Compliance & ContractsFree worksheetPDF, Excel, Word exportDefense

CMMC Level 1 Checklist: 15 Practices for Federal Contract Information (Excel and PDF)

CMMC Level 1 applies to contractors that handle Federal Contract Information but not controlled unclassified information. It has 15 practices drawn from FAR 52.204-21. Use this worksheet to record what you have, who owns it and what proof you can show, then export it for your self-assessment file.

Free, optional. Reopen it on any device.
Download:
PracticeDomainWhat it meansExample evidenceOwnerStatusTarget date
Practices listed
15

Level 1 covers the 15 basic safeguarding requirements of FAR 52.204-21 for Federal Contract Information. You assess yourself annually and an authorized official affirms the result. Edit status and evidence for your own environment; the examples are common, not required.

Keep AI inside your CMMC boundary

Optional review of on-prem AI that does not expand your compliance scope.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the worksheet

Start by confirming that your contracts involve FCI and that you do not handle CUI, which would require Level 2. Review each practice, change the status to match reality, name an owner and attach a target date for gaps. In the evidence column record the specific document, screenshot or configuration that proves the practice. Keep the evidence together in one folder with the exported worksheet, because the affirmation is signed by a company official who is responsible for its accuracy.

What the 15 practices cover

The practices fall into six domains and are basic cyber hygiene: control who can use your systems, identify and authenticate users, sanitize media, limit physical access, protect the boundary, and keep software patched and free of malware. Most small companies already meet several of them through standard IT tools. The gaps are usually documentation, such as media disposal logs, visitor records, and proof that patches and scans are happening.

  • Access control: four practices.
  • Identification and authentication: two practices.
  • Media protection: one practice.
  • Physical protection: two practices.
  • System and communications protection: two practices.
  • System and information integrity: four practices.

Common mistakes and scope

The first mistake is to assume the whole company is in scope when only the assets that process, store or transmit FCI are. Define that boundary and write it down. The second is to mark a practice as implemented without evidence. The third is to treat Level 1 as one-off: the assessment is annual and the affirmation must be renewed. Companies that also handle CUI need Level 2 and should use a separate, more detailed assessment of the 110 NIST SP 800-171 requirements.

Frequently Asked Questions

How many practices are in CMMC Level 1?

Fifteen. They correspond to the basic safeguarding requirements in FAR clause 52.204-21 and protect Federal Contract Information. They are grouped under access control, identification and authentication, media protection, physical protection, system and communications protection, and system and information integrity.

Does Level 1 need a third-party assessment?

No. Level 1 is an annual self-assessment, followed by an affirmation from an affirming official, with the result entered in the government's reporting system. Level 2 may require a third-party assessment depending on the contract.

What is FCI?

Federal Contract Information is information provided by or generated for the government under a contract that is not intended for public release. It excludes simple transactional information such as payment data. If you also handle CUI you need Level 2.

Can I use this worksheet as my assessment record?

Yes, as a working record of status and evidence, provided you keep the underlying proof and follow the official assessment guide. It is a planning aid and does not replace the official CMMC assessment guide or legal advice.

Netray works with defense suppliers on private AI that runs inside their own boundary, so adopting AI does not widen your CMMC scope.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

Guides

AI on your ERP