Welding Heat Input Calculator (kJ/mm and kJ/in)
Heat input controls cooling rate, and cooling rate controls toughness, hardness and distortion. This calculator turns the three numbers on your welding machine and a travel speed measurement into kJ per millimeter and kJ per inch.
Your numbers
Measure over a known weld length and time. Do not use wire feed speed.
Factors follow EN 1011-1 practice; ASME and AWS often report arc energy without an efficiency factor.
Your results
Heat input limits come from your WPS and the governing standard. This calculator uses the common formula HI = (V x I x 60) / (speed x 1000) times efficiency. Always check whether your procedure limit is stated as arc energy or net heat input, and what efficiency factor applies.
Net heat input vs travel speed
Sweeps Travel speed from 100 to 600, holding your other inputs fixed.
Check WPS limits automatically
Ask for a short review of how welding parameter data could be checked against procedure limits.
Optional. The tool and every export work without this. No spam.
How to use it
Enter the arc voltage and current that you recorded during welding, not just the machine settings, because the actual values drift. Measure travel speed by timing a known length of weld. Choose the process efficiency your procedure uses. The output shows arc energy, net heat input in both unit systems, arc time and total energy for the run. Compare the net heat input with the minimum and maximum on the WPS. The chart shows how sensitive heat input is to travel speed.
- Use average values from a pass, not a peak reading
- Measure speed on the actual joint
- Convert travel speed units before entering
- Check the interpass temperature too
The formula and efficiency factors
Arc energy equals volts times amps times 60 divided by travel speed in mm/min and divided by 1000, giving kJ per mm. Net heat input multiplies arc energy by thermal efficiency, since not all arc power ends up in the workpiece. EN 1011-1 lists factors such as 1.0 for submerged arc, 0.8 for MMA and gas shielded metal arc, and 0.6 for TIG. US codes frequently quote heat input without a process factor, so be sure which basis your WPS uses. Pulsed processes require the average or an RMS based calculation per your standard.
Reading the result
With 24 V, 220 A and 300 mm/min, arc energy is about 1.06 kJ/mm, and net heat input with an efficiency of 0.8 is about 0.84 kJ/mm, or about 21 kJ/in. Slowing the travel speed raises heat input proportionally, which can soften fine grained steels and reduce impact toughness. Speeding up lowers it, which raises cooling rate and hardness risk in carbon manganese steels and increases the chance of lack of fusion. Austenitic and duplex stainless steels also have maximum heat input limits.
Common mistakes
Heat input errors are almost always unit or measurement errors.
- Using wire feed speed instead of travel speed
- Mixing mm/min with in/min
- Applying an efficiency factor when the WPS limit is arc energy
- Using the voltage setting on the machine instead of at the arc
- Ignoring the effect of weave width on effective travel speed
Frequently Asked Questions
What is the formula for welding heat input?
Heat input in kJ/mm equals volts times amps times 60 divided by travel speed in mm/min times 1000, multiplied by thermal efficiency when the standard requires it. In inch units multiply the kJ/mm result by 25.4 to get kJ/in.
Which efficiency should I use?
Use the one required by your standard or WPS. EN 1011-1 gives typical values such as 1.0 for SAW, 0.8 for MMA, MAG and flux cored, and 0.6 for TIG. If your WPS states arc energy, do not apply a factor.
Why does heat input matter for steel?
It affects cooling rate. Too low can cause hard heat affected zones and cracking in hardenable steels, too high can reduce toughness and strength. Many procedures set both minimum and maximum limits and tie them to preheat.
How do I measure travel speed?
Mark a length of joint, time the welder from start to finish and divide length by time. For mechanized welding read the carriage speed setting. Use the true speed along the joint, not the weave pattern.
If you capture current, voltage and travel speed in an MES or weld monitoring system, we can help check heat input against the WPS automatically.
Related Tools
Weld Repair Procedure Template
Document a weld repair from defect location through excavation, rewelding, NDE and sign-off, then export it as a clean controlled document.
Quality & InspectionWelding Consumables Issue Log Worksheet
Track electrodes, wire and flux issued to each job, returned stock and consumption by heat or lot number for traceability and costing.
MES & Shop FloorWelding Production Daily Report Template
Summarize each shift of welding: crew, joints completed, hours, consumables used, delays and quality issues, in a clean exportable report.
Safety & WorkforceWelder Continuity Log Worksheet
Keep a row-by-row log of welder qualifications, processes used and last weld dates so no qualification lapses unnoticed.
More Engineering & PLM tools
See all- Weld Metal Volume and Weight Calculator (V-Groove)
- Preheat Temperature and Carbon Equivalent Calculator
- SAP Super BOM Design Worksheet
- SAP Engineering Change Number Checklist
- SAP Document Info Record Template
- SAP Change Master and Revision Level Log
- SAP Engineering Change Request (ECR) Template
- SAP BOM Usage and Item Category Reference
- SAP Engineering Change Obsolescence Exposure Calculator
Keep exploring
Free tools
- Welding Power Consumption and Cost CalculatorEstimate input power, supply current and electricity cost of a welding power source from arc volts, amps, efficiency and tariff.
- Welding Process Deposition Efficiency and Operating Factor ReferencePlanning ranges for deposition efficiency, operating factor, deposition rate and typical use by arc welding process.
- Laser Pulse Overlap and Heat Input CalculatorWork out pulse spacing, overlap and line energy for a scanning or moving pulsed laser from speed, repetition rate, spot size and power.
AI on your ERP
- AI for Dynamics 365 Business Central in Metal FabricationPrivate AI for Business Central metal fabricators: quote-to-job costing, heat-lot traceability, outside processing and remnant stock grounded in your data.
- AI for ERP in Metal Fabrication: Nesting, Traceability and QuotingPrivate AI on your ERP for fab shops: nesting yield, remnants, MTR and heat traceability, weld procedure records, outside processing and quote turnaround.