Compliance & ContractsFree referencePDF, Excel, Word exportAerospace & DefenseUnited States

US Manufacturing RFQ Flow-Down Clause Reference

Subcontract RFQs and purchase orders often cite clause numbers with little explanation, and the cost impact is rarely in the part price line. This reference helps estimators and contracts staff decode the common ones and know what to check before quoting.

Download:
Clause / standardTitleAreaWhat it generally coversWhat to check when quoting
FAR 52.204-21
Basic Safeguarding of Covered Contractor Information Systems
Cybersecurity
Fifteen basic safeguarding requirements for systems that hold federal contract information.
Confirm your IT meets basic controls; cost of any gaps.
DFARS 252.204-7012
Safeguarding Covered Defense Information and Cyber Incident Reporting
Cybersecurity
Requires adequate security (NIST SP 800-171) on systems with covered defense information and cyber incident reporting within 72 hours.
Whether drawings are CDI; whether your systems meet 800-171; cloud provider must meet FedRAMP Moderate equivalent.
DFARS 252.204-7019 / 7020
NIST SP 800-171 DoD Assessment Requirements
Cybersecurity
Requires a current assessment score posted in SPRS and access for DoD assessors.
Confirm a current basic assessment is on file before award.
DFARS 252.204-7021
Contractor Compliance with the CMMC Level Requirements
Cybersecurity
Requires the CMMC level specified in the solicitation or contract to be maintained.
Identify the required CMMC level and your status.
FAR 52.204-25
Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment
Sourcing
Prohibits use of covered telecommunications equipment (Section 889).
Check purchased electronics and your own systems.
DFARS 252.225-7009
Restriction on Acquisition of Certain Articles Containing Specialty Metals
Sourcing
Requires specialty metals such as certain titanium, steel and nickel alloys to be melted or produced in the US or a qualifying country.
Mill source and melt origin for all metal; some mills cannot certify.
DFARS 252.225-7001
Buy American and Balance of Payments Program
Sourcing
Domestic end product preference with exceptions for qualifying countries.
Country of origin of components and subassemblies.
DFARS 252.223-7008
Prohibition of Hexavalent Chromium
Environmental
Restricts hexavalent chromium in items delivered to DoD, with exceptions.
Plating and conversion coatings: use trivalent options.
DFARS 252.246-7007
Contractor Counterfeit Electronic Part Detection and Avoidance System
Quality
Requires a system to detect and avoid counterfeit electronic parts.
Authorized sources for electronics and traceability.
DFARS 252.246-7008
Sources of Electronic Parts
Sourcing
Requires electronic parts to come from original manufacturers, authorized dealers, or specified trusted suppliers.
Distributor choice and certification paperwork.
DFARS 252.211-7003
Item Unique Identification and Valuation
Quality
Requires unique item identifier marking on specified items.
Marking equipment, data matrix verification and registry steps.
FAR 52.246-2
Inspection of Supplies, Fixed-Price
Quality
Sets inspection system requirements and government inspection rights for fixed-price supplies.
Inspection records retention and access for customer or government reps.
FAR 52.246-11
Higher-Level Contract Quality Requirement
Quality
Specifies a higher-level quality standard such as AS9100 or ISO 9001 for the contract.
Whether your certification covers the required standard.
FAR 52.245-1
Government Property
Contract
Covers management and responsibility for government-furnished property.
Tooling or material supplied by the government; record keeping.
FAR 52.249-2
Termination for Convenience of the Government (Fixed-Price)
Contract
Allows the government to terminate and compensates for work performed and reasonable costs.
Risk on long-lead material and tooling purchases.
FAR 52.249-8
Default (Fixed-Price Supply and Service)
Contract
Allows termination for failure to perform or deliver on time.
Schedule realism and recourse for late supplier items.
FAR 52.247-34
F.O.B. Destination
Contract
Seller bears delivery cost and risk to the destination point.
Freight and insurance in the price.
FAR 52.222-50
Combating Trafficking in Persons
Labor
Prohibits trafficking-related activities and requires compliance plans in some cases.
Compliance plan requirement for larger overseas value.
FAR 52.219-8
Utilization of Small Business Concerns
Contract
Requires giving small businesses maximum practicable opportunity to participate.
Subcontracting plan expectations at larger tiers.
22 CFR Parts 120-130
International Traffic in Arms Regulations (ITAR)
Export
Controls defense articles and technical data on the US Munitions List.
Registration, US-person access, secure data handling.
15 CFR Parts 730-774
Export Administration Regulations (EAR)
Export
Controls dual-use and some military items via the Commerce Control List.
ECCN classification and license needs for foreign persons.
AS9100D
Quality Management Systems for Aviation, Space and Defense
Quality
ISO 9001 based standard with added aerospace requirements.
Customer-specified certification and flow-down of requirements.
AS9102
Aerospace First Article Inspection Requirement
Quality
Defines first article inspection process and reporting forms.
FAI hours, CMM time and balloon drawings in the price.
IATF 16949
Automotive Quality Management System Requirements
Quality
Automotive quality standard built on ISO 9001.
PPAP level, control plan and annual price-down expectations.
ISO 9001:2015
Quality Management Systems Requirements
Quality
General quality management system standard.
Certification status and supplier approval forms.
RoHS Directive 2011/65/EU
Restriction of Hazardous Substances
Environmental
Restricts certain hazardous substances in electrical and electronic equipment sold in the EU.
Material and plating declarations.
REACH (EC) No 1907/2006
Registration, Evaluation, Authorisation and Restriction of Chemicals
Environmental
EU chemical regulation including substances of very high concern disclosure.
SVHC declaration requests and supplier data.
NADCAP
National Aerospace and Defense Contractors Accreditation Program
Quality
Accreditation for special processes such as heat treat, NDT and chemical processing.
Approved special process sources only.

