EDI 830 Planning Schedule Skeleton Generator for Automotive Suppliers
The 830 Planning Schedule with Release Capability is the forecast message that many automotive customers send to suppliers, usually alongside the 862 shipping schedule. This generator builds a small, well-formed 830 you can use to test a mapping or understand the structure.
Fill in
ISA06 must be exactly 15 characters, pad with spaces.
ISA08 must be exactly 15 characters, pad with spaces.
Envelope
ISA*00* *00* *ZZ*BUYERPLANT01 *ZZ*SUPPLIER1 *261019*0830*U*00401*000000417*0*P*>~ GS*PS*BUYERPLANT01*SUPPLIER1*20261019*0830*1*X*004010~
Header
ST*830*0001~ BFR*00*PS261019*42*DL*A*20261019*20270118*20261019~ N1*ST*Plant 3 Assembly*92*P3~ N1*SU*Acme Stampings Ltd*92*SUP4471~
Item and forecast lines
LIN**BP*52107-4410*VP*AS-BRKT-210~ UIT*EA~ FST*2400*C*W*20261026~ FST*2600*D*W*20261102~ FST*2200*D*W*20261109~
Trailer
CTT*1~ SE*11*0001~ GE*1*1~ IEA*1*000000417~
Sample for mapping tests only. Segments, qualifiers, version (004010 shown) and which fields are required differ by customer implementation guide, so always follow the trading partner guide. SE01 counts segments from ST through SE inclusive; update it if you add or remove lines.
EDI schedule monitoring
Optional: we can discuss how inbound schedules could be summarised and checked against ERP planning data.
Optional. The tool and every export work without this. No spam.
How to use the generator
Fill in the envelope IDs, the release number, the horizon dates, the ship-to and supplier codes, the part numbers and up to three weekly quantities. The output has four blocks: the interchange and group envelope, the transaction header, the item and forecast lines, and the trailer. Copy the result into a flat file and feed it to your EDI translator or ERP inbound map to confirm the segments parse. ISA06 and ISA08 must be padded to exactly 15 characters.
What each segment does
BFR opens the schedule: purpose code, reference, release number, schedule type (DL for delivery based, SH for shipment based), quantity type (A for actual discrete quantities) and the horizon dates. N1 identifies parties. LIN ties buyer and vendor part numbers. UIT is the unit of measure. FST carries each forecast quantity with a qualifier for firm or planning (C or D), a timing qualifier such as W for weekly, and the date. CTT counts line items.
- BFR04 DL is delivery based, SH is shipment based
- FST02 C is firm, D is planning forecast
- SE01 is the number of segments from ST to SE
830 versus 862 and 866
The 830 is a rolling forecast. The 862 is the shipping schedule that confirms near-term firm releases with exact dates and quantities, and automotive suppliers often receive both. Some customers also send 866 for production sequence. Your planning system should treat the 830 as demand forecast input for MRP and the 862 as the near-term commitment. Mixing them leads to over- or under-building.
Common mistakes
The usual errors are wrong ISA padding, an incorrect SE segment count, and dates in the wrong format. Another is ignoring cumulative quantities: many customers also send cumulative received data through REF or QTY segments, which this simple skeleton leaves out. Check the customer implementation guide for those. Finally, never load a skeleton into a production inbound queue without marking it as test data.
Frequently Asked Questions
What does the BFR segment in an 830 contain?
BFR is the beginning segment for the planning schedule. It holds the purpose code, a schedule reference, the release number, the schedule type and quantity qualifiers, the horizon start and end dates, and the issue date.
What is the difference between FST codes C and D?
In the FST segment the forecast qualifier C means firm and D means planning. Firm quantities are a commitment, while planning quantities are an estimate that can change in later releases.
Does this generate production-ready EDI?
No. It is a teaching and testing skeleton. Production maps must follow the trading partner's implementation guide, including versions, qualifiers, cumulative data and any required segments such as SDP or SHP.
How do I count the SE segment total?
SE01 is the total number of segments in the transaction set, counting ST and SE themselves. The sample has 11. If you add another FST or N1 line, increase the number by one for each added segment.
If your inbound 830 and 862 data feeds planning in SyteLine, SAP or another ERP, Netray can discuss monitoring and explaining those schedules with a private assistant.
Related Tools
X12 856 Advance Ship Notice Generator
Fill in shipment, carrier and item details and get a clean X12 856 skeleton with shipment, order and item hierarchy to use as a test file.
