Infor LN & BaanFree calculatorPDF, Excel, Word exportInfor LNAll Infor LN and Baan tools

Infor LN AI Assistant Sizing and Value Calculator

This calculator sizes the hardware and estimates the value of a private AI assistant running on your own servers in front of Infor LN. Enter user numbers, usage and your own assumptions to get GPU count, index size and payback.

Your numbers

users
20 %

Share of named users who ask at least one question per day.

questions
tokens

Includes retrieved context. Document questions run higher than record lookups.

25 %
s
tokens/s

Assumption: depends on model size, quantisation and GPU. Measure on your hardware.

GPUs
documents
pages
min
$/h
days
$/month

Amortised hardware, power and hosting.

$

Your results

GPUs needed incl. spare
2
Peak tokens per second divided by tokens per second per GPU, plus spares.
Monthly value
$40,320
Daily active users
80
Questions per day
640
Tokens per day
1,600,000
Questions per day times average tokens per question.
Peak concurrent requests
1
Busiest-hour questions per second times seconds of work per question, rounded up.
Vector index size
44.2368
Gigabytes, assuming 3 chunks per page, 1024-dimension float32 vectors and 50 percent overhead.
Hours saved per month
896 hrs
Monthly GPU cost
$3,600
Payback
1.6 months
One-time setup divided by monthly value minus GPU cost. Zero means no payback.

Planning estimate only. Tokens per second, minutes saved and active share are assumptions you must replace with measured or surveyed numbers.

Free, optional. Reopen it on any device.
Save results:

Monthly value vs GPU cost by named users

Sweeps Named users from 50 to 2000, holding your other inputs fixed.

Validate my Infor LN sizing

Optional: share your numbers and get a short review of GPU count, index size and pilot plan.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Start with named users and the share who ask a question on a given day, then the number of questions and the average tokens for a prompt plus answer. Enter the documents you want searchable and the minutes a good answer saves. The outputs update live, and the chart sweeps named users.

  • Use a pilot or survey to set the active share; 10 to 25 percent is common for early rollouts.
  • Document questions use more tokens than record lookups, so raise the average if retrieval is heavy.
  • Replace the tokens-per-second default with a measured figure for your model and GPU.

The formulas

Questions per day equals named users times active share times questions per user. Tokens per day is questions times tokens per question. Peak tokens per second is busiest-hour questions divided by 3,600 times tokens per question; GPUs are that figure divided by tokens per second per GPU, rounded up, plus spares. Index size is documents times pages times 3 chunks times 1,024 floats at 4 bytes with 50 percent overhead. Monthly value is questions times working days times minutes saved divided by 60, times loaded hourly cost.

How to read the result

If monthly value is well above GPU cost, payback is short and the sizing is not the constraint. If it is close, the assumptions on minutes saved and active share matter most; test them in a pilot before buying hardware. Index size is usually small compared with the model weights; the GPU count is driven by peak concurrency, not by user count alone.

Common mistakes and Infor LN notes

Typical errors: using average load instead of the busiest hour, ignoring spares, and counting every user as active. For Infor LN the data comes from your own system and documents, so no per-seat cloud fee applies; hardware, power, setup and people are the cost. Vendor tools may be enough if you only need standard reports.

  • Assume nothing about throughput until you measure.
  • Keep a spare GPU or a failover plan for working hours.
  • Check licence terms of the open-weight model you choose.

Frequently Asked Questions

What tokens per second should I use?

The default is a planning figure for batched serving of a mid-size open-weight model on one modern GPU. Real throughput depends on model, quantisation, context length and software, so benchmark vLLM or Ollama on your hardware.

Why does peak matter more than daily volume?

GPUs must serve the busiest hour, not the daily average. If a quarter of questions land in one hour, capacity must cover that burst or users wait.

Is the value figure reliable?

It is only as good as minutes saved per question and the active share. Use a small pilot with timed tasks to set them, then treat the result as a range.

Does the index size include the model?

No. Index size covers vectors for your documents. Model weights add roughly several GB to tens of GB per model depending on size and quantisation.

If you want these numbers validated against your Infor LN data volumes and a pilot, Netray can help you measure real usage and size the hardware.