Quality & InspectionFree checklistPDF, Excel, Word exportManufacturingChina

China Supplier Audit Checklist for Factory Visits

A supplier audit in China works best when it is evidence-based and consistent between visits and auditors. This checklist covers the six areas buyers and supplier quality engineers most often get wrong, from trading companies posing as factories to unrecorded subcontracting.

0%

0 of 36 items complete

16 critical items still open - these are the highest-risk gaps.

Free, optional. Reopen it on any device.
Download checklist:

Legal status and capacity

Quality management system

Production and equipment

Labor, safety and environment

IP, data and subcontracting

Count ticked items per group and overall. Any untick on a critical item is a finding to record, even when the overall percentage looks acceptable. Record evidence (photo, document number, sample) next to each finding.

Supplier approval workflow in your ERP

Optional: a walk-through of how to hold audit status and expiry dates on the supplier record and block expired suppliers.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to run the audit

Send the checklist and document request list a week before the visit so the supplier can prepare records. On the day, walk the process in order: receiving, warehouse, production, inspection, packing. Ask to see live records, not only prepared files, and take a sample of lot numbers to trace backward. Tick items you verify, note evidence and mark critical items you could not verify as findings. Export the result to PDF or Excel and send findings to the supplier with a due date for corrective action.

What is behind the sections

The structure follows a typical second-party audit: legal identity, quality system (ISO 9001 clause themes such as control of nonconforming output and monitoring resources), process control, social and safety compliance, and supply chain risk. It does not replace a formal certification audit and it does not quote standard text. For regulated industries add the customer-specific requirements, such as IATF 16949 customer-specific rules or AS9100 flow-down clauses.

Reading the result

Do not average everything into one number. A supplier at 85% overall with an open fire-exit or child labour finding is not acceptable. Use the critical items as a gate, then use the percentage by group to decide the type of follow up. Low quality-system scores point to a development plan, low IP scores point to contract and access controls, and low legal scores point to a different supplier altogether.

  • All critical items ticked: eligible for approval, subject to any non-critical actions
  • One to three critical misses: conditional approval with a dated corrective plan
  • More than three critical misses: do not approve until re-audited

Common audit mistakes

Frequent errors are auditing the showroom instead of the production floor, announcing the date so far in advance that the factory is staged, relying on a translator provided by the supplier, and failing to follow up. Also confirm who owns the audit record in your ERP. Store audit status, date and next due date on the supplier master so purchasing is blocked or warned when approval lapses.

Frequently Asked Questions

How often should I audit a China supplier?

Frequency should follow risk. New suppliers are audited before approval. Critical or high-spend suppliers are commonly re-audited yearly, lower-risk suppliers every two or three years, and any supplier with repeated quality escapes sooner. Document the interval in your supplier management procedure.

How do I tell if the supplier is a trading company?

Check that the business license scope includes manufacturing, the visited site has production equipment, raw material storage and routing records, and the factory name matches the license and fapiao issuer. Trading companies often cannot show process records or tooling.

Should the audit be announced or unannounced?

Initial qualification audits are normally announced so the right people and records are available. For ongoing monitoring, consider short-notice or unannounced follow up visits for high-risk suppliers, particularly for labor and subcontracting topics, subject to contract terms.

Can I use this for a third-party audit company?

Yes, you can give it to a third-party inspection firm as the scope of work and request a completed copy with photos. Make sure the auditor is qualified for your industry and that you still review the critical findings yourself.

If audit status and expiry dates are tracked in spreadsheets, Netray can help link supplier approval status to purchasing in your ERP so expired suppliers are flagged automatically.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring