Forge engineers and planners often need a quick sanity check on how hot to take a billet and how cool it can get before the last blow. This reference lists typical hot forging start and finish temperatures for common steels, aluminum, titanium and copper alloys in both Celsius and Fahrenheit.

Download:
MaterialFamilyTypical start (deg C)Min finish (deg C)Typical start (deg F)Min finish (deg F)Note
Low carbon steel (1018)
Carbon steel
1150-1260
870
2100-2300
1600
Wide forging window
Medium carbon steel (1045)
Carbon steel
1150-1230
850
2100-2250
1560
Common for shafts and flanges
High carbon steel (1095)
Carbon steel
1050-1150
800
1920-2100
1470
Lower start to avoid burning and decarburization
Alloy steel (4140)
Alloy steel
1150-1230
870
2100-2250
1600
Slow cool or anneal after forging
Alloy steel (4340)
Alloy steel
1150-1230
850
2100-2250
1560
Air hardening tendency, control cooling
Stainless 304
Austenitic stainless
1150-1260
925
2100-2300
1700
Stiffer than carbon steel, needs more force
Stainless 316
Austenitic stainless
1120-1230
925
2050-2250
1700
Solution anneal after forging
Aluminum 6061
Aluminum
430-480
340
810-900
650
Narrow window, preheat dies
Aluminum 2014
Aluminum
420-460
340
790-860
650
Aerospace structural forgings
Aluminum 7075
Aluminum
370-440
320
700-820
610
Very narrow window, hot short risk
Titanium Ti-6Al-4V
Titanium
900-980
800
1650-1800
1470
Beta transus near 995 deg C, alpha-beta forging stays below it
Copper (C11000)
Copper alloy
750-900
600
1380-1650
1110
Fast cooling in dies
Brass forging alloy (C37700)
Copper alloy
650-760
480
1200-1400
900
Common for fittings and valve parts
Nickel superalloy (Inconel 718)
Nickel alloy
980-1120
900
1800-2050
1650
Very narrow window, often isothermal or hot die

These are typical handbook-style guide ranges, not process specifications. Actual start and finish temperatures depend on alloy chemistry, section size, reduction ratio, die temperature and the customer specification. Confirm against your qualified forging procedure.

Structured routing data for forge heating practice

Optional: we can review how heating setpoints and soak limits are stored in your routings and suggest a structure.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the chart

Search for the alloy or family and read the typical start range and the minimum finish temperature. The start range is the heating target for the furnace or induction heater. The finish temperature is the lowest metal temperature at which the last significant deformation should still happen. Below it, the material work hardens, cracks or forges with excessive force. Use the table to compare a work instruction against a typical guide, and export to Excel to build a furnace setpoint list per part family.

  • Start range is the heating target before the first blow
  • Finish is the lowest temperature for final deformation
  • Use both units to match shop floor pyrometers

Why the windows differ so much

Steels forge across a wide window because they stay plastic from around 1250 deg C down to about 850 deg C. Aluminum alloys such as 7075 have a window of perhaps 100 deg C, so billet heating, die temperature and press speed must be tightly controlled. Titanium and nickel alloys are also narrow, and heat loss to cold dies is fast. That is why aerospace forgings often use preheated dies or isothermal tooling. A wide window means forgiving schedules, a narrow one means more reheats and tighter scheduling.

  • Steel: wide window, mostly limited by scale and grain growth
  • Aluminum: narrow, hot short risk at the top end
  • Titanium and nickel: narrow, die chill is critical

Common mistakes

Overheating is the most expensive error. Carbon steel held near its upper limit grows coarse grain, and close to the solidus it can burn, which is irreversible scrap. Another frequent error is measuring surface temperature with an uncalibrated pyrometer on scaled steel, which reads low and invites overheating. Finally, forging below the finish temperature to save a reheat leads to laps and cracks that only show up at final inspection. Tie your furnace setpoint and a maximum soak time to the part routing so every lot follows the same heating practice.

  • Do not exceed the maximum soak time at temperature
  • Check pyrometer emissivity settings on scaled billets
  • Reheat rather than forge below the finish temperature

Frequently Asked Questions

What is the typical forging temperature of 4140 steel?

Typical hot forging starts around 1150 to 1230 deg C and should finish above roughly 870 deg C. After forging, 4140 is normally cooled in a controlled way or annealed or normalized, depending on the next machining and heat treatment step.

Why is aluminum forging temperature so tight?

Aluminum alloys have a narrow plastic window between insufficient ductility at low temperature and hot shortness or incipient melting at high temperature. Alloys like 7075 may only allow about 70 to 100 deg C of working range, so dies are preheated and billets are held tightly.

Do these numbers replace a forging specification?

No. They are guide values. Customer specifications, aerospace material specs and your qualified forging procedure set the real limits for heating temperature, soak time, reduction ratio and cooling. Use the table as a first check only.

What happens if I forge below the finish temperature?

The metal loses ductility, flow stress rises and surface or internal cracking, laps and cold shuts become likely. In steel it may also leave residual stress and unwanted grain structure. The usual fix is to reheat the part before further deformation.

If your forging routings keep heating temperatures in free text notes, we can help pull setpoints and soak times into structured routing data in your ERP. The chart above is free to use without any contact.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring