IFS Shop Order Status Reference
Shop orders are the backbone of IFS manufacturing, and most production issues show up as an order that is in the wrong status. This reference lays out the lifecycle in order, so planners and consultants can check where an order is and what should happen next.
| Step | Status or event | Type | What it means | What to check |
|---|---|---|---|---|
1 | Planned | Status | The order exists with a quantity and dates but is not yet released to the floor. | Quantity, dates, structure and routing revision |
2 | Release | Event | Moves the order from planned to released so work can be organised. | Material availability and capacity before release |
3 | Released | Status | The order is open for planning and material handling. | Operations, work centers and priorities |
4 | Material reservation | Event | Component quantities are reserved against stock for the order. | Shortages and substitute parts |
5 | Reserved | Status | Material has been reserved for the order. | Reservation completeness by component |
6 | Material issue | Event | Components are issued from stock to the order. | Lot or serial numbers and issued quantity |
7 | Start | Event | Production begins, usually triggered by first reporting or manual start. | Start date and first operation |
8 | Started | Status | Production is in progress on the order. | Open operations and reported quantity |
9 | Operation reporting | Event | Labor, machine time and quantities are reported against operations. | Run time, setup time and scrap |
10 | Scrap reporting | Event | Rejected quantity is reported with a reason. | Reason code and cost impact |
11 | Receipt of finished goods | Event | Completed quantity is received into inventory. | Receiving location and quantity |
12 | Backflush | Event | Components consumed automatically based on reported output. | Backflush settings per component |
13 | Cost review | Check | Compare reported cost to planned cost before closing. | Variances by material, labor and overhead |
14 | Close | Event | Finalises the order so no more reporting is allowed. | All operations reported and no open reservations |
15 | Closed | Status | The order is finished and costs are final. | Variance posting and archive rules |
16 | Cancel | Event | Stops an order that should not be produced. | Reservations, issued material and any reported time |
17 | Cancelled | Status | The order was cancelled before completion. | Reason, and stock or demand impact |
This is a general lifecycle guide. Status names, available events, and the exact behavior of release, reservation and close depend on your IFS release and site configuration. Confirm against your own system and process documentation.
Ask your IFS data about blocked orders
See how a read-only AI layer can answer which shop orders are blocked and show the query behind the answer.
Optional. The tool and every export work without this. No spam.
How to use the reference
Use the search box to find a status or event by name, or read down the steps in sequence. Each row says what the status means and what to check before moving on. Planners can use it to explain why an order is stuck, and trainers can use it as a one page lifecycle sheet. Export to Excel to adapt the wording to your own process.
- Search by status or event name
- Read the steps in order for training
- Use the check column as a review prompt
- Export and adapt to your process
Statuses versus events
A status is the state an order is in. An event is the action that changes the state or records progress. Confusing the two leads to wrong conclusions, for example assuming material was issued because the order is released. Releasing allows work to be organised, reserving sets aside stock, and issuing physically moves material to the order. Check each one separately.
Where orders get stuck
Typical blockers are shortages at reservation, missing routing or structure data on planned orders, operations that were never reported, and open reservations that block close. When an order will not close, look for unreported operations and unissued or unreturned material first. When it will not release, check structure, routing and any site specific release conditions.
Common mistakes
Planners often close orders before costs are reviewed, which pushes variances into the wrong period. Others cancel orders with reported time or issued material, leaving stock and cost cleanup behind. Treat close and cancel as final steps with a checklist, and agree who is allowed to perform them in production.
Frequently Asked Questions
Are these the exact IFS status names?
The core statuses such as Planned, Released, Reserved, Started, Closed and Cancelled are widely used in IFS, but the exact set and behavior depend on release and configuration. Verify against your own system.
Why can I not close my shop order?
Common reasons are unreported operations, open material reservations, or unfinished receipts. Review the operations and material tabs of the order and resolve each item before trying to close.
Does release issue material?
Not by itself. Release makes the order available for work. Reservation sets stock aside and issue moves it. Depending on your setup, some of these can be automated, so check your configuration.
Can I export this table?
Yes. The export bar downloads the reference as Excel, CSV or PDF so you can add site specific rules and ownership.
