Baan AI Assistant Sizing and Value Calculator
This calculator sizes the hardware and estimates the value of a private AI assistant running on your own servers in front of Baan. Enter user numbers, usage and your own assumptions to get GPU count, index size and payback.
Your numbers
Share of named users who ask at least one question per day.
Includes retrieved context. Document questions run higher than record lookups.
Assumption: depends on model size, quantisation and GPU. Measure on your hardware.
Amortised hardware, power and hosting.
Your results
Planning estimate only. Tokens per second, minutes saved and active share are assumptions you must replace with measured or surveyed numbers.
Monthly value vs GPU cost by named users
Sweeps Named users from 50 to 2000, holding your other inputs fixed.
Validate my Baan sizing
Optional: share your numbers and get a short review of GPU count, index size and pilot plan.
Optional. The tool and every export work without this. No spam.
How to use it
Start with named users and the share who ask a question on a given day, then the number of questions and the average tokens for a prompt plus answer. Enter the documents you want searchable and the minutes a good answer saves. The outputs update live, and the chart sweeps named users.
- Use a pilot or survey to set the active share; 10 to 25 percent is common for early rollouts.
- Document questions use more tokens than record lookups, so raise the average if retrieval is heavy.
- Replace the tokens-per-second default with a measured figure for your model and GPU.
The formulas
Questions per day equals named users times active share times questions per user. Tokens per day is questions times tokens per question. Peak tokens per second is busiest-hour questions divided by 3,600 times tokens per question; GPUs are that figure divided by tokens per second per GPU, rounded up, plus spares. Index size is documents times pages times 3 chunks times 1,024 floats at 4 bytes with 50 percent overhead. Monthly value is questions times working days times minutes saved divided by 60, times loaded hourly cost.
How to read the result
If monthly value is well above GPU cost, payback is short and the sizing is not the constraint. If it is close, the assumptions on minutes saved and active share matter most; test them in a pilot before buying hardware. Index size is usually small compared with the model weights; the GPU count is driven by peak concurrency, not by user count alone.
Common mistakes and Baan notes
Typical errors: using average load instead of the busiest hour, ignoring spares, and counting every user as active. For Baan the data comes from your own system and documents, so no per-seat cloud fee applies; hardware, power, setup and people are the cost. Vendor tools may be enough if you only need standard reports.
- Assume nothing about throughput until you measure.
- Keep a spare GPU or a failover plan for working hours.
- Check licence terms of the open-weight model you choose.
Frequently Asked Questions
What tokens per second should I use?
The default is a planning figure for batched serving of a mid-size open-weight model on one modern GPU. Real throughput depends on model, quantisation, context length and software, so benchmark vLLM or Ollama on your hardware.
Why does peak matter more than daily volume?
GPUs must serve the busiest hour, not the daily average. If a quarter of questions land in one hour, capacity must cover that burst or users wait.
Is the value figure reliable?
It is only as good as minutes saved per question and the active share. Use a small pilot with timed tasks to set them, then treat the result as a range.
Does the index size include the model?
No. Index size covers vectors for your documents. Model weights add roughly several GB to tens of GB per model depending on size and quantisation.
If you want these numbers validated against your Baan data volumes and a pilot, Netray can help you measure real usage and size the hardware.
Related Tools
Baan Private AI Layer Blueprint Generator
Fill in your Baan environment and get a ready-to-share architecture plan for a private, on-prem AI assistant.
On-Prem AIGPU Sizing Calculator for LLM Inference
Work out how many GPUs you need to serve a given open-weight model to your user base, based on memory footprint and token throughput.
On-Prem AIOn-Prem AI ROI Calculator
Turn hours saved per employee into annual net benefit, payback months, and 3-year ROI for an on-prem AI investment.
On-Prem AIOn-Prem AI Deployment Checklist
A 30-point pre-deployment checklist covering use cases, hardware, security, model operations, and rollout for self-hosted enterprise LLMs.
More Infor LN & Baan tools
See all- Baan to Infor LN Migration Readiness Assessment
- Baan IV End-of-Life Risk Cost Calculator
- Infor LN Upgrade Cost Estimator
- Infor LN vs SyteLine Selector
- Baan Data Migration Effort Calculator
- Infor LN Multi-Site Rollout Planner
- Infor LN Customization Complexity Scorer
- Baan Modernization ROI Calculator
- Infor LN Performance Tuning Checklist
New to Infor LN and Baan? Start with the Infor LN and Baan guide and toolkit, or plan with Training Path Builder, Upgrade Path Planner, ERP Table and Field Explorer.
Keep exploring
Free tools
- Infor LN AI Assistant Sizing and Value CalculatorSize the GPUs and estimate the monthly value and payback of a private, on-prem AI assistant for Infor LN.
- Baan Private AI Layer Blueprint GeneratorFill in your Baan environment and get a ready-to-share architecture plan for a private, on-prem AI assistant.
- Baan Purchase Order TemplateA printable purchase order layout modeled on what Baan and Infor LN print, with header, line table and terms. Use it as a reference when rebuilding the PO report.
Guides
- BAAN 5 to Infor LN Complete Migration GuideMigrate from BAAN 5 to Infor LN comprehensively. 4GL analysis, data transformation, business process mapping, and organizational change management.
- Baan to SAP Migration vs Infor LN: Baan ERP vs SAP S/4HANABaan to SAP migration versus Infor LN: compare functional fit, the 12-18 vs 18-30 month timelines, customization rework and cost for Baan ERP manufacturers.
Integrations
- How to add an AI chatbot to Baan IV and Baan VAdd an AI chatbot to Baan IV or Baan V: grounded in ERP data and documentation, usable by staff and customers, and able to run fully on-prem with open models.
- How to connect Claude to Baan IV and Baan VConnect Claude to Baan IV or Baan V: MCP connectors, Anthropic API versus AWS Bedrock or Google Vertex, data handling, and the on-prem option for sensitive data.