A general orientation list, not legal advice. Clause text and applicability change with revisions and solicitation type, so always read the actual clause version cited in your purchase order and confirm with your contracts counsel. Titles are paraphrased where long.

Scan PO terms for flow-downs automatically

Optional: ask how clause detection could run privately on your own purchase order documents.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the reference

Search by clause number, keyword or area. When a PO or RFQ lists flow-downs, look up each one, read the quoting column, and note any cost or risk items in your quote assumptions. Export the table to Excel to build a clause review matrix for your own quality system. The goal is not to replace a contracts review but to make sure the estimator knows when to escalate before pricing.

What typically drives cost

Specialty metals restrictions, first article requirements, special process source limits and cybersecurity obligations tend to have the largest quoting impact. Specialty metals may require melt-source certificates from specific mills. Cybersecurity clauses such as DFARS 252.204-7012 can require systems investment well beyond the part. Termination and default clauses affect how much material risk you can accept on long-lead orders.

  • Sourcing: specialty metals, country of origin, electronic parts.
  • Quality: higher-level quality, FAI, UID, counterfeit parts.
  • Compliance: ITAR or EAR handling and NIST SP 800-171.

How to read a flow-down

A flow-down is a clause from a prime contract that the prime requires its suppliers to follow. The same number can have different meaning depending on the version date and whether it is a commercial or government PO. Check the date after the clause number, and check whether the clause applies to you based on value thresholds, item type and data sensitivity. When unsure, ask the buyer to confirm applicability in writing.

Common mistakes

Quoting first and reading terms after award is the classic failure. Another is assuming that a commercial shop cannot be bound by defense clauses when the PO explicitly cites them. Finally, do not accept cybersecurity clauses without confirming where drawings and models are stored and whether your cloud tools qualify.

Frequently Asked Questions

What does flow-down mean in manufacturing?

A flow-down passes requirements from a prime contract or customer PO to its suppliers. If a purchase order lists clause numbers, you are expected to comply with them as stated, so they should be reviewed before accepting the order.

Is every clause in this list required for every defense part?

No. Applicability depends on the contract type, item, value and data involved. Use the list to know what a clause generally means, then check the actual clause text and applicability with your contracts team.

Does DFARS 252.204-7012 apply to small shops?

It applies when a subcontract involves covered defense information and the clause is flowed down, regardless of size. Shops handling controlled technical drawings should confirm obligations and assess their systems against NIST SP 800-171.

How current is this table?

It is a general orientation based on commonly cited clause titles. Regulations are revised, and cybersecurity and CMMC rules in particular have changed repeatedly, so verify against the current Federal Acquisition Regulation and DFARS text.

If you want incoming PO terms scanned for these clauses and flagged against your certifications, we can help build that review inside your own environment. The table works independently.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring