China CCC Certification Readiness Assessment
China Compulsory Certification, the CCC mark, is required for listed product categories sold, imported or used in China. This ten-question readiness check helps product and compliance teams see what is missing before they approach a certification body.
1. Have you confirmed whether your product falls under the current CCC product catalogue?
The catalogue is set by the Chinese market regulator. Products are matched by category and sometimes by HS code and technical features.
2. Do you know which Chinese national standards (GB) apply to your product?
3. Does the product design already meet the GB requirements, including any China-specific differences from IEC or EN standards?
4. Do you have an appointed certification body and an agreed application plan?
5. Are samples and key components prepared for type testing at a designated laboratory?
6. Do critical components that need their own CCC certificate have valid certificates?
Some products require safety-critical parts, such as power supplies or cables, to carry their own approvals.
7. Is the manufacturing site ready for an initial factory inspection?
Inspection covers quality assurance capability, product consistency and production control.
8. Do you have a plan for production conformity and routine tests once certified?
9. Are the CCC mark, model naming and labelling plan ready for production?
10. Is there a change control process to notify the certification body of design, component or site changes?
How to use the assessment
Answer each question for one product family at one manufacturing site. The score shows how prepared you are across scope, standards, testing, component certificates, factory inspection, labelling and change control. Use the recommendations as an action list and re-run it after each milestone. Export the result to share with engineering, quality and your certification body.
How CCC works in outline
The process generally involves application to a designated certification body, type testing at a designated laboratory, an initial factory inspection, evaluation and certificate issue, and then follow-up surveillance. Products must carry the CCC mark and the certificate must be kept valid. Rules, catalogues and some exemptions have been updated over time, including changes to the product list, so confirm current requirements with a certification body or the official regulator before committing to a plan.
Typical pitfalls
Delays usually come from the same causes. They are cheap to avoid when they are known up front.
- Assuming a CE, UL or IEC report replaces GB testing
- Changing a critical component after type testing without notifying the certification body
- Treating the factory inspection as a paperwork task instead of a process audit
- Printing labels before the certificate scope and model names are final
- Selling to China via a distributor without clarifying who holds the certificate
Recording CCC data in the ERP
Hold certificate number, product scope, factory, expiry and surveillance dates as attributes on the item or product family. In SAP this can be a classification or certificate management object, in Infor SyteLine or Epicor a user-defined field on the item. Add a check at shipment or customs documentation so a product with an expired or missing certificate is flagged before it leaves.
Frequently Asked Questions
Which products need a CCC mark?
Products in the regulator's CCC catalogue, which has covered categories such as many electrical appliances, wires and cables, certain auto parts and some toys. The list changes, so check the current catalogue or ask a certification body about your exact product.
Can I use my CE or UL test report?
Generally no. CCC requires testing to Chinese national standards at a designated laboratory. Existing reports can help your design preparation or may be considered in limited cases, but plan on dedicated GB testing unless the certification body says otherwise in writing.
How long does CCC certification take?
It depends on product category, test queue and factory readiness. Plan for several months from application to certificate and avoid committing launch dates before the certification body gives you a timeline. Delays in samples or factory inspection are the most common cause.
Does CCC apply to parts I export to a Chinese manufacturer?
Not usually for components used inside a finished product, but the finished product may need CCC and the Chinese assembler may require components to have particular approvals. Ask your customer who holds responsibility and which component certificates they expect.
If certificate numbers and expiries live outside your ERP, Netray can help you add a validation step at item release and shipment so uncertified products are not sent to China.
Related Tools
China Customs HS Code Classification Worksheet
Record the HS code, description and declared value of each imported part and estimate duty and import VAT per line.
Quality & InspectionChina Golden Sample Approval Form Template
A form to approve a pre-production or golden sample, record the acceptance criteria and keep matched samples with both parties.
Quality & InspectionChina Supplier Audit Checklist
A six-part on-site audit checklist for Chinese suppliers: legal status, quality, production, labor and EHS, IP protection and subcontracting.
Country & TaxChina ERP Localization Requirements Checklist
A checklist of what an ERP needs to run legally and practically in China: tax invoicing, accounting, banking, language, data rules and reporting.
More Compliance & Contracts tools
See all- SAP SoD Residual Risk Score Calculator
- SAP Firefighter ID Usage Review Log
- IBM i (AS/400) User Profile Access Review Worksheet
- SyteLine Security and User Access Audit Checklist
- Infor XA (MAPICS) User Access Review Worksheet
- China ERP Data Security and Compliance Assessment
- ERP Vendor Data Processing Agreement Outline
- GDPR ERP Data Migration Checklist
- EU Machinery Regulation 2023/1230 Readiness Checklist
Keep exploring
Free tools
- China ERP Data Security and Compliance AssessmentTen questions covering data location, cross-border transfer, personal information, classified protection and access control for an ERP running in China.
- SAP Integration Readiness AssessmentAnswer ten questions about interfaces, monitoring, API use, security and ownership to see how ready your SAP integration landscape is for change.
- ERP Agent API Integration Readiness AssessmentAnswer ten questions about APIs, roles, limits and logging to see whether your ERP is ready for an AI agent or MCP integration.
Guides
- ERP Go-Live Readiness Assessment ChecklistValidate ERP go-live readiness with a 100-point checklist covering data, integrations, training, cutover, and support. Prevent post-go-live emergencies.
- Is Your Manufacturing Operation AI-Ready?Assess your manufacturing organization's readiness for AI. Data quality, process maturity, infrastructure, and cultural readiness evaluation framework.
- Infor LN Cloud Migration: Strategy, Assessment, and Execution GuidePlan your Infor LN cloud migration with assessment frameworks, architecture decisions, and phased migration strategies for moving LN to Infor Cloud or hybrid hosting.
Manufacturing hubs
- Chengdu and Chongqing: Automotive, Electronics and Aerospace ManufacturingGuide to Chengdu and Chongqing manufacturing: automotive, electronics and aerospace clusters, institutions, standards, and ERP and private AI practicalities.
- Ningbo and Yuyao, Zhejiang: Molds, Plastics and Hardware ManufacturingGuide to Ningbo and Yuyao manufacturing: mold making, injection molding and hardware, the port, typical ERP and quoting problems, and where private AI helps.