Made in USA Claim Compliance Checklist
The Federal Trade Commission treats an unqualified Made in USA claim as meaning that the product is all or virtually all made in the United States. Mistakes can lead to enforcement and customer complaints. This checklist helps manufacturers test their claim and keep the proof.
0 of 28 items complete
9 critical items still open - these are the highest-risk gaps.
Is the claim unqualified?
All or virtually all test
Qualified claim options
Substantiation records
Ongoing control
An unqualified Made in USA claim is a strong statement. If any critical item cannot be supported, change the claim or the product before continuing. This checklist is a planning aid and not legal advice.
Origin data on your item master
Optional: see how country-of-origin fields and change alerts can be added to an ERP so claims stay supportable.
Optional. The tool and every export work without this. No spam.
How to use the checklist
Gather the bill of materials, supplier list and every piece of marketing that mentions origin. Work through the groups for one product at a time. Mark an item complete only if you have a document that supports it, such as an affidavit or cost breakdown. If a critical item fails, move to the qualified claim group and choose wording that matches the facts, then record the decision in the claim log.
The standard behind an unqualified claim
The FTC's Made in USA Labeling Rule and its enforcement policy statement say that a product claimed as Made in USA should be last substantially transformed in the United States, with all significant processing done here, and with all or virtually all of its ingredients or components made and sourced here. The more foreign content, or the more important that content is to the product, the less likely the claim holds. A product with minor foreign content may still qualify, which is why cost share and significance both matter.
- Final assembly or processing in the United States
- All significant processing done in the United States
- All or virtually all inputs made and sourced here
- Foreign content judged on cost share and importance
Qualified claims and marketing
When the unqualified standard is not met, a qualified claim can be accurate, such as Assembled in USA with global parts. The wording must be clear and placed with the origin claim, not hidden. Marketing is where problems usually start: a flag graphic on a web page, a distributor listing or a sales sheet can make an origin claim that the label does not. Treat every channel as part of the same claim.
Common mistakes and ERP notes
Common mistakes include assuming a US supplier address means a US-made part, ignoring foreign content in sub-tier components, and failing to re-test after a supplier change. Store country of origin on the item and supplier in the ERP and add an origin review to engineering change and supplier approval workflows, so a change in sourcing triggers a check before the label or website says something that is no longer true.
Frequently Asked Questions
What does Made in USA legally mean?
Under FTC guidance, an unqualified claim means the product is all or virtually all made in the United States: final assembly here, all significant processing here, and all or virtually all components made and sourced here. Qualified claims can be used when the product does not meet that standard.
Can a product with some imported parts say Made in USA?
Only if the foreign content is negligible. If imported parts are significant in cost or function, the product does not meet the standard, and a qualified claim such as Made in USA with imported parts is the safer route. Document the cost share and significance for each foreign input.
Does Assembled in USA have its own rule?
Yes. An Assembled in USA claim can be accurate when the principal assembly happens here and the assembly is substantial, even with imported parts. It still needs to avoid suggesting greater domestic content, and the product must be last substantially transformed in the United States.
Who is responsible for a retailer's listing?
Both. If you supply the product and wording, or let a false claim stand, you can share responsibility with the retailer. Give partners approved wording in writing and monitor listings and marketing for claims that exceed what your records support.
Netray can help add origin fields to your ERP item master and flag sourcing changes that could affect a Made in USA claim, for your compliance team to review.
Related Tools
Buy American Act Domestic Content Calculator
Check whether a manufactured end product meets the domestic content percentage by comparing domestic and foreign component cost.
Compliance & ContractsDomestic Origin Supplier Affidavit Template
A fill-in declaration a supplier signs to state country of manufacture and the share of domestic content for listed part numbers.
Compliance & ContractsUSMCA Rules of Origin Checklist
Step through classification, the product-specific rule, regional value content, certification and record keeping for USMCA claims.
Compliance & ContractsManufacturing Sales Tax Exemption Certificate Template
Generate a state-neutral exemption certificate a manufacturer can give a vendor for materials, equipment or resale purchases.
More Compliance & Contracts tools
See all- Texas Manufacturing Exempt Purchase Log Worksheet
- US Duty Drawback Eligibility Checklist
- SAP SoD Residual Risk Score Calculator
- SAP Firefighter ID Usage Review Log
- IBM i (AS/400) User Profile Access Review Worksheet
- SyteLine Security and User Access Audit Checklist
- Infor XA (MAPICS) User Access Review Worksheet
- China ERP Data Security and Compliance Assessment
- ERP Vendor Data Processing Agreement Outline
Keep exploring
Free tools
- Product of Canada vs Made in Canada CalculatorEnter the Canadian and foreign direct costs of a product to test it against the 51 percent Made in Canada and 98 percent Product of Canada thresholds.
- Freight Damage Claim Documentation ChecklistA step-by-step checklist for documenting cargo damage, shortage or loss at delivery and filing a carrier claim before the notice deadlines run out.
- Freight Damage Claim Form TemplateA fill-in freight claim form for damaged or short shipments, with a document checklist. Exports to PDF, Word or Excel.
Guides
- Warranty Management for Manufacturers: Entitlement, Claims, and RecoveryWarranty management for manufacturers: registration, entitlement, claim adjudication, supplier recovery, ASC 460 accrual, and Infor ERP warranty data.
- AI-Powered Defense Manufacturing ComplianceEnsure defense manufacturing compliance with AI. Automated ITAR, DFARS, CMMC, and export control management for defense contractors and subcontractors.
- SyteLine Printing and Label Solutions GuideConfigure SyteLine printing and labeling. Barcode label design, print server setup, document output management, and label compliance for manufacturers.
AI on your ERP
- AI for Infor LN Warehousing: Inventory, Inbound and Outbound Exceptions Made SearchableAI for Infor LN Warehousing: trace inventory discrepancies and inbound or outbound exceptions in plain language. On-prem option, approval on writes.
- AI for Warranty Claims and Returns (RMA): Check Coverage, Find Failure Patterns and Close the Loop to QualityAI for warranty claims and returns on top of your ERP: check coverage, find failure patterns, draft RMA decisions and feed quality, with human approval throughout.