Material Certification Log Worksheet
When a customer asks which heat lot went into a shipped part, the answer should take a minute, not an afternoon in a binder. This log ties each heat or lot number to a PO, a job and a cert status.
| Received | PO number | Supplier | Material | Heat or lot number | Job number | Qty received (pcs or ft) | Cert on file | Spec verified | |
|---|---|---|---|---|---|---|---|---|---|
Rows with Pending or Rejected cert status should not be released to the floor until resolved. Export to Excel to send a traceability extract to a customer.
Automate lot traceability reports
Optional: discuss pulling heat lot to job to shipment trails from your ERP.
Optional. The tool and every export work without this. No spam.
How to use the log
Add a row at receiving for every material lot. Record the PO, supplier, material description, the heat or lot number printed on the cert and tag, and the job it is allocated to. Set cert status to Pending until you have the paper in hand and compared it to the ordered specification. Edit or delete rows freely, then export to Excel, PDF or CSV. The totals at the bottom give a quick count of lots and quantity.
What you are verifying
Receiving inspection of a cert is a comparison, not a rubber stamp. Check that the heat number on the cert matches the tag, that the material grade matches the PO, and that the chemistry and mechanical values meet the specification the customer called out. Aerospace and defense customers may require certs from approved sources or domestic melt, so read the order for flow-downs.
- Heat number on cert equals heat number on material tag
- Grade, temper and form match the purchase order
- Cert is legible and dated, with supplier name
- Special requirements such as melt origin are met
Connecting to your ERP lot tracking
JobBOSS, E2 Shop System, Global Shop Solutions and ProShop can track material lots, but many small shops only use that on selected jobs. This worksheet works alongside the ERP or as a bridge while you build the habit. Match the job number to the ERP job so the record is searchable from both sides.
Common mistakes
Logging the PO but not the heat number defeats the purpose. Another is cutting a bar into several jobs without recording which pieces went where. If material is split across jobs, add a row per job with the quantity allocated and keep the same heat number.
Frequently Asked Questions
Does this meet AS9100 traceability requirements?
It is a working log, not a certified system. AS9100 and customer requirements set what records you must keep and for how long. Use this as a practical tool and check your quality manual and contract for the rules that apply.
How long should I keep cert records?
Retention depends on your customer contracts, regulatory requirements and quality system. Some aerospace and defense contracts require many years. Check each contract and your own procedure.
Can I log bar stock split across jobs?
Yes. Add one row per job with the same heat number and the quantity allocated to each. That keeps the link between heat lot and job clean for audits.
Is my data uploaded?
No. The worksheet runs in your browser and exports locally to Excel, PDF or CSV.
If you want lot traceability pulled from receiving, travelers and shipping automatically, Netray can help build that on top of your ERP data.
Related Tools
Outside Processing Purchase Order Template for Job Shops
A purchase order template for sending parts out for heat treat, plating, anodize, grinding or paint, with process spec, certs and return instructions.
Quality & InspectionJob Shop First Piece Inspection Sign-Off Template
A simple first piece sign-off sheet for the traveler: measured values against requirements, gauges used and approval to run the lot.
MES & Shop FloorJob Shop On-Time Delivery Tracker Worksheet
An editable tracker that computes days late per job and the shop on-time delivery rate from promised and actual ship days.
Costing & FinanceJob Shop Job Close-Out Variance Worksheet
Editable worksheet comparing quoted versus actual hours and material to show variance and margin per closed job.
More Quality & Inspection tools
See all- Machine Shop Inspection and Audit Checklist
- SAP QM Process Capability Cp Cpk Calculator
- SAP QM Lot Rejection Rate, PPM and Sigma Level Calculator
- SAP QM Gauge R&R Study Calculator
- SAP QM Cp and Cpk Capability Calculator
- Job Shop Scrap and Rework Cost Calculator
- Master Data Audit Sample Size Calculator
- Data Quality Sigma Level Calculator
- Master Data Defect Rate, DPMO and Sigma Calculator
Keep exploring
Free tools
- Job Shop Setup Cost Per Piece CalculatorSee how setup hours, run time, material and margin combine into a per-piece cost and price, and how it falls as the lot size grows.
