CNC Program Revision Log Worksheet
The wrong program revision on the machine is a classic cause of scrap and customer returns. This log ties each program change to a reason, a cycle time effect and a proveout status, so you can see what is released and why.
| Program | Part and print rev | Program rev | Reason for change | Cycle time before (min) | Cycle time after (min) | Time saved per part (min) | Proveout status | Changed by | Date | |
|---|---|---|---|---|---|---|---|---|---|---|
-16.2 | ||||||||||
1.7 | ||||||||||
-0.3 | ||||||||||
-9.4 |
For new programs, set cycle time before to zero; the saved column then shows a negative number that you can ignore. Keep a copy of each released program file, not just the log entry.
Compare program cycle times with ERP routings
Optional: a review of how routing times could be checked against real program cycle times.
Optional. The tool and every export work without this. No spam.
How to use the log
Add a row each time a program is created or edited. Record the program name, the part and print revision it matches, and a short revision letter. Choose the reason for change from the list, enter cycle time before and after, and set proveout status as the program moves from dry run to released. Name the person making the change and the date. Export to Excel for audits or to share with the quality team.
Controlling NC programs
A log is a record, not control. Real control means one authoritative location for released programs, a rule that machines only run what is released, and a way to see differences between revisions. Many shops use a DNC system or a source control tool for this, and the log complements it by explaining why a change was made.
- Match each program revision to a print revision
- Require proveout before status becomes Released
- Record cycle time changes so quoting and capacity data stay honest
- Retire old revisions and remove them from machine memory
Common mistakes
Operators often make small edits at the control and never write them back. Name your programs so that the revision is visible, and require edits to be saved to the master location. Another mistake is changing feeds to fix a problem without noting it, so the same problem reappears at the next job. Review the log at least when the print revision changes, and compare cycle times against what the ERP routing says.
Frequently Asked Questions
Is a spreadsheet enough for program control?
For small shops it can be, if there is one master location and discipline about edits. Larger or regulated shops usually add DNC or version control so that machines only receive released files.
What should the revision scheme look like?
Any consistent scheme works, such as letters or numbers. Make sure the program revision is distinct from the print revision and that both appear in the log.
Do I need to log operator edits at the machine?
Yes, if they are kept. Either save them back as a new revision or revert them. Unrecorded edits are a common reason the same part runs differently on another shift.
Why log cycle time before and after?
It shows whether changes helped and keeps routing, quotes and capacity planning aligned with real cycle times.
If routing times in your ERP drift from real program cycle times, Netray can build a read-only comparison. This log works without any system behind it.
Related Tools
CNC Setup Sheet Template
A fill-in CNC setup sheet covering job data, work offsets, workholding, tools and operator notes, with PDF, Word and Excel export.
Quality & InspectionCNC First Piece Inspection Record Template
A fill-in first piece inspection record for CNC jobs: dimensions, tolerances, gauges, results and approvals, exportable to PDF, Word or Excel.
Costing & FinanceCNC Job Quote Estimate Worksheet
An editable CNC quote worksheet that rolls material, setup, run time and outside services into a price per part.
MES & Shop FloorCNC Tool Life Tracking Log Worksheet
An editable log of tool life in parts and cutting minutes, with tool cost per part so you can set change intervals.
More Engineering & PLM tools
See all- CNC Workholding and Fixture Plan Template
- ISO 286 IT Tolerance Grade Table (IT5 to IT9)
- SAP Super BOM Design Worksheet
- SAP Engineering Change Number Checklist
- SAP Document Info Record Template
- SAP Change Master and Revision Level Log
- SAP Engineering Change Request (ECR) Template
- SAP BOM Usage and Item Category Reference
- SAP Engineering Change Obsolescence Exposure Calculator
Keep exploring
Free tools
- Drawing Revision Log WorksheetAn editable revision history log for engineering drawings with ECO reference, change description, approver and release date.
- SAP Change Master and Revision Level LogTrack change numbers, validity dates, revision levels and the number of BOMs and routings each engineering change touches.
- CNC Program Header and Safe Start Block GeneratorCreate a consistent program header with revision comments, a safe start line and a tool change sequence for a mill.
ERP fixes and how-tos
- Managing Item Revisions and Effectivity in ERPUnderstand revision versus version, date, lot and serial effectivity, and how to keep item and BOM revisions consistent between PLM and ERP without surprises.
- JDE package build failed: how to find the real causeA failed JDE package build tells you almost nothing in Package Build Workbench. Here is where the build log, table conversion log, and compile errors actually live and what to check first.
Guides
- How to Quote CNC Machined Parts: A Step by Step MethodHow to quote CNC machined parts step by step: material, setup, cycle time, outside processing, quantity breaks and margin, plus common costly mistakes.
- How to Set Up Document Control in SyteLineGuide to implementing document control in Infor SyteLine. Configure document types, revision management, approval workflows, and distribution control for ISO 9001 and AS9100 compliance.