Supply Chain & InventoryFree templatePDF, Excel, Word exportFoundry

Casting RFQ Package Template

A vague casting RFQ gets vague quotes. This template collects the part definition, alloy, process, tolerances, quantities, inspection requirements and tooling terms in one place so that foundries can price the same thing and you can compare answers.

Fill in

Live preview
Free, optional. Reopen it on any device.
Download:

Casting RFQ Package Template

Request for Quotation: Castings

From: Acme Fluid Systems Inc. Contact: Jordan Lee, Senior Buyer RFQ date: 2026-10-20 Quote due: 2026-11-10

We invite your quotation for the casting described below. Please state any exceptions, alternate process suggestions and cost reduction ideas in your response.

Part Definition

ItemDetail
Part number and revisionCV-4410 Rev C
DescriptionPump housing, two-piece design, internal cored passages
Alloy and specificationDuctile iron 65-45-12, ASTM A536
Approximate as-cast weight22 lb
Preferred processNo-bake sand
Casting tolerance standardISO 8062 CT9

Quantities and Release

ItemQuantity
Prototype or first article10 pieces
Estimated annual usage2,400 pieces
Release methodBlanket PO with scheduled releases

Quality Requirements

Visual per MSS SP-55, dimensional layout of first articles, pressure test of each casting at 150 psi, chemistry and mechanical test bar per heat.

Supplier must provide material certification, heat lot traceability and first article inspection results before production release. Notify the buyer before any change of process, pattern, location or sub-tier source.

Tooling Terms

Tooling ownership: To be quoted both ways

Please itemize pattern, core box and gauge cost separately, state expected tooling life in pieces, and describe maintenance responsibility and storage.

Delivery and Packaging

FOB supplier. Dunnage packed in returnable containers. Required first shipment 14 weeks after PO.

Price Response

Quantity breakPiece priceTooling chargeLead time
Prototype
Up to 500
501 to 2,500
Over 2,500

Acknowledgment

Buyer / Date
Supplier quoting representative / Date

Starting point for a casting RFQ, not legal advice. Add your standard terms and conditions, and attach the drawing, 3D model, specification and quality clauses as separate files. Tolerance grade names refer to ISO 8062 casting tolerance classes; confirm what your drawing actually requires.

Manage RFQs and supplier quotes in your ERP

Optional review of how RFQs, quotes and tooling records could be tracked together on your own servers.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the template

Fill in the fields, then export a PDF or Word file and attach the drawing and 3D model. Name the specification for the alloy, not just a family, and give a weight so the foundry can check yield. State the casting tolerance standard you intend, such as an ISO 8062 grade, so that dimensions are priced consistently. Give both prototype and annual volumes, because pattern investment and process choice depend on them. Ask for tooling to be quoted both ways when you are open to supplier owned tooling.

What makes a casting RFQ comparable

Foundries quote differently on process, yield, tooling life and finishing. A fair comparison needs the same alloy, tolerance, machining stock, inspection scope, and delivery basis in every request. The price response table forces quantity breaks and a separate tooling charge, which prevents hidden tooling in the piece price. Ask for lead time on tooling and on production, and for the foundry's own cost reduction suggestions, such as changes to wall thickness or parting line that raise yield.

  • Alloy specification, not just family
  • Tolerance standard and machining stock stated
  • Quantity breaks with separate tooling charge
  • Inspection, certification and traceability scope

Common mistakes

Leaving out the revision level leads to quotes on old drawings. Not stating who owns the tooling creates disputes later. Omitting inspection requirements such as pressure testing or radiography gets you a price that excludes them. Sending the RFQ to many foundries without checking process fit wastes everyone's time; match investment, sand and die casting suppliers to the part. Finally, include the expected first shipment date, because pattern lead time is often the true constraint.

Frequently Asked Questions

What drawings should accompany a casting RFQ?

Send the part drawing with revision, a 3D model if available, the material specification, any inspection or test requirements and applicable quality clauses. Mark machined surfaces and datums, because they affect gating, machining stock and tolerance planning.

Should I specify the casting process?

State a preference if function, volume or tolerance requires it, but also ask the foundry to recommend an alternative. A different process, such as shell mold instead of green sand, sometimes improves quality or cost for the same part.

Who should own the tooling?

It depends on volume, your control needs and the foundry's policy. Buyer owned tooling gives you portability, while supplier owned tooling can reduce upfront spend. Ask for both quotes and compare total cost over the expected volume.

What quantity breaks should I ask for?

Ask for prototype, low production and full annual volume breaks, plus a price for the tooling. Foundries often change process and yield with volume, so a single price at one quantity hides the real cost curve.

If you want RFQs, supplier quotes and tooling records kept together and compared inside your ERP, we can build that on your own servers.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

Guides

Manufacturing hubs