Engineering & PLMFree referencePDF, Excel, Word exportFoundry

Casting Alloy Density and Pour Temperature Reference

Estimators and foundry engineers constantly need the density of an alloy to turn a model volume into a weight, and a pour temperature range to sanity check a furnace plan. This table puts both in one searchable place, with weight per cubic inch calculated for you.

Download:
AlloyFamilyTypical specificationDensity (g/cc)Weight per cubic inch (lb/in3)Approx. liquidusTypical pour temperature
Gray iron Class 30
Cast iron
ASTM A48
7.15
0.2583
about 2150 to 2200 F
2500 to 2700 F
Gray iron Class 40
Cast iron
ASTM A48
7.2
0.2601
about 2100 to 2150 F
2500 to 2700 F
Ductile iron 65-45-12
Cast iron
ASTM A536
7.1
0.2565
about 2100 to 2150 F
2450 to 2650 F
Ductile iron 80-55-06
Cast iron
ASTM A536
7.1
0.2565
about 2100 to 2150 F
2450 to 2650 F
Carbon steel WCB
Cast steel
ASTM A216
7.85
0.2836
about 2750 F
2850 to 2950 F
Low alloy steel 80-50
Cast steel
ASTM A148
7.85
0.2836
about 2740 F
2850 to 2950 F
Stainless CF8 (cast 304)
Cast steel
ASTM A351
7.8
0.2818
about 2640 F
2800 to 2950 F
Stainless CF8M (cast 316)
Cast steel
ASTM A351
8
0.289
about 2600 to 2650 F
2800 to 2950 F
Inconel 718 (cast)
Nickel alloy
AMS 5383
8.2
0.2962
about 2430 F
vacuum investment, 2650 to 2850 F
Aluminum A356
Aluminum
ASTM B108, AMS 4218
2.68
0.0968
about 1135 F
1290 to 1360 F
Aluminum 319
Aluminum
ASTM B108
2.79
0.1008
about 1120 F
1290 to 1380 F
Aluminum 380 (die cast)
Aluminum
ASTM B85
2.71
0.0979
about 1100 F
1200 to 1300 F
Magnesium AZ91D
Magnesium
ASTM B94
1.81
0.0654
about 1100 F
1290 to 1400 F
Zinc Zamak 3
Zinc
ASTM B86
6.6
0.2384
about 725 F
780 to 840 F
Zinc Zamak 5
Zinc
ASTM B86
6.6
0.2384
about 727 F
780 to 840 F
Zinc ZA-8
Zinc
ASTM B791
6.3
0.2276
about 759 F
790 to 850 F
Leaded red brass C83600
Copper alloy
ASTM B584
8.8
0.3179
about 1830 F
2050 to 2250 F
Tin bronze C93200
Copper alloy
ASTM B584
8.8
0.3179
about 1830 F
2050 to 2200 F
Aluminum bronze C95400
Copper alloy
ASTM B148
7.45
0.2691
about 1900 F
2100 to 2250 F
Yellow brass C85400
Copper alloy
ASTM B584
8.4
0.3035
about 1650 F
1950 to 2100 F

Values are typical and rounded for estimating and planning. Density varies with composition and porosity, and liquidus shifts with chemistry and carbon equivalent. Always follow your foundry procedure and the governing specification for pour temperature. Multiply lb per cubic inch by part volume in cubic inches to estimate casting weight.

Tie alloy data to ERP lot records

Optional review of how alloy properties and heat chemistry could be linked to items and lots on your own servers.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the table

Search by alloy, family or specification. Read density in grams per cubic centimeter and the calculated pounds per cubic inch. Multiply the pounds per cubic inch by the casting volume in cubic inches from your CAD model to get weight. For metric parts, multiply density in grams per cubic centimeter by volume in cubic centimeters to get grams. Use the liquidus and pour columns as a quick check against furnace and ladle practice. Export the table to Excel to drop into a quoting sheet.

How the numbers behave

Pour temperature is always above the liquidus, because metal cools in the ladle and must still fill thin sections. The superheat is typically a few hundred degrees for iron and steel, and smaller for aluminum and zinc. Thin sections, investment molds and large castings each push the target in different directions. Density in castings also varies a little with microporosity, so for tight weight limits a measured sample weight is better than a table value. Alloys within the same family often have almost identical density.

Common mistakes

The most common error is using wrought density for a casting alloy, or using steel density for stainless grades with a heavier chemistry. Another is quoting pour temperature as a single number when it depends on section thickness and mold. Do not use liquidus as the furnace set point. If your alloy is not listed, use your supplier data sheet or the governing specification, not an approximate guess, especially for certified work where chemistry controls everything.

Frequently Asked Questions

How do I estimate casting weight from a CAD model?

Take the solid volume from the CAD model and multiply by the alloy density. Use pounds per cubic inch with volume in cubic inches, or grams per cubic centimeter with volume in cubic centimeters. Add machining stock if the model is the finished part.

Is liquidus the same as pour temperature?

No. Liquidus is the temperature above which the alloy is fully liquid. Pour temperature is higher so that the metal stays fluid while it fills the mold. Both depend on chemistry and section size.

Why do ductile and gray iron have similar density?

Both are iron with carbon and silicon, and graphite occupies space in both. The shape of graphite differs, flakes versus nodules, which changes strength and ductility far more than it changes density.

Are these values good enough for certified work?

They are fine for estimating and planning. For certified or safety critical work, rely on the governing specification and your foundry procedure, and verify weight and chemistry with measured data.

If you want alloy properties and heat chemistry tied to your ERP item and lot records, we can build that on your own servers.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

Guides

Manufacturing hubs