Developer ToolsFree generatorPDF, Excel, Word exportMachining

CNC Program Header and Safe Start Block Generator

Consistent program headers make NC programs easier to find, review and trust. A good safe start line cancels everything left over from the previous program, so the first move does what the programmer intended. This generator builds that header in a few seconds.

Fill in

Generated code
Free, optional. Reopen it on any device.
Download:

Program header and first tool

%
O4821 (BRKT-48213-A REV C)
(OP10 FACE AND POCKET)
(PROGRAMMER AJ, 2026-10-20)
(T1 50 MM FACE MILL)
(WORK OFFSET G54)
G90 G17 G40 G49 G80 G94 G21 (SAFE START LINE)
G91 G28 Z0 (RETURN Z TO HOME)
G90
T1 M6
G54 G0 X0.0 Y0.0 S1800 M3
G43 H1 Z100.0
M8
(MACHINING BLOCKS GO HERE)
G91 G28 Z0
M9
M5
G28 X0 Y0
M30
%

This is a generic Fanuc style starting point for a milling center. Metric units (G21) are assumed, so change to G20 for inch programs. Verify the coolant codes, return to home commands and tool change macro on your machine. Review every program in single block before first cut.

Link NC programs to routings

Optional: a conversation on tying program numbers and revisions to ERP routings and work orders.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the generator

Fill in the program number, part number, drawing revision, operation and the first tool. The code block updates immediately. Copy the result into your CAM post, editor or machine, or export it to include in a setup package. Adjust the home return and tool change blocks to match your machine builder's recommendations.

What the safe start line does

G90 selects absolute mode, G17 selects the XY plane, G40 cancels cutter compensation, G49 cancels tool length compensation, G80 cancels any canned cycle and G94 sets feed per minute. G21 selects metric units. Together they put the control in a known state regardless of what the last program or MDI command left active.

  • G90 absolute positioning
  • G40 and G49 cancel compensation
  • G80 cancels canned cycles
  • G94 feed per minute, G21 metric

Why the header comments matter

Part number and drawing revision in the first comment let an operator verify they loaded the right program for the job on the traveler. Many shops also record the programmer and date so a change can be traced. Keep comments short and uppercase, since some controls limit comment length or character sets.

Common mistakes

Leaving out G49 before a tool change on a machine with a leftover offset, starting without a Z home return, and putting a work offset call after the first rapid. Another mistake is changing the revision in the drawing but not in the program header, which defeats the point of the comment.

Frequently Asked Questions

What is a safe start line in G-code?

It is a block at the top of a program that cancels modal states such as cutter compensation, tool length compensation and canned cycles, and sets absolute mode and units. It prevents leftover settings from affecting the first moves.

Do I need G28 before a tool change?

It depends on the machine. Many mills require Z at its home position before M6, and some do this inside the tool change macro. Follow the machine builder's recommended tool change sequence for your model.

Should the header use G20 or G21?

Use G21 for metric and G20 for inch programs. Some shops avoid mixing by setting units in the post processor and a comment in the header, so operators never wonder which system the program uses.

Can I add more tools to this template?

Copy the generated tool call, spindle start and G43 lines for each additional tool and change the numbers. Many CAM systems do this automatically; the template is mainly for hand written programs and standard headers.

If drawing revisions, NC programs and traveler data live in different systems, we can discuss linking them so the right program is always tied to the right revision.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

Guides

AI on your ERP