First Piece Inspection Sign-Off Template
A first piece check before the run is the cheapest scrap prevention a job shop has. This one-page sign-off gives the operator and inspector a place to record measured values, gauges and approval, then clip it to the traveler.
Fill in
Job Shop First Piece Inspection Sign-Off Template
First Piece Inspection Sign-Off
Job: J-24871 Part: NH-20417 Rev C Operation: Op 20, finish turn and bore Machine: Lathe 3 Operator: M. Reyes Date: 2026-10-19
Measurements
| Feature | Requirement | Actual | Gauge | Pass / Fail |
|---|---|---|---|---|
| Bore diameter | ||||
| Outside diameter | ||||
| Overall length | ||||
| Thread | ||||
| Surface finish |
Gauges and Result
Gauges used: 0-1 in micrometer cal. due 2027-02, bore gauge, thread plug gauge Result: Approved to run
Comments: Offset adjusted by 0.0003 in on bore after first cut. Second piece within tolerance.
Approval
This is a shop floor sign-off, not an AS9102 first article report. For aerospace first article requirements use a dedicated FAI form and your customer instructions.
Digital travelers with inspection steps
Optional: ask how first piece records can attach to the job in your ERP.
Optional. The tool and every export work without this. No spam.
How to use the sign-off
Fill in the job, part, operation and machine, then print or export the sheet. After the first piece is cut, measure each key feature against the drawing and write the requirement and actual value in the table. Record which gauge was used so a calibration question can be traced later. Pick a result, add comments about any offset change, and collect signatures before the lot is released to run.
What to measure
Do not measure everything. Pick features that carry the tightest tolerances, features that are hard to rework, and anything the customer flagged. On a turned part that usually means bore and outside diameters, length and thread. For milled parts add hole position and flatness.
- Critical dimensions first, then fits and threads
- Use gauges within calibration, record the ID
- Measure after the machine has warmed up
- Re-check after any offset change or tool swap
How it differs from AS9102 FAI
A first piece sign-off approves a setup and happens on every job or operation as needed. An AS9102 first article inspection is a formal, fully ballooned report on the part against every drawing characteristic, required by certain aerospace customers when a part is new or changes. Use this sheet for shop control and a formal FAI form where the customer requires one.
Common mistakes
Checking only one dimension and calling it good, measuring with a gauge that is past its calibration date, and starting the run before the inspector signs are the usual failures. Make the sign-off a gate: no signature, no run.
Frequently Asked Questions
Is this the same as an AS9102 report?
No. AS9102 defines a formal first article inspection report with specific forms and full characteristic accountability. This sheet is a shop floor setup approval. Use the formal report when your customer or contract requires it.
Who should sign it?
At minimum the operator and a second person, often an inspector or supervisor. Set the rule in your own procedure and apply it consistently.
How many pieces should be checked?
At least the first piece after setup and after significant changes. Many shops also check again after a tool change or at set intervals. Your control plan or customer requirement sets the actual frequency.
Can I add more features to the table?
Export to Word and add rows, or print and write in extra features by hand. The table is a starting layout.
If you want first piece results and gauge IDs captured against the job in your ERP, Netray can help design that workflow.
Related Tools
Job Shop Material Certification Log Worksheet
An editable log linking material heat or lot numbers to jobs, purchase orders and cert status, exportable to Excel for customer or auditor requests.
Costing & FinanceJob Shop Job Close-Out Variance Worksheet
Editable worksheet comparing quoted versus actual hours and material to show variance and margin per closed job.
Supply Chain & InventoryOutside Processing Purchase Order Template for Job Shops
A purchase order template for sending parts out for heat treat, plating, anodize, grinding or paint, with process spec, certs and return instructions.
Costing & FinanceJob Shop Setup Cost Per Piece Calculator
See how setup hours, run time, material and margin combine into a per-piece cost and price, and how it falls as the lot size grows.
More Quality & Inspection tools
See all- Machine Shop Inspection and Audit Checklist
- SAP QM Process Capability Cp Cpk Calculator
- SAP QM Lot Rejection Rate, PPM and Sigma Level Calculator
- SAP QM Gauge R&R Study Calculator
- SAP QM Cp and Cpk Capability Calculator
- Job Shop Scrap and Rework Cost Calculator
- Master Data Audit Sample Size Calculator
- Data Quality Sigma Level Calculator
- Master Data Defect Rate, DPMO and Sigma Calculator
Keep exploring
Free tools
- First Piece Inspection TemplateA setup approval record for the first part of a run, with dimension table, reason for inspection and release signatures.
- Job Shop Setup Cost Per Piece CalculatorSee how setup hours, run time, material and margin combine into a per-piece cost and price, and how it falls as the lot size grows.
- CNC First Piece Inspection Record TemplateA fill-in first piece inspection record for CNC jobs: dimensions, tolerances, gauges, results and approvals, exportable to PDF, Word or Excel.
Guides
- ERP for Aerospace Build-to-Print Machine Shops: What to RequireWhat an AS9100 build-to-print machine shop needs from ERP: revision control, traveler, lot traceability, outside processing, FAI and certs.
- First Article Inspection in a CNC Machine Shop: Process, Paperwork and Time SaversFirst article inspection for CNC machine shops: ballooning drawings, AS9102 forms, CMM programming, when FAI is required and how to cut the paperwork time.
- ERP for Job Shops and Custom FabricatorsERP for job shops and custom fabricators: fast quoting, estimating accuracy, shop floor data collection, nesting and real-time job costing that protects margin.
AI on your ERP
- AI for Global Shop Solutions, Built for How Job Shops Actually RunAdd AI to Global Shop Solutions without sending your quoting, scheduling, and job cost data outside your shop. Private, on-prem AI for GSS job shops.
- AI for JobBOSS2 in Precision Machining: Quotes, Routings and Job Cost Answers from Your Own DataPrivate AI for JobBOSS2 precision machine shops: quote history, routing actuals, job cost variance and on-time delivery answers, kept on your own network.