Compliance & ContractsFree referencePDF, Excel, Word exportDefense

CUI Banner and Dissemination Control Marking Reference

CUI marking looks simple until you have to write the banner for a drawing that is both export controlled and controlled technical information, with a distribution limit. This reference gives the syntax rules and the markings that appear most often at defense suppliers.

Download:
ElementMarking or exampleWhere it goesRule of thumb
Banner (basic)
CUI
Top and bottom of every page
Minimum marking when no category is added; CONTROLLED is an allowed alternative
Banner with category
CUI//SP-CTI
Top and bottom of every page
Double slash separates CUI from category markings
Specified category prefix
SP-
Before the category code
Used for specified categories, which carry extra handling rules in law or regulation
Basic category
CUI//EXPT
Banner
Basic categories are written without the SP- prefix
Multiple categories
CUI//EXPT/SP-CTI
Banner
Separate by a single slash; basic categories come first, then specified, each in alphabetical order
Controlled Technical Information
CTI
Category code, written SP-CTI
Technical information with military or space application subject to distribution controls
Export Controlled
EXPT
Category code
Items subject to the ITAR or EAR; the CUI marking does not replace export control marking
Proprietary Business Information
PROPIN
Category code
Commercially sensitive information provided to the government
Privacy
PRVCY
Category code
Personally identifiable information protected by law
Dissemination control separator
CUI//SP-CTI//NOFORN
Banner
A second double slash precedes limited dissemination controls
Multiple dissemination controls
FEDCON/NOFORN
Banner
Separate several controls with a single slash
No foreign dissemination
NOFORN
Limited dissemination control
Not releasable to foreign nationals
Federal employees and contractors only
FEDCON
Limited dissemination control
Restricts to federal employees and contractors
Federal employees only
FED ONLY
Limited dissemination control
Restricts to federal employees
No contractor dissemination
NOCON
Limited dissemination control
Do not release to contractors
Authorized list only
DL ONLY
Limited dissemination control
Dissemination list controlled; the list must be named
Release to named countries
REL TO USA, [country codes]
Limited dissemination control
Lists countries that may receive the information
Display only
DISPLAY ONLY [country]
Limited dissemination control
Foreign recipient may view but not retain
Portion marking (optional)
(CUI) or (U)
Start of paragraph or figure
Optional in the DoD unless the contract or originator requires it; if used, use it throughout a document
Designation indicator: controlled by
Controlled by: [office or agency]
First page or cover, lower area
Identifies the designating agency, not your company
Designation indicator: category
CUI Category: [full names]
First page or cover
Spell out category names, not codes
Designation indicator: dissemination
Distribution/Dissemination Control: [control]
First page or cover
Required when a limited dissemination control applies
Designation indicator: point of contact
POC: [name and phone or email]
First page or cover
Person who can answer questions about the CUI
Email subject and body
Banner text in the body; note CUI in subject if policy requires
Email
Follow your CUI policy and encrypt in transit
Removable media
Apply a CUI label
External surface of media
Label the device so users can tell it holds CUI
Decontrol
Remove markings when the originator decontrols
All copies
Only the designating authority can decontrol

Syntax follows the National Archives CUI marking guidance under 32 CFR Part 2002 and DoD implementation guidance. Contract language, originator instructions and the CUI Registry take precedence. Always confirm with the contracting officer or the document originator.

Automate banners on ERP output

Optional: see how marking could be applied to travelers and reports generated from your ERP.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Search the table by category code such as CTI or EXPT, by control such as NOFORN, or by field name. Read the Where column to know where the marking is placed, and the rule of thumb to avoid common errors. Copy examples as a starting point and then check the originator's marking instructions and the contract. If the customer gave you a document already marked, keep their markings; do not re-mark or remove them. If you create CUI from controlled source information, mark it as the contract directs.

Banner syntax in plain terms

A banner starts with CUI, then double slashes before the category list, then double slashes before limited dissemination controls. Within a group, items are separated by a single slash. Specified categories use an SP- prefix, and basic categories do not. The banner goes at the top and bottom of every page. A designation indicator on the first page tells readers who designated it and who to ask. Portion marking is optional in many DoD cases, but once used it should be consistent.

  • CUI//SP-CTI for controlled technical information
  • CUI//EXPT/SP-CTI when both categories apply
  • CUI//SP-CTI//NOFORN adds a dissemination control
  • Designation indicator: Controlled by, Category, Distribution, POC

Common mistakes

The usual errors are using export control language instead of CUI banners, or the reverse. CUI marking does not replace ITAR or EAR statements. Others include marking only the first page, writing category codes in the designation indicator where full names belong, and adding a company name as the controlling office. Make sure templates for drawings, travelers and emails carry the right banner by default, and that the title block and header or footer fields survive PDF export.

Frequently Asked Questions

Is CUI the same as ITAR?

No. CUI is a government wide category of information that needs safeguarding. ITAR controlled technical data is often also CUI, in the EXPT category, but the export control rules still apply separately and your ITAR procedures still govern access by foreign persons.

Do I have to portion mark?

Not in every case. DoD guidance makes portion marking optional for CUI unless the contract or originator says otherwise, but if you start portion marking a document you should do it throughout.

Who decides the category?

The designating agency or the contract does. Use the markings supplied by the customer, and ask the contracting officer if a deliverable's marking is unclear.

Do I mark internal working copies?

Yes. CUI you create or hold under a contract should be marked as the contract requires, including drafts and extracts, and protected in the same way as the original.

If you want ERP printouts, travelers and work instructions to carry the right banner automatically, we can help design that with your document control rules.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Guides

AI on your ERP

Software