Compliance & ContractsFree worksheetPDF, Excel, Word exportDefense ManufacturingUnited States

CMMC Level 2 Excel Spreadsheet Template with Level 1 Checklist and Scoring

This CMMC Level 2 spreadsheet tracks all 110 practices by control family, shows percent complete and lists the evidence an assessor typically asks for. Below it you will find the Level 1 checklist, how Level 1 and Level 2 scoring work, and what to put in your network and data flow diagrams.

Free, optional. Reopen it on any device.
Download:
Control familyID prefixPracticesPractices metPercent metTypical evidenceOwnerStatus
63.6%
100%
55.6%
66.7%
72.7%
33.3%
66.7%
55.6%
100%
83.3%
33.3%
50%
56.3%
71.4%
Total practices
110
Total met
70
Overall practices met
63.6%
Open practices
40

The 14 families and 110 practices come from NIST SP 800-171 Revision 2 as used by CMMC Level 2. Counts per family are the standard counts. Verify the current assessment guide before an assessment, since scope and guidance documents are updated.

Keep CUI inside your boundary

Optional: talk through how a private on-prem AI layer can sit inside your CMMC enclave.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

Using the Level 2 control tracker

Set the practices met column only when you hold evidence, not when the control is merely planned. Assign an owner per family, and move the status to Verified after someone other than the owner checks the evidence. The percent column and overall total update as you edit. Export to Excel to keep a dated copy for your system security plan and POA&M. Practice level detail (for example AC.L2-3.1.1) can be added as rows if you prefer one row per practice.

CMMC Level 1 checklist and scoring

Level 1 covers 17 practices that map to the 15 basic safeguarding requirements of FAR 52.204-21, protecting Federal Contract Information. It is assessed by an annual self-assessment with an affirmation by a senior official. There is no numeric score: each practice is met or not met, and all must be met. Level 2 differs. A self or C3PAO assessment is scored against 110 with weighted deductions of 1, 3 or 5 points per unmet practice, and conditional status generally needs a score of at least 80 percent with open items closed within 180 days.

  • Access control: limit access to authorized users and devices, limit to permitted transactions, control external connections, control public information
  • Identification and authentication: identify and authenticate users and devices
  • Media and physical: sanitize media, limit physical access, escort and log visitors, control keys and devices
  • System protection: boundary protection, separate public components, flaw remediation, malicious code protection, updates and scans

Network and data flow diagram examples for a machine shop

Assessors want to see where CUI is stored, processed and transmitted. A good network diagram for a small shop shows the internet edge and firewall, a separate VLAN for the CUI enclave holding the file server and CAM workstations, a segregated shop floor VLAN for CNC controllers, wireless networks marked as in or out of scope, and any cloud service such as a government community cloud mail tenant. The data flow diagram traces a drawing from customer portal download to file share, CAM programming, DNC transfer to the machine and archival or deletion. Label every arrow with protocol and encryption.

Evidence and common mistakes

Good evidence is dated, attributable and shows the setting itself: a configuration export, a console screenshot with the date visible, a signed record. Common mistakes are listing the policy as the only evidence, leaving CNC machines out of the asset inventory, forgetting external service providers in the shared responsibility matrix, and counting a practice as met when it is only done on some of the systems in scope.

Frequently Asked Questions

How many practices are in CMMC Level 1 and Level 2?

Level 1 has 17 practices and Level 2 has 110 practices drawn from NIST SP 800-171 Revision 2. Level 2 practices are grouped into 14 families such as Access Control, Audit and Accountability and System and Communications Protection.

Is there a score for CMMC Level 1?

No numeric score is used. Each of the 17 practices is either met or not met, and you must meet all of them to affirm compliance. The SPRS style 110 point score applies to Level 2.

How do I score Level 2?

Start at 110 and subtract the point value of each unmet practice, which is 1, 3 or 5 depending on the practice. A fully compliant company scores 110. Some practices allow partial credit, so check the DoD scoring methodology for exceptions.

What should a CMMC network diagram include?

Show the scope boundary, firewalls, VLANs, systems that store or process CUI, out of scope networks, remote access paths, wireless, and external cloud services. Include IP ranges or segment names and the data flows between them.

If CUI lives in an on-prem ERP or file share, Netray can add a private AI layer inside your boundary so engineers get answers without CUI leaving your enclave.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

Guides

AI on your ERP