MES & Shop FloorFree templatePDF, Excel, Word exportAVEVA System Platform / Wonderware HistorianManufacturing, Aerospace and Defense

AVEVA System Platform and Historian Private AI Layer Blueprint Generator

This generator turns your environment details into a structured architecture plan for adding a private AI assistant to AVEVA System Platform and Historian. It covers components, security controls, rollout phases and the questions your IT and controls teams need to answer, and it exports to PDF or Word.

Fill in

Live preview
Free, optional. Reopen it on any device.
Download:

AVEVA System Platform and Historian Private AI Layer Blueprint Generator

Private AI Layer Architecture Plan: AVEVA System Platform and Historian

Company: Acme Precision Ltd System: AVEVA System Platform and Historian (System Platform 2017 / 2017 U3) Data layout: Historian on SQL Server (dedicated server) Hosting: On-prem server Sites in scope: Plant 1 (pilot), Plant 2 (phase 3) Named users: 150 Target go-live for phase 1: 2027-02-01

1. Context and scope

Acme Precision Ltd runs AVEVA System Platform and Historian (System Platform 2017 / 2017 U3) and wants an AI assistant that works on the data and documents already held on site, without moving that data to a third-party cloud. Hosting model: On-prem server.

Main use cases: Query tag history and alarm counts in plain language, locate the right tag by area and description, explain batch deviations using documents and trends, draft shift summaries.

Out of scope for the assistant: control writes of any kind, changes to controlled records without a person committing them, and any access beyond the roles each user already holds.

2. Components

ComponentDesignNotes for Acme Precision Ltd
Data access pathRead-only SQL login on the Historian Runtime database views via named, parameterised tools with time and row capsRead-only identity, reviewed by IT and controls owners. Data layout: Historian on SQL Server (dedicated server).
Retrieval indexTag catalog (name, description, unit, Galaxy area) plus SOPs, batch records and alarm philosophy documentsRebuilt on a schedule; source permissions stored with each chunk.
Model servingOpen-weight model served with vLLM or Ollama on local GPUsGPU available: 1 x 48 GB class. Sized for 150 named users; see the sizing calculator.
Tool serverMCP or HTTP server exposing a small set of approved read operations with time and row capsNo free-form queries from the model. Every operation is parameterised and reviewed.
Identity and permissionsGalaxy areas and roles translated into per-role tag allow lists enforced in the tool serverNegative tests per role before each phase gate.
AuditAppend-only log of question, user, sources, tool calls, row counts and answerReadable by security. Retention per site policy. Hosting: On-prem server.

3. Security controls mapped to your inputs

ControlHow it is applied
Data residencyModel, embeddings, index, tool server and logs all run on Acme Precision Ltd infrastructure (On-prem server). No outbound calls for inference.
Data that must never leave the siteRecipe parameters, tags from restricted areas, alarm text that reveals protected process details, any export-controlled program data.
Least privilegeRead-only service identity; per-role allow lists; no admin accounts for the assistant.
Write-backNo writes to runtime attributes. Drafts only; approved records go to CMMS or ERP through their APIs.
Air-gap readinessModel weights and containers imported on approved media; embeddings run locally; no runtime internet dependency.
MonitoringAlerts on unusual query volume, denied-access spikes and tool errors.

4. Rollout in three phases

PhaseScopeExit criteria
1: Read-only questions (target 2027-02-01)One area or line, read-only questions with sources shown, for a pilot group of the 150 usersAnswer quality reviewed on a fixed question set; permission negative tests passed; audit log reviewed by security
2: DraftsDrafted shift summaries, deviation write-ups and reports that a person edits and ownsEdit rate and time saved measured; no unreviewed output enters a controlled record
3: Approved actionsRecords or requests created in downstream systems through supported APIs after human approvalApproval flow tested; rollback and audit proven; extension to further sites considered

5. Open questions for IT

1. Is there a Historian reporting tier or replica, or would analytical queries land on the collecting server? 2. Which SQL Server edition and version hosts the Runtime database, and who is the DBA owner? 3. How are Galaxy areas and security roles defined, and can they be exported to build allow lists? 4. Is alarm logging to SQL enabled, and for how long is it retained? 5. Which tags use cryptic names, and who can supply descriptions for the in-scope set? 6. Who owns the model and index lifecycle (updates, re-indexing, evaluation) after go-live? 7. Which approval board signs off each phase gate?

Approvals

IT / infrastructure / Date
Controls or OT owner / Date
Information security / Date
Business sponsor / Date

This is a planning starting point, not a design guarantee. Confirm interfaces, versions and licensing against the vendor documentation for your installed release before committing to a build. Keep the assistant read-only against controlled records.

Architecture review for your System Platform AI layer

Send your generated plan and a Netray engineer will review it with you and flag gaps in access, permissions and rollout. Optional.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the generator

Fill in the company, version, data layout, hosting model, named users and sites. Write the main use cases in plain language and, just as important, list the data that must never leave the site. Choose the GPU capacity you have or expect. The output document updates as you type. Export it, circulate it to IT, controls and security, and use the open questions as the agenda for a first review meeting.

  • Start with one area and one pilot group
  • Write the never-leave list first
  • Be honest about GPU availability
  • Treat the output as a draft for review, not a final design

What the plan contains

The plan has six parts: scope, a components table, security controls tied to your inputs, a three-phase rollout, open questions and an approvals block. The components table covers the six things every private AI layer needs: a data access path, a retrieval index, model serving, a tool server, identity and permissions, and audit. Each is stated in terms specific to AVEVA System Platform and Historian.

Design principles behind it

The design follows a few principles. The assistant reads through approved, parameterised tools instead of free-form queries. It inherits the permissions each user already has. It never writes to control systems and writes to business systems only through supported APIs after a person approves the payload. Everything it does is logged. Inference runs on your own hardware, so the plan works in an air-gapped site as well as an on-prem one.

Common mistakes to avoid

The usual failures are scoping too widely, giving the assistant an admin account for convenience, skipping negative permission tests, returning raw time-series or record dumps to the model instead of summaries, and ignoring data quality such as missing tag descriptions. Fix those in phase 1 and the later phases go much more smoothly.

Frequently Asked Questions

Does this work for an air-gapped site?

Yes. Choose Air-gapped as the hosting option. The design uses local models, a local index and a local audit log, with software imported on approved media and no runtime internet dependency.

Is the generated document a final design?

No. It is a structured starting point for review. Confirm interfaces, versions and licensing with the vendor documentation for your release, and adjust the components to what your IT team approves.

Which model should we use?

The plan assumes an open-weight model served with vLLM or Ollama. Which one fits depends on GPU memory, language needs and evaluation on your own question set, so test two or three candidates in phase 1.

Can the assistant change data in the system?

Not directly. The plan restricts it to read access, with write-back limited to supported APIs in business systems after a person approves each payload. Control-system writes are out of scope.

If you want a second pair of eyes on this plan for your environment, Netray designs and builds private AI layers for on-prem industrial and ERP systems, and can review the document with your team.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

AI on your ERP

Software