CNC First Piece Inspection Record Template

First piece inspection stops a bad setup from turning into a lot of scrap. This record documents what was measured, with what, and who released the machine to run, which is what auditors and customers ask to see.

Fill in

Live preview
Free, optional. Reopen it on any device.
Download:

CNC First Piece Inspection Record Template

First Piece Inspection Record

Company: Acme Precision Machining Job: WO-104455 Part: BRK-2210 Rev C Operation: OP10 mill top face and pockets Machine: VF-4SS Lot quantity: 250 Inspector: R. Mehta Date: 2026-10-20

Measurements

Char #DescriptionNominal and toleranceGaugeActualPass / Fail
1
2
3
4
5
6

Result

Overall result: Approved to run

Comments and Adjustments

Pocket depth was 0.03 mm over nominal. Wear offset on T2 adjusted by +0.03 mm and a second piece measured in tolerance.

Approvals

Machinist / Date
Inspector / Date
Quality or shift lead / Date

This is a general shop-floor record, not an AS9102 form. For aerospace first article inspection use the structure your customer requires. Gauges must be in calibration.

Link inspection records to the work order in your ERP

Optional: an outline of how first piece results could be attached to ERP work orders and lots.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the record

Machine the first piece, then list each print characteristic you are verifying, with nominal, tolerance and the gauge used. Fill in actual values and mark pass or fail. If anything fails, record the adjustment you made and measure again before approving. Choose an overall result, add comments and sign. Export to PDF to attach to the traveler or to Excel if you want to trend results. The table is intentionally blank for you to complete at the bench or after export.

What to measure on the first piece

You rarely need every dimension on the print, but you should cover the features most likely to move with setup and tool offsets.

  • Critical and key characteristics called out on the print or control plan
  • Features set by offsets: depths, bore sizes, lengths and positions relative to part zero
  • Features from each tool that cuts a tolerance, since each has its own offset
  • Surface finish and thread fit where specified, with the right gauge
  • Any feature on a later operation that depends on this one as a datum

Common mistakes

A first piece check is only as good as the gauge. Using a caliper for a feature that needs a bore gauge or CMM invites false approvals. Another miss is measuring a warm part straight off the machine, which reads large for most metals. Finally, do not skip a recheck after an offset adjustment: the second piece proves the correction worked. Keep the signed record with the job, not on the machine.

Frequently Asked Questions

Is this the same as an AS9102 first article report?

No. AS9102 has a specific three-form structure for aerospace. This is a simpler shop-floor first piece record. If your customer requires AS9102, use that format instead.

How many characteristics should I list?

At minimum, the critical and key characteristics plus features driven by offsets and setup. Your control plan or customer requirement may set a longer list.

Who should sign the record?

Typically the machinist who made the part, the inspector who measured it, and a supervisor or quality lead who releases the lot. Follow your own quality system's roles.

Does the record need to be kept?

Most quality systems retain it with the job. Retention periods come from your customer and your own procedure, so check them rather than assuming a fixed number of years.

If your inspection results should land in the ERP or QMS automatically, Netray can scope an integration. The template works standalone without it.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Guides

AI on your ERP