- Job Shop Machine Hour Rate WorksheetEditable worksheet that converts machine price, life, hours, power draw and maintenance into a cost per run hour for each machine.
- Job Shop Job Close-Out Variance WorksheetEditable worksheet comparing quoted versus actual hours and material to show variance and margin per closed job.
ERP fixes and how-tos
- How to Close a Job Order in SyteLineClose a SyteLine job order the right way: finish routings, issue material, receive finished goods, then run Close Jobs to post WIP to variance accounts.
- How to Close a Job in JobBOSS2Step by step guide to closing a job in JobBOSS2, including checking open operations, unposted material and labor, and why a job will not close.
- How to Issue Material in Epicor KineticIssue material to a job in Epicor Kinetic: direct and backflush options, substituting parts, the material queue, and what to check when issue fails.
Runs with your ERP
- Infor Factory Track Shop Floor with SyteLine: paperless labor, job and WIP reportingHow Factory Track Shop Floor kiosks record labor, job operations and WIP in SyteLine, with setup steps, common pitfalls and where a private AI layer helps.
- MachineMetrics with Infor VISUAL: Machine Data and Work OrdersHow MachineMetrics machine monitoring syncs work orders, schedules and labor with Infor VISUAL through an edge connector. Setup, pitfalls, alternatives, FAQ.
- Infor Factory Track with Infor LN: barcode inventory, labor and lot or serial traceabilityFactory Track covers barcode inventory, job material, labor and lot or serial traceability for Infor LN and SyteLine. Setup, pitfalls and a private AI layer.
Guides
- Certificates of Conformance and Material Traceability for Aerospace PartsWhat goes in an aerospace certificate of conformance, how to trace heat and lot numbers from mill cert to shipped part, and keep records auditors accept.
- Forging Heat Number Traceability and Mill Cert ControlHow forge shops keep heat number traceability from mill cert to finished forging: lot splits, marking, cert packages, and audit-ready retrieval.
- ERP for Job Shops and Custom FabricatorsERP for job shops and custom fabricators: fast quoting, estimating accuracy, shop floor data collection, nesting and real-time job costing that protects margin.
AI on your ERP
- Epicor Kinetic AI for Metal Fabrication: Jobs, Heat Numbers and Outside Processing in Plain EnglishPrivate AI on Epicor Kinetic for metal fabricators: ask about jobs, nests, heat numbers and outside processing in plain English, grounded in live data.
- AI for Global Shop Solutions schedulingHow AI reads Global Shop Solutions work orders, routings, and finite schedule data to explain late jobs and test rush orders, read-only and private.
Manufacturing hubs
- American Gear Manufacturers Association (AGMA): gear standards, quality and ERP for gear shopsAGMA gear manufacturers ecosystem: gear standards, accuracy grades, heat treat and inspection, plus quoting, ERP and private AI problems for gear shops.
- Greater Toronto Area precision machining and aerospace suppliersGuide to precision machining and aerospace suppliers in the Greater Toronto Area: AS9100, NADCAP, Controlled Goods, ecosystem groups, ERP and quoting issues.
Integrations
- How to add document OCR to ProShop ERPCapture supplier invoices, material certs, packing slips and inspection reports into ProShop with OCR, confidence scoring and human review before posting.
- How to add AI agents to Global Shop SolutionsHow to add AI agents to Global Shop Solutions: a read-first tool layer over its data and APIs, approval before any write, and on-prem model options for job shops.
Software
- ProShop ERPIndependent profile of ProShop ERP: a cloud ERP and quality system for machine shops. Modules, integrations, strengths, limits, alternatives and AI use cases.
- Global Shop SolutionsWhat Global Shop Solutions ERP is, how its estimating, scheduling and shop floor modules serve job shops, and which ERP alternatives to compare.