Developer ToolsEDI X12 850 Purchase Order Skeleton Generator
Fill in the partner IDs, PO number and one line item to generate a valid-looking X12 850 test message in 005010 format.
Developer ToolsSupplier PPM and On-Time Delivery SQL Query Generator
Fill in your receipt table and column names to generate a ready-to-run SQL query for supplier reject PPM and on-time delivery.
Supply Chain & InventoryPremium Freight Cost Per Part Calculator for Automotive Suppliers
Calculate the excess cost of premium freight events versus standard freight, per part and as a percent of revenue, with a what-if on event count.
More Developer Tools tools
See all- PPAP Status Tracker SQL Query Generator
- X-bar and R Control Limits Python Script Generator
- Warranty Claims Pareto and Months in Service SQL Query Generator
- SAP Sales Order ABAP SELECT Generator (VBAK, VBAP, VBFA)
- SAP Sales Order Create BAPI ABAP Generator (BAPI_SALESORDER_CREATEFROMDAT2)
- SAP ABAP Open Items SELECT Generator
- SAP ACDOCA SQL Query Generator
- SAP QM Inspection Lot ABAP SELECT Generator
- SAP Quality Notification Pareto SQL Query Generator
Keep exploring
Free tools
- EDI 830 Forecast Review Cycle Safety Stock CalculatorSee how the frequency of loading customer 830 forecasts changes safety stock, reorder point and carrying cost.
- EDI X12 850 Purchase Order Skeleton GeneratorFill in the partner IDs, PO number and one line item to generate a valid-looking X12 850 test message in 005010 format.
- X12 850 Purchase Order EDI Skeleton GeneratorBuilds a single-line ANSI X12 850 purchase order with ISA, GS, ST, BEG, N1 and PO1 segments you can use as a test file or mapping reference.
ERP fixes and how-tos
- How to Set Up an EDI Trading Partner in Plex SystemsHow to configure a new EDI trading partner in Plex EDI Data Manager, map document types like 850, 830, 862, and 856, and test before going live.
- JD Edwards Supplier Scheduling: Setting Up and Releasing Supplier SchedulesHow supplier scheduling works in JD Edwards: blanket orders, MRP-driven schedules, releasing forecasts to suppliers and the setup needed, with common pitfalls.
- How Sales Schedules Work in Infor LN: Releases and Cumulative QuantitiesHow sales schedules work in Infor LN: releases, firm versus planned quantities, cumulative received and shipped, and how to fix a schedule that does not match.
Runs with your ERP
- 1 EDI Source EDI Integration with Infor VISUALHow 1 EDI Source connects Infor VISUAL to trading partners for EDI orders, invoices and ship notices via ION or direct API: setup, pitfalls and private AI.
- Cleo Integration Cloud with JD Edwards: EDI Connector and Migration PathCleo Integration Cloud has a prebuilt JD Edwards EnterpriseOne connector for EDI. See data flows, setup steps, pitfalls and Oracle Fusion migration notes.
- Infor EDI Managed Service and Infor M3 over IONHow Infor's EDI managed service connects to Infor M3 through ION with pre-built trading partner links: data flows, setup steps, pitfalls and a private AI layer.
Guides
- ERP for Automotive Tier 1 and Tier 2 SuppliersERP for automotive Tier 1 and Tier 2 suppliers: IATF 16949, EDI 830 and 862 releases, PPAP, APQP and traceability requirements with implementation guidance.
- EDI Transaction Sets Every Manufacturer Should KnowA manufacturer reference to EDI transaction sets: what 850, 855, 856, 810, 862, and 830 documents contain and how each maps into ERP order and shipping data.
- ERP for Metal Stampers: Coil, Dies, EDI Releases and Press SchedulingWhat a metal stamping ERP must handle: coil and slitting, die and tool tracking, EDI releases, lot traceability, press scheduling and job costing by press.
AI on your ERP
- AI on Infor SyteLine for Automotive SuppliersAI on Infor SyteLine for automotive suppliers: EDI releases, IATF 16949 records, PPAP, customer scorecards, and line-side shortages. On-prem or private cloud.
- Epicor Kinetic AI for Automotive Suppliers: EDI Releases, ASN, PPAP and Scorecard QuestionsPrivate AI on Epicor Kinetic for automotive suppliers: EDI releases, ASN, PPAP, scrap and scorecard questions answered in plain English from live data.