If you want production questions such as which shop orders are blocked and why answered in plain language from live IFS data, Netray can discuss a read-only approach.
Related Tools
IFS Cloud Projection OData URL Builder
Fill in host, realm, projection and entity set to generate the token request and a ready OData GET URL for IFS Cloud projections.
ERP OperationsIFS Cloud Upgrade Test Checklist
A grouped test checklist for IFS release updates and upgrades covering environments, core processes, integrations, reports, security and sign-off.
MES & Shop FloorPlex Production Scheduling Checklist
A grouped checklist covering master data, capacity, job readiness and daily routines for reliable scheduling in Plex.
More MES & Shop Floor tools
See all- Oracle Fusion OEE Work Center Calculator
- Infor VISUAL Shop Labor Ticket Log Worksheet
- VISUAL Shop Load Versus Capacity Calculator
- VISUAL Shop Resource Capacity and Load Calculator
- Plex Smart Manufacturing Data Source Request Template
- Plex Downtime Reason Log and OEE Worksheet
- Plex Go-Live Readiness Sign-Off Template
- OEE Calculator for Plex and MES Data
- Takt Time and Machine Count Calculator
New to IFS Applications? Start with the IFS Applications guide and toolkit.
Keep exploring
Free tools
- Infor LN Production Order Status and Lifecycle ReferenceLifecycle reference for LN production orders: statuses, what they allow, typical transactions and common blockers.
- IFS Shop Order Lead Time CalculatorEstimate how long a shop order really takes through its routing, and what share of that time is actual work, as a check on lead times stored in IFS.
- Electronic Component Lifecycle Status ReferenceSearchable guide to lifecycle terms such as NRND, last time buy, EOL and obsolete, with what each means and what a buyer or engineer should do.
ERP fixes and how-tos
- IFS Cloud Integration Options: Projections, Connect, Events and a MES ExampleCompare IFS Cloud integration options: projections and OData, IFS Connect, business events and workflows, with a worked MES integration example.
- IFS Cloud Workflow Example, External File Templates, Update Analyzer and PO StatusAn IFS Cloud workflow example plus practical notes on external file templates, the update analyzer, database views and reading purchase order status.
- IFS Cloud Versions: Release Names, Solution Sets and How to Check YoursHow IFS Cloud versions are named (22R1, 23R2 and so on), what solution sets such as aerospace and defense mean, and how to check your version.
Guides
- SyteLine IFS Framework Development GuideComplete guide to SyteLine IFS framework development. Form architecture, grid components, IDO binding, and IFS best practices for developers.
- Field Service ERP Work Order Lifecycle ManagementManage the complete work order lifecycle from creation through completion with integrated ERP costing, scheduling, and technician dispatch workflows.
- API Versioning and Lifecycle Management for SyteLineManage SyteLine API versions across upgrades and patches. Learn versioning strategies, backward compatibility, and migration planning for CloudSuite Industrial APIs.
AI on your ERP
- AI for IFS Cloud in aerospace and defense manufacturingAdd AI to IFS Cloud for aerospace and defense: projections, Aurena UX, Lobby, and engineer-to-order data, deployed on-prem or in your private cloud.
- IFS Field Service Management AI Integration: Private AI on IFS Cloud Service DataAI for IFS Field Service Management: service requests, work tasks, agreements and technician data via IFS Cloud APIs, joined to parts and finance. On-prem.
Integrations
- How to use ChatGPT with IFS CloudHow to use ChatGPT with IFS Cloud: custom GPT actions over OData, exports versus live access, enterprise data controls, and when a private model is safer.
- How to add WhatsApp to IFS CloudHow to connect WhatsApp Business to IFS Cloud using projections, Business Events and IFS Connect: order alerts, approvals and supplier replies into IFS.
Software
- IFS CloudIndependent guide to IFS Cloud, the ERP and enterprise asset and service platform: modules, integration options, limitations, alternatives and AI use cases.
- IFS Field Service ManagementIFS Field Service Management covers service orders, scheduling optimisation and mobile work within IFS Cloud. Modules, integrations, AI uses and alternatives.