Casting Nonconformance and Disposition Template
Castings fail in ways that other parts do not: hidden porosity, shrinkage found only after the first cut, inclusions that show at pressure test. This nonconformance template captures the casting specific facts so the supplier can act on it.
Fill in
Casting Nonconformance and Disposition Template
Casting Nonconformance Report
Company: Harbor Machining Co NCR number: NCR-2610-044 Date found: 2026-10-20 Part: PH-210 pump housing Heat or lot: H-26-10418
Quantity
Received: 120 Nonconforming: 9 Found at: First operation machining
Defect
Type: Shrinkage Location: Boss at flange, exposed after 3 mm cut
Subsurface shrinkage cavities exposed on the flange boss at first machining. Cavity size up to 3 mm. Drawing allows no cavities in the sealing face.
Containment
| Action | Owner | Due | Done |
|---|---|---|---|
| Quarantine suspect stock | |||
| Check other lots with same heat | |||
| Notify supplier |
Root Cause and Corrective Action
Root cause: ____________________ Corrective action: ____________________ Verification of effectiveness: ____________________
Disposition
Decision: Return to supplier
Approvals
Use as a starting point. Repair of castings, such as welding, normally needs written customer or specification approval before it is used as a disposition.
Trend casting defects by supplier
Optional: a short review of how NCR data could be summarized from your ERP.
Optional. The tool and every export work without this. No spam.
How to use this template
Enter the identifying fields, choose the defect type and where it was found, then describe the defect with size and location. Print or export, add photos and sketches, and route for approval. Always record the heat or lot number, because a casting problem usually follows the melt or the mold batch, not the single piece.
Choosing the defect type
Gas porosity shows as rounded holes, often near the surface. Shrinkage is irregular and rough, usually at thick sections or hot spots. Sand inclusions are loose grains or slag pockets. Cold shuts and misruns are fill problems from low pour temperature or poor gating. Name the defect precisely, since the corrective action differs: gating and risering for shrinkage, venting and moisture control for gas.
Disposition decisions
Scrap and return to supplier are straightforward. Use as is needs engineering, and sometimes the customer, to accept the deviation. Repair of a casting, for example by welding or impregnation, is only acceptable where the specification and customer permit it, and it must be recorded. Sort 100 percent is containment, not a corrective action.
Common mistakes
Teams often write only 'porosity' with no size, location or drawing requirement, so the supplier cannot reproduce or judge it. Also avoid closing the NCR on a disposition alone. Record the cause and verify that the next lot is clean, and update the supplier scorecard.
Frequently Asked Questions
Can I use this for supplier corrective action?
Yes. Send the exported PDF with photos to the supplier and ask for a root cause and corrective action reply. If a formal SCAR or 8D format is required, copy the content into it.
What if the defect is only found after machining?
Select the machining operation in the found at field and record the cut depth. Defects exposed late are costly because value has been added, so note the cost in your own tracking.
Do I need the heat number on every NCR?
It is strongly recommended. It lets the supplier trace the melt and mold batch and lets you quarantine other pieces from the same lot.
Is this a legal document?
It is a quality record, not legal advice. Contractual remedies depend on your purchase agreement and applicable specifications.
If you track nonconformances and supplier performance in an ERP, Netray can help summarize defect trends by supplier and heat on your own systems.
Related Tools
Casting Scrap by Defect Pareto Worksheet
Record scrap by defect type with quantity and unit cost, and see the cost and average value per scrapped casting.
Industry TemplatesFoundry Heat and Melt Record Template
A fill-in melt record that ties one heat number to its charge, spectrometer results, tap and pour data and the castings poured from it.
Industry TemplatesHeat Treat Furnace Batch Log Worksheet
An editable batch log for furnace loads: part, process, load weight, setpoint, soak time, quench medium, hardness and pass or hold status.
Industry TemplatesForging Process Sheet Template
A fill-in process sheet that lists billet, heating, forging, trim, heat treat and inspection operations in order for one forged part.
More Quality & Inspection tools
See all- Casting Defect Troubleshooting Checklist
- SAP QM Process Capability Cp Cpk Calculator
- SAP QM Lot Rejection Rate, PPM and Sigma Level Calculator
- SAP QM Gauge R&R Study Calculator
- SAP QM Cp and Cpk Capability Calculator
- Job Shop Material Certification Log Worksheet
- Job Shop First Piece Inspection Sign-Off Template
- Job Shop Scrap and Rework Cost Calculator
- Master Data Audit Sample Size Calculator
Keep exploring
Free tools
- NCR Nonconformance Report TemplateFill-in nonconformance report with containment, disposition and approval lines that exports to PDF, Word or Excel.
- Casting Scrap by Defect Pareto WorksheetRecord scrap by defect type with quantity and unit cost, and see the cost and average value per scrapped casting.
- Aerospace MRB Nonconformance Disposition Record TemplateA fill-in record for the material review board: nonconformance details, disposition, customer approval status and sign-offs.
Guides
- Foundry Heat and Lot Traceability for CastingsHow foundries trace castings back to heat, charge, pattern and process records, what customers and auditors ask for, and how to retrieve it in minutes.
- AI for Casting RFQ and Drawing ReviewHow a private AI reads casting RFQ packages, prints and specs, flags alloy, NDT and tolerance risks, and drafts questions for the customer before you quote.
- ERP for Foundries: Requirements That Actually MatterWhat a foundry ERP needs: heat and lot traceability, alloy and melt costing, pattern tracking, cleaning room routing, scrap by defect, and honest fit questions.
AI on your ERP
- AI for SyteLine Quality: Nonconformance Reports and Inspection DataAI for Infor SyteLine quality: analyse NCR trends, inspection results and supplier defects, draft dispositions for review, and keep quality data private on-prem.
- AI for Plex Production and Quality: Scrap, Downtime and NonconformanceAI for Plex production and quality: scrap and nonconformance patterns, control plan analysis, downtime causes and shop floor Q&A through Plex APIs.
Manufacturing hubs
- American Foundry Society (AFS) and the metalcasting ecosystem: standards, ERP and data realitiesAmerican Foundry Society (AFS) and the metalcasting world: foundry processes, standards, and the ERP, costing, quality and private AI issues foundries face.
- Portland and Hillsboro, Oregon manufacturing: semiconductors and metalsGuide to Portland and Hillsboro manufacturing: semiconductor R&D and fabs, metals and castings, key programs, compliance, and ERP and quoting issues.