Discrete ManufacturingFree referencePDF, Excel, Word exportFoundry

Cast Iron and Steel Casting Grades: ASTM Reference Table

Buyers, foundry engineers and ERP item master owners keep asking the same question: what does Class 30 or 65-45-12 actually guarantee? This table lists the common ASTM casting grades with minimum tensile strength in ksi and MPa, so you can check a drawing callout or a purchase order line quickly.

Download:
StandardGrade / classMaterial familyMin tensile (ksi)Min tensile (MPa)Min yieldNote
ASTM A48
Class 20
Gray iron
20
138
Not specified
Separately cast test bar
ASTM A48
Class 25
Gray iron
25
172
Not specified
Common general purpose grade
ASTM A48
Class 30
Gray iron
30
207
Not specified
Common for housings and brake parts
ASTM A48
Class 35
Gray iron
35
241
Not specified
Higher strength, more alloying or inoculation
ASTM A48
Class 40
Gray iron
40
276
Not specified
Machine tool and engine castings
ASTM A48
Class 45
Gray iron
45
310
Not specified
High strength gray iron
ASTM A48
Class 50
Gray iron
50
345
Not specified
High strength gray iron
ASTM A48
Class 60
Gray iron
60
414
Not specified
Highest A48 class, section sensitive
ASTM A536
60-40-18
Ductile iron
60
414
40 ksi
Ferritic, 18 percent min elongation
ASTM A536
65-45-12
Ductile iron
65
448
45 ksi
Most common ductile iron grade
ASTM A536
80-55-06
Ductile iron
80
552
55 ksi
Ferritic-pearlitic
ASTM A536
100-70-03
Ductile iron
100
690
70 ksi
Pearlitic or heat treated
ASTM A536
120-90-02
Ductile iron
120
827
90 ksi
Quenched and tempered
ASTM A897/A897M
Grade 1 (850-550-10)
Austempered ductile iron
123
850
550 MPa
Metric grade designation
ASTM A897/A897M
Grade 2 (1050-700-7)
Austempered ductile iron
152
1050
700 MPa
Gears, crankshafts
ASTM A897/A897M
Grade 3 (1200-850-4)
Austempered ductile iron
174
1200
850 MPa
High wear applications
ASTM A27/A27M
60-30
Carbon steel casting
60
415
30 ksi
General application
ASTM A27/A27M
65-35
Carbon steel casting
65
450
35 ksi
General application
ASTM A27/A27M
70-36
Carbon steel casting
70
485
36 ksi
General application
ASTM A27/A27M
70-40
Carbon steel casting
70
485
40 ksi
General application
ASTM A216/A216M
WCA
Carbon steel, pressure
60
415
30 ksi
Valves and fittings, high temperature service
ASTM A216/A216M
WCB
Carbon steel, pressure
70
485
36 ksi
Most common valve body grade
ASTM A216/A216M
WCC
Carbon steel, pressure
70
485
40 ksi
Valves and fittings
ASTM A351/A351M
CF8
Austenitic stainless casting
70
485
30 ksi
Cast equivalent of 304
ASTM A351/A351M
CF8M
Austenitic stainless casting
70
485
30 ksi
Cast equivalent of 316
ASTM A148/A148M
80-50
High strength steel casting
80
550
50 ksi
Structural applications
ASTM A148/A148M
90-60
High strength steel casting
90
620
60 ksi
Structural applications

Values are the minimum tensile and yield figures commonly quoted from each specification. Always confirm against the current edition of the standard and your purchase order, since test bar type, section size and supplementary requirements change what is actually certified.

Material grade cleanup for your item master

Optional: send us an export of your casting item descriptions and we will return a mapping of free text to controlled grade strings.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the table

Type a grade, a standard number or a material family into the search box to filter the rows. Each row gives the specification, grade name, minimum tensile strength in both unit systems, minimum yield where the standard defines one, and a short note on typical use. Use the Excel export to paste the grades into an item master, a supplier quality agreement or a material approval list. Gray iron grades under A48 are classified by tensile strength alone, so yield is shown as not specified.

  • Search by standard to see every grade in one specification
  • Sort mentally by tensile column to compare strength steps
  • Export to Excel for approved material lists
  • Check the note column for typical applications

Reading grade names

Ductile iron grades under A536 use three numbers: minimum tensile in ksi, minimum yield in ksi, then minimum elongation in percent. So 65-45-12 means 65 ksi tensile, 45 ksi yield and 12 percent elongation. Gray iron A48 uses a class number that equals the minimum tensile strength in ksi. Austempered ductile iron under A897M uses metric values in MPa, for example 850-550-10. Pressure steel castings under A216 use letter grades such as WCB instead, and the strength is found in the specification tables.

  • A48 Class 30 equals 30 ksi minimum tensile
  • A536 65-45-12 equals tensile, yield, elongation
  • A897M grades are in MPa, not ksi
  • A216 WCB is the common valve body grade

Common mistakes

The biggest mistake is treating a minimum value from a separately cast test bar as the strength of every location in a real casting. Section thickness, cooling rate and feeding all change local properties, especially in gray iron. The second mistake is mixing metric and imperial designations on one purchase order, for example calling out a ductile grade by ksi while the supplier certifies in MPa. Third, buyers sometimes assume an equivalent grade from another standard such as EN or ISO is interchangeable. Confirm equivalence with the foundry and the design engineer.

  • Do not assume bar strength equals casting strength
  • State the standard edition on the PO
  • Do not treat cross-standard grades as equal without review

Using grades in an ERP

Most ERPs store the casting material as a free text attribute or a classification code on the item. Pick one convention, for example the standard plus grade as in ASTM A536 65-45-12, and enforce it so that supplier certificates, receiving inspection plans and cost roll-ups all point to the same string. In SAP this fits a class and characteristic, in Infor SyteLine a user defined field or item attribute, and in Epicor a part attribute or UD field.

Frequently Asked Questions

What does ASTM A48 Class 30 mean?

It is a gray iron class with a minimum tensile strength of 30 ksi, about 207 MPa, measured on a separately cast test bar. The class number is the minimum tensile strength in ksi. Hardness and the strength in the actual casting vary with section size.

What do the three numbers in 65-45-12 mean?

For ductile iron under ASTM A536 they are minimum tensile strength in ksi, minimum yield strength in ksi and minimum elongation in percent. So 65-45-12 is 65 ksi tensile, 45 ksi yield and 12 percent elongation.

Is WCB the same as A216 Grade WCB cast steel?

Yes. WCB is a grade name within ASTM A216 for carbon steel castings used in pressure containing parts such as valve bodies. It requires 70 ksi minimum tensile and 36 ksi minimum yield, with chemistry and heat treatment set by the standard.

Are these values guaranteed for every part?

No. They are minimums from the specification, normally verified on test coupons from the same heat. Local properties in a real casting depend on section thickness, solidification and heat treatment, so critical parts need agreed sampling or cast-on test coupons.

If your item master has inconsistent casting material descriptions, we can help build a cleanup that maps free text to a controlled grade list and checks it against supplier certificates. This tool works fully without contacting us.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring