several terminals. Confirm the exact terminal, customs district and any consolidation rules with your forwarder before issuing a PO or booking. Check the current UN/LOCODE release for changes.
Clean logistics master data
Want a review of your ERP ports, places and Incoterms fields? Ask for an optional walkthrough.
Optional. The tool and every export work without this. No spam.
How to use the list
Search by city, code or province. For sea freight use the UN/LOCODE (country code CN plus a three-letter location code, or HK for Hong Kong). For air freight use the IATA airport code. Put the same code in your ERP supplier ship-from field, the Incoterms named place and the forwarder booking, so that your tracking and landed cost reports can group shipments by gateway. Export the filtered rows to Excel to load into a port master or a drop-down list in your purchasing template.
Why the named place matters
An Incoterms rule such as FOB or CIF needs a named port, for example FOB Ningbo or CIF Los Angeles. Writing only China leaves the place of delivery and the point where risk passes undefined. Where a factory is inland, the named place may be a factory (EXW), a rail terminal or an inland river port. Using the code alongside the name avoids ambiguity between similarly named locations and helps customs brokers match documents.
- Name the exact port or terminal, not the country
- Match the code in PO, invoice, packing list and B/L
- For Shenzhen, specify Yantian, Shekou or another terminal
- Check whether the supplier ships via Hong Kong, a separate customs territory
Common mistakes
The most frequent errors are using Shenzhen where the booking is really for a specific terminal, treating Hong Kong as mainland China in customs documents, and mixing seaport codes with airport codes in the same field. Also, some systems use CNTSN while others use CNXGG for Tianjin, so keep one convention and map the other in your master data. Landed cost and lead time vary by gateway, so record the gateway on each PO.
Frequently Asked Questions
What is the UN/LOCODE for Shanghai port?
The UN/LOCODE for Shanghai is CNSHA. Terminals such as Yangshan are usually handled within that code by your forwarder, so confirm the terminal separately when booking and on the bill of lading.
Is Hong Kong part of China for customs?
Hong Kong is a Special Administrative Region and a separate customs territory. Goods moving between Hong Kong and the mainland are treated as imports or exports in many cases, so documents and duties differ. Use HKHKG, not a CN code, for Hong Kong.
Should I use UN/LOCODE or IATA for air freight?
For air freight, IATA airport codes such as PVG or SZX are standard on air waybills and bookings. UN/LOCODE can describe the city, but the airport code is what carriers and handlers use to route cargo.
Does this list cover every Chinese port?
No. It covers major gateways and some inland river ports and cargo airports. Use the official UN/LOCODE database or your forwarder for smaller ports, and confirm that the chosen port can handle your cargo type.
If your ERP lets users free-type ports and places, Netray can help set up master data validation and a private assistant that flags inconsistent shipping data in open orders.
Related Tools
China Sourcing RFQ Quote Comparison Worksheet
Line up factory quotes on landed unit cost including freight, duty and tooling per piece so the cheapest price is not the wrong choice.
Country & TaxChina GB and GB/T Standards Quick Reference Table
Look up which GB (mandatory) and GB/T (recommended) standard covers a product or process, and the nearest international standard it relates to.
Supply Chain & InventoryChina Sourcing Supply Chain Risk Assessment
Ten questions that show how exposed your supply base is to disruption, tariffs and IP loss when you source from China, with suggested next steps.
Supply Chain & InventoryChina Factory Capacity Confirmation Letter Template
A fill-in letter that gets a supplier to commit in writing to capacity, lead time, MOQ, tooling, quality terms and subcontracting before you place the first PO.
More Supply Chain & Inventory tools
See all- China Import Landed Cost Calculator
- China Supplier Qualification Scorecard Worksheet
- China Purchase Order and Production Tracker Worksheet
- Oracle Fusion Inventory Turns and Carrying Cost Calculator
- Distribution ERP Fill Rate Calculator
- Distributor Rebate Tracking Worksheet
- Branch Transfer Planning Worksheet
- Distributor Slow-Moving Inventory Review Worksheet
- Distributor Vendor Performance Scorecard Worksheet
Keep exploring
Free tools
- Africa Major Ports and UN/LOCODE ReferencePort names, countries, UN/LOCODE values and the inland corridors each port serves, for freight quotes, shipping master data and ERP location tables.
- Industrial Protocol and Plant IT TCP/UDP Ports ReferenceA searchable table of default ports for industrial protocols and the IT services a plant depends on, built for firewall rule requests and conduit reviews.
- Common OT and ICS Protocol Ports ReferenceDefault TCP and UDP ports used by industrial protocols and the IT services that sit beside them, with a firewall risk note for each.