BIS Certification (ISI Mark and CRS) Checklist for Indian Manufacturers
Many products sold in India need Bureau of Indian Standards certification before they can be manufactured, imported or sold. This checklist breaks the process into scheme choice, product readiness, testing, factory system, application and post-grant duties, so your team knows what to line up.
0 of 32 items complete
11 critical items still open - these are the highest-risk gaps.
Applicability and scheme choice
Standard and product readiness
Testing
Factory and quality system
Application and grant
After the grant
BIS procedures, forms and fees are revised often. Use this list to prepare, then confirm current steps on the BIS portal or with a BIS consultant before applying.
Link certificates and calibration to ERP records
Optional: discuss tracking BIS licence validity and test records against items and lots.
Optional. The tool and every export work without this. No spam.
How to use this checklist
Start with the first group, because many delays come from choosing the wrong scheme or standard. Then assign each remaining group to an owner: design for standard mapping, quality for testing and factory system, and compliance for filing. Tick items only with a document in hand. Export the list and review it weekly during the application period. If an item cannot be ticked, record the blocker and the date you expect it to close.
How BIS certification works
Under the BIS Act, 2016, mandatory certification is notified through Quality Control Orders issued by the department that regulates the product. For most notified products, the manufacturer applies for an ISI Mark licence, which involves product testing in a recognised laboratory and an inspection of the factory's quality control. Electronics and IT goods fall under the Compulsory Registration Scheme, where the lab report supports a registration. Foreign manufacturers follow a similar route with their own scheme.
- Standard, scheme and fee depend on the product
- Factory inspection looks at testing and quality control
- Licence needs renewal and ongoing surveillance
Reading your result
If most critical items are open, hold off on applying, because a failed inspection or test wastes time and fees. Focus first on the standard mapping, lab selection and the in-house testing capability, since these gate the other steps. Once the pre-application groups are complete, the filing and inspection phases tend to move predictably. Keep the completed list in your licence file as evidence of the preparation.
Common mistakes
Frequent problems include testing the wrong variant, using an outdated standard, ignoring components that carry their own BIS requirement, and allowing calibration to lapse before the factory inspection. After grant, plants forget to mark every unit or to renew on time. Tie licence validity, marking fees and calibration due dates to records in your ERP or quality system.
Frequently Asked Questions
What is the difference between ISI Mark and CRS?
The ISI Mark scheme certifies products against an Indian Standard with a factory licence and ongoing surveillance. The Compulsory Registration Scheme covers notified electronics and IT products and relies on a recognised lab test report and registration. Which one applies depends on the product notification.
How long does BIS certification take?
It varies by product, lab queue and how ready the factory is. Plants that arrive with a mapped standard, calibrated equipment and a documented quality plan generally move faster than those fixing gaps during inspection. Plan for months, not weeks, and confirm timelines with BIS.
Do I need my own test lab?
Many schemes expect the factory to have at least the routine testing capability needed for production checks, with type tests done at a recognised lab. The exact requirement is in the scheme and the standard for your product, so confirm it during scheme selection.
Can an importer or trader apply?
Certification is tied to the manufacturer. Indian importers typically deal with products made by a foreign manufacturer who holds BIS certification under the foreign manufacturer scheme, or who registers under CRS. Check the current rules for your product category before ordering.
If you want licence, lab report and calibration records linked to items and lots in your ERP, we can help design that traceability.
Related Tools
Factories Act 1948 Compliance Checklist for Indian Plants
A section-wise checklist covering licensing, health, safety, welfare, working hours, leave and registers for factories in India.
Compliance & ContractsIndia Plant Statutory Compliance Calendar Worksheet
A fill-in tracker of recurring labour, tax and factory obligations with due rules, owner, last filed date, status and challan amount.
Compliance & ContractsPLI Scheme Readiness Assessment for Indian Manufacturers
A 10-question score of how ready your company is to apply for and claim a Production Linked Incentive, with recommendations by band.
Country & TaxIndia Export Documents Reference for Manufacturers
A searchable table of the documents Indian exporters commonly prepare or obtain, with issuer, purpose and when each is used.
More Compliance & Contracts tools
See all- SAP SoD Residual Risk Score Calculator
- SAP Firefighter ID Usage Review Log
- IBM i (AS/400) User Profile Access Review Worksheet
- SyteLine Security and User Access Audit Checklist
- Infor XA (MAPICS) User Access Review Worksheet
- China ERP Data Security and Compliance Assessment
- ERP Vendor Data Processing Agreement Outline
- GDPR ERP Data Migration Checklist
- EU Machinery Regulation 2023/1230 Readiness Checklist
Keep exploring
Free tools
- PLI Scheme Readiness Assessment for Indian ManufacturersA 10-question score of how ready your company is to apply for and claim a Production Linked Incentive, with recommendations by band.
- Monthly GST Compliance Checklist for Indian ManufacturersA month-end GST routine for Indian plants covering sales, purchases, ITC, job work, e-way bills and return filing.
- CE Marking Conformity Readiness AssessmentAnswer nine questions on directives, standards, technical file and declaration to see how ready you are to affix the CE mark.
Guides
- Infor LN Reporting Limitations and SolutionsSolve Infor LN reporting limitations. Compare built-in reports, BIS, Birst, Power BI, and custom SQL solutions for manufacturing analytics.
- Product Cost Management: Getting the Numbers RightProduct cost management in ERP: standard vs actual costing, cost roll-ups, overhead absorption, and variance analysis that keeps item costs accurate.
- SyteLine Certification Paths and Career Progression GuideNavigate SyteLine certification paths and career progression. Infor certification tracks, exam preparation, and salary benchmarks for CloudSuite Industrial consultants.