Buy American Act Domestic Content Calculator
Under the Buy American Act, a manufactured end product is domestic when it is manufactured in the United States and the cost of its domestic components exceeds a set percentage of the cost of all components. This calculator does the arithmetic and shows how much sourcing would have to shift to pass.
Your numbers
Components mined, produced or manufactured in the United States.
Components from non-domestic sources. Include components of unknown origin here.
Your results
Simplified test of the cost-of-components approach. Applicable thresholds, exceptions for commercially available off-the-shelf items, trade agreement coverage and the Defense Federal Acquisition Regulation Supplement may change the answer. Confirm with your contracts counsel.
Domestic content vs domestic component spend
Sweeps Cost of domestic components from 0 to 900000, holding your other inputs fixed.
Country-of-origin rollup from your ERP BOM
Optional: see how origin data on items and suppliers can drive an automatic domestic content calculation.
Optional. The tool and every export work without this. No spam.
How to use the calculator
Take your bill of materials and total the cost of components that are domestic and those that are not. Unknown origin counts as foreign until a supplier certifies otherwise. Enter both numbers, select the threshold that applies to your solicitation and the number of units in the award. The primary results are your domestic content percentage and the dollar shortfall, if any, needed to reach the threshold.
The test behind the numbers
The Federal Acquisition Regulation defines a domestic end product as one manufactured in the United States where the cost of domestic components exceeds the required percentage of the cost of all components. The percentage has been stepped up over time, with the current civilian figure at 65 percent and a later step planned for 75 percent. Component cost generally means the acquisition cost including transportation to the place of manufacture, duty and applicable overhead, but not the manufacturer's own labor on the end product. Confirm the version of the clause in your solicitation.
- Manufactured in the United States
- Domestic component cost over a set share of all component cost
- Thresholds depend on the date and clause in the solicitation
- Unknown origin should be treated as foreign
Using the shortfall
If your product fails the test, the shortfall tells you how much spend to move. Rank foreign components by cost and check whether a domestic source exists at an acceptable price. Replacing one expensive foreign subassembly can close the gap faster than changing many small parts. The chart shows how the percentage climbs as domestic spend rises, which helps purchasing and engineering set targets on a redesign.
Common mistakes and ERP notes
Frequent mistakes include using sales price instead of component cost, forgetting transportation and duty in component cost, treating country of the supplier address as country of origin of the part, and ignoring exemptions or trade agreements that change which test applies. Store country of origin on the item and supplier record in your ERP and require supplier declarations so the calculation can run from a BOM rollup instead of a one-time spreadsheet.
Frequently Asked Questions
What percentage of a product must be domestic?
For most current civilian procurements the domestic component cost must exceed 65 percent of the total component cost, with a planned step to 75 percent later. Earlier contracts used lower percentages. Check the clause and date in your solicitation because the threshold depends on both.
Does labor count toward domestic content?
The test is a cost of components test. The manufacturer's own labor on the end product is not part of the component cost used here. The product must be manufactured in the United States, but assembly labor does not raise the component percentage.
How do I treat parts of unknown origin?
Treat them as foreign for the calculation until the supplier provides a documented country of origin. Asking suppliers for a signed origin declaration is a practical step, and it also protects you in an audit by showing you made reasonable efforts.
Is this the same as the Trade Agreements Act?
No. The Buy American Act and the Trade Agreements Act use different tests. The Trade Agreements Act relies on substantial transformation and designated country origin. Which law applies depends on contract value, agency and the product, so confirm with contracts counsel.
Netray can help add country-of-origin data to your item master and run a domestic content rollup from your ERP bill of materials with your contracts team reviewing the result.
Related Tools
USMCA Rules of Origin Checklist
Step through classification, the product-specific rule, regional value content, certification and record keeping for USMCA claims.
Compliance & ContractsMade in USA Claim Compliance Checklist
Check whether an unqualified Made in USA label is supportable, and how to write a qualified claim when it is not.
Compliance & ContractsDomestic Origin Supplier Affidavit Template
A fill-in declaration a supplier signs to state country of manufacture and the share of domestic content for listed part numbers.
Compliance & ContractsUSMCA BOM Regional Value Content Worksheet
List BOM components, flag non-originating materials and see the estimated regional value content before you certify origin.
More Compliance & Contracts tools
See all- US Manufacturing RFQ Flow-Down Clause Reference
- SAP SoD Residual Risk Score Calculator
- SAP Firefighter ID Usage Review Log
- IBM i (AS/400) User Profile Access Review Worksheet
- SyteLine Security and User Access Audit Checklist
- Infor XA (MAPICS) User Access Review Worksheet
- China ERP Data Security and Compliance Assessment
- ERP Vendor Data Processing Agreement Outline
- GDPR ERP Data Migration Checklist
Keep exploring
Free tools
- Domestic Origin Supplier Affidavit TemplateA fill-in declaration a supplier signs to state country of manufacture and the share of domestic content for listed part numbers.
- USMCA Regional Value Content (RVC) CalculatorCheck whether a good meets a USMCA RVC threshold by transaction value or net cost, and how much non-originating material you can tolerate.
- EU AI Act Risk Tier Reference for ManufacturersMap your ERP and shop-floor AI use cases to EU AI Act tiers, roles and obligations with plain-language notes.
Guides
- Build vs Buy: The Real Cost of Enterprise AI AgentsBuild vs buy AI agents for the enterprise: total cost, timelines, and risk compared for manufacturers, with a decision framework CIOs can use today.
- EU AI Act Implications for On-Premises AI DeploymentsEU AI Act implications for on-prem deployments: risk tiers, high-risk obligations, and how self-hosted models simplify enterprise compliance.
- Fastener Quality Act: Lot Traceability Requirements for ManufacturersWhat the Fastener Quality Act means in practice for US fastener makers: lot identification, insignia, certs, record retention and how your ERP supports it.
AI on your ERP
- EU AI Act Compliance for AI Built on Your ERPHow the EU AI Act's risk classes, documentation, and timeline apply to AI copilots and agents on ERP systems, and what compliance officers need in place.
- Build vs Buy: Should You Use Your ERP Vendor's AI Copilot, or Build Your Own?SAP Joule, Copilot for D365, Infor GenAI, Oracle AI Agent Studio, or a private LLM on your own data. A CIO framework for the build vs buy decision, with real trade-offs.
Manufacturing hubs
- Manufacturing in Winnipeg, Manitoba: aerospace, buses and agricultural equipmentWinnipeg manufacturing guide: aerospace, transit buses, agricultural equipment, AS9100 and Controlled Goods rules, and ERP and quoting problems shops face.
- American Bearing Manufacturers Association (ABMA): bearing standards, quality and ERPABMA bearing manufacturers ecosystem: load rating and tolerance standards, ABEC grades, traceability, plus ERP, quoting and private AI for bearing makers.