AWS Filler Metal Classification Reference Chart
Filler metal designations look like code until you know the pattern. This chart decodes the most common SMAW, GMAW, GTAW and FCAW classifications and shows the AWS specification each belongs to.
| Classification | Process | AWS spec | Typical use | Note |
|---|---|---|---|---|
E6010 | SMAW | A5.1 | Root passes on pipe, dirty or rusty steel | High cellulose, DC electrode positive, deep penetration |
E6011 | SMAW | A5.1 | Same as E6010 where only AC is available | Cellulose type that runs on AC and DC |
E6013 | SMAW | A5.1 | Light fabrication, sheet and thin plate | Rutile type, easy arc, shallow penetration |
E7014 | SMAW | A5.1 | General fabrication, higher deposition | Iron powder rutile type |
E7018 | SMAW | A5.1 | Structural steel, pressure parts, thick sections | Low hydrogen; store dry in a rod oven |
E7024 | SMAW | A5.1 | High deposition fillets in flat and horizontal | Heavy iron powder coating |
E8018-B2 | SMAW | A5.5 | 1.25Cr-0.5Mo steel such as P11 grade | Low hydrogen; preheat and PWHT usually required |
E9018-B3 | SMAW | A5.5 | 2.25Cr-1Mo steel such as P22 grade | Low hydrogen; preheat and PWHT usually required |
E308L-16 | SMAW | A5.4 | 304 and 304L stainless | Low carbon to resist sensitization |
E309L-16 | SMAW | A5.4 | Carbon steel to stainless, overlay buffer layer | Higher Cr and Ni than the base metal |
E316L-16 | SMAW | A5.4 | 316 and 316L stainless | Molybdenum bearing for pitting resistance |
ER70S-3 | GMAW, GTAW | A5.18 | Clean carbon steel, general purpose | Lower deoxidizer content than S-6 |
ER70S-6 | GMAW, GTAW | A5.18 | Carbon steel with some mill scale or rust | Higher Mn and Si, widely stocked |
E70C-6M | GMAW (metal cored) | A5.18 | High deposition on plate and structural | M means argon-CO2 mix shielding |
E71T-1C | FCAW-G | A5.20 | All-position gas-shielded flux cored, CO2 gas | Rutile slag, good bead appearance |
E71T-1M | FCAW-G | A5.20 | All-position flux cored with Ar-CO2 mix | Less spatter than CO2 shielding |
E70T-1 | FCAW-G | A5.20 | Flat and horizontal high deposition | Not an all-position wire |
E71T-11 | FCAW-S | A5.20 | Self-shielded, outdoor or field work | No gas bottle; check toughness needs |
ER308L | GMAW, GTAW | A5.9 | 304 and 304L stainless | Most common austenitic filler |
ER309L | GMAW, GTAW | A5.9 | Dissimilar carbon to stainless joints | Also used as first overlay layer |
ER316L | GMAW, GTAW | A5.9 | 316 and 316L stainless | Marine and chemical environments |
ER347 | GMAW, GTAW | A5.9 | 321 and 347 stabilized stainless | Niobium stabilized |
ER4043 | GMAW, GTAW | A5.10 | Aluminum 6xxx and cast alloys | Al-5Si, fluid, lower crack tendency |
ER5356 | GMAW, GTAW | A5.10 | Aluminum 5xxx alloys | Al-5Mg, higher strength, better color match after anodizing |
ERNiCrMo-3 | GMAW, GTAW | A5.14 | Alloy 625 and dissimilar nickel joints | Nickel alloy filler for corrosion service |
ER80S-B2 | GTAW, GMAW | A5.28 | 1.25Cr-0.5Mo steel | Low alloy solid wire for creep-resistant steel |
Reading the digits: in E70xx and ER70S the 70 is the minimum tensile strength in ksi (about 480 MPa). Always confirm the classification against your WPS essential variables before substituting.
Trace filler metal lots to work orders
Optional: a review of how to link filler lot certificates to jobs in your ERP.
Optional. The tool and every export work without this. No spam.
How to use this chart
Search by classification such as E7018, by process such as FCAW, or by base metal such as 316. The Spec column tells you which AWS A5 document defines the classification, which matters when you write a purchase order or check a certificate of conformance. The Note column flags handling or usage points, like low hydrogen storage, that drive real shop problems.
Reading a classification
For covered electrodes, E means electrode, the next two digits give minimum tensile strength in ksi, the third digit gives the permitted positions, and the last digits describe coating and current type. For solid wire, ER means electrode or rod, S means solid, and the suffix such as 6 identifies the chemistry. For flux cored wire, T means tubular and the number after it identifies the flux type and shielding. Stainless fillers use the alloy number plus an L for low carbon.
Common selection mistakes
Substituting a filler without checking the WPS is the main compliance risk, but some errors are technical.
- Letting E7018 pick up moisture, which causes hydrogen cracking risk.
- Using ER70S-3 on rusty plate where S-6 tolerates more scale.
- Using ER4043 on 5xxx alloy where cracking and mismatched strength can follow.
- Welding carbon to stainless with 308L instead of a 309L type.
- Assuming one gas works for every flux cored wire: check the C or M designation.
Frequently Asked Questions
What does E7018 mean?
E means covered electrode, 70 means 70 ksi minimum tensile strength, 1 means usable in all positions, and 8 indicates a low hydrogen iron powder coating that works on AC or DC electrode positive. It must be stored and re-dried according to the manufacturer.
What is the difference between ER70S-3 and ER70S-6?
Both are solid carbon steel wires with 70 ksi tensile strength. ER70S-6 has more manganese and silicon deoxidizers, so it tolerates light mill scale and rust better. ER70S-3 is used on cleaner material. Your WPS may name one specifically.
Which filler do I use for carbon steel to stainless?
A 309 type filler such as ER309L or E309L is the usual choice, because its higher chromium and nickel offset dilution from the carbon steel. The final choice depends on the grades, service temperature and the WPS you qualified.
Is this table a substitute for the AWS A5 documents?
No. It is a quick reference for decoding names and typical use. The A5 specifications define chemistry, mechanical properties and test requirements. Use the actual spec and your qualified WPS when you buy or approve material.
If you want filler metal lots and certificates traced against work orders in your ERP, Netray can describe how teams set that up without replacing their quality system.
Related Tools
Welding Shielding Gas Selection Reference
Lookup table of typical shielding and purge gases by welding process and base metal, with effect and caution notes.
Industry TemplatesWelding Position Codes Reference (AWS and ISO)
Side-by-side lookup of AWS and ISO welding position designations for plate and pipe.
Engineering & PLMWelding Heat Input Calculator
Compute arc energy and net heat input from amps, volts, travel speed and process efficiency, and see how speed changes the result.
Quality & InspectionWeld Defects, Causes and Remedies Reference
Troubleshooting table that maps each weld imperfection to likely causes, how it is found and what to change.
More Industry Templates tools
See all- Welding Wire Deposition Rate Calculator
- Shielding Gas Consumption and Cost Calculator
- Welder Duty Cycle Calculator
- Welding Power Consumption and Cost Calculator
- Stick Electrode Consumption and Stub Loss Calculator
- AWS Welding Symbols Reference
- Distributor Free Freight Policy Template
- Job Shop Quote Cover Letter Template
- Monthly Operations Review Meeting Pack Template
Keep exploring
Free tools
- AWS Welding Symbols ReferenceSearchable lookup of the elements of a welding symbol: where each element sits, what it means and common reading mistakes.
- Welding Position Codes Reference (AWS and ISO)Side-by-side lookup of AWS and ISO welding position designations for plate and pipe.
- Filler Metal Consumption Calculator (Wire and Electrodes)Turns weld metal per meter, joint length and deposition efficiency into kilograms of filler to buy and the number of spools or boxes.
Guides
- How to Estimate Welding Cost for a Fabrication QuoteHow fabricators estimate welding cost: weld volume, deposition rate, arc-on time, filler efficiency, and where AI helps pull actual hours from past jobs.
- Weld Documentation and Compliance for Metal Fabrication ShopsWPS, PQR, welder qualification, CWI sign-off and material certs: what fabricators must document for AWS D1.1, D9.1 and customer audits, and how to track it.
- WPS and PQR Management Software for Welding ShopsHow welding shops manage WPS, PQR, and welder qualification records: AWS D1.1 and ASME IX basics, common audit gaps, and what software and AI can safely do.
AI on your ERP
- AI for E2 Shop System in Metal Fabrication: Quote History, Material Yield and Delivery RiskPrivate AI for E2 Shop System fabricators: sheet and plate quoting history, nesting yield, welding job costs and delivery risk, answered from your own data.
- AI for Dynamics 365 Business Central in Metal FabricationPrivate AI for Business Central metal fabricators: quote-to-job costing, heat-lot traceability, outside processing and remnant stock grounded in your data.
Manufacturing hubs
- FMA and the metal fabrication ecosystem: shops, standards and ERP realitiesThe Fabricators and Manufacturers Association serves metal fabrication, stamping and tube and pipe shops: ecosystem, standards, ERP and private AI.
- American Welding Society and welding fabrication: codes, records and ERP realitiesAmerican Welding Society codes, CWI certification and fabrication shops: D1.1, D17.1, WPS and welder records, plus the ERP, quoting and private AI problems they face.