CNC Machining Quote Review Checklist
Most underpriced jobs were not underpriced by arithmetic. They were underpriced by a missed note, a tight tolerance nobody planned for or a stale material price. This checklist is a pre-send gate for the items that most often go wrong.
0 of 40 items complete
12 critical items still open - these are the highest-risk gaps.
Drawing and requirements review
Tolerances and process feasibility
Material and outside processing
Cost build
Risk, capacity and delivery
Commercial terms and send-out
Aim to complete every critical item before sending. For quotes above your internal review threshold, have a second person sign off. Review quote vs actual cost after the job to improve future estimates.
Capture quote reviews in your ERP workflow
Optional: we can discuss routing quote reviews through an approval workflow tied to your ERP.
Optional. The tool and every export work without this. No spam.
How to use the checklist
Work through the groups in order for every new part or revision. Mark each item done and treat the critical items as hard stops. For repeat parts with a recent quote, you can shorten the review to the revision, price and capacity checks. Export the completed list to keep with the quote record. It also becomes useful evidence of contract review activity if your quality system requires it, as AS9100 and ISO 9001 both expect a review of requirements before accepting an order.
- Run the checklist before you finalize pricing, not afterward
- Assign owners if different people handle engineering, buying and cost
- Keep completed lists with the quote for post-job comparison
Where quotes most often go wrong
Missed notes and flow-downs lead the list: a special process requirement or a customer-specific inspection note that was not priced. Next come tolerances: a single tight bore can double a part's cycle time or require grinding. Material pricing follows, especially for titanium, nickel and copper alloys that move monthly. Then come setup and inspection time, which are the least visible costs when estimating from cut time alone. The checklist is ordered to catch these early, before time is spent on a detailed cost build.
Using it with the other quoting tools
Pair the cost build section with the cycle time estimator, material blank cost calculator and multi-operation worksheet for the numbers, and the floor price calculator for the decision. Use the assumptions and exclusions template to put the results in writing. When a job is complete, compare actual hours and material to the estimate and update the realization factors, rates and scrap allowances you use. Over a year this feedback loop is worth more than any single formula.
Common mistakes
Treating the checklist as paperwork instead of a decision gate is the main failure. Another is skipping the second-person review for large quotes because of time pressure. Teams also tend to skip the capacity item, then promise delivery that requires overtime. Finally, avoid hiding risk inside the price. If a requirement is uncertain, put it in the assumptions so the customer sees what the price depends on.
Frequently Asked Questions
Does this satisfy AS9100 contract review?
It supports the activity but does not by itself satisfy a standard. Your quality system defines what records are required. Use this list as a prompt and retain the completed copy with the quote record.
Which items should never be skipped?
Drawing revision, flow-down notes, critical characteristics, material source and certification, capacity and the margin check. Missing any of these is the most common cause of costly surprises after an order is won.
How often should the checklist be reviewed?
Review it after each lost money job. If a problem was not caught by an existing item, add one. A short checklist tuned to your shop works better than a long generic one.
Should customers see the checklist?
Generally no, it is an internal tool. Share the resulting assumptions and exclusions instead, which communicate the same risks to the customer in a form they can respond to.
If contract review and quote history are scattered across email and spreadsheets, Netray can help bring estimates, actuals and review records into one place alongside your ERP.
Related Tools
CNC RFQ Quote Assumptions and Exclusions Template
Fill in fields and export a clean quote with quantity breaks, stated assumptions, exclusions, inspection and delivery terms.
Costing & FinanceMulti-Operation CNC Machining Quote Worksheet
An editable routing-style quote sheet: one row per operation, setup and run cost computed, outside processing added, cost per piece rolled up.
Costing & FinanceCNC Quote Floor Price and Contribution per Spindle Hour Calculator
Check a quoted price against full cost, a variable-cost floor, a target margin price and throughput per spindle hour before you send it.
Supply Chain & InventoryCNC Material Blank Cost Calculator
Size the blank from the finished part and stock allowance, then cost it from bar length, saw kerf, end drop and chip scrap credit.
More Quality & Inspection tools
See all- SAP QM Process Capability Cp Cpk Calculator
- SAP QM Lot Rejection Rate, PPM and Sigma Level Calculator
- SAP QM Gauge R&R Study Calculator
- SAP QM Cp and Cpk Capability Calculator
- Job Shop Material Certification Log Worksheet
- Job Shop First Piece Inspection Sign-Off Template
- Job Shop Scrap and Rework Cost Calculator
- Master Data Audit Sample Size Calculator
- Data Quality Sigma Level Calculator
Keep exploring
Free tools
- CNC Job Quote Estimate WorksheetAn editable CNC quote worksheet that rolls material, setup, run time and outside services into a price per part.
- Sheet Metal Quote Review Checklist Before SendingA grouped checklist that catches the common quoting misses on drawings, material, cutting, forming, hardware, finishing and terms.
- CNC Machining Cost CalculatorBuild a per part CNC price from setup hours, cycle time, shop rate, material, tooling, outside processing, scrap and margin.
Guides
- How to Quote CNC Machined Parts: A Step by Step MethodHow to quote CNC machined parts step by step: material, setup, cycle time, outside processing, quantity breaks and margin, plus common costly mistakes.
- AI for Casting RFQ and Drawing ReviewHow a private AI reads casting RFQ packages, prints and specs, flags alloy, NDT and tolerance risks, and drafts questions for the customer before you quote.
- How to Quote a Wire Harness From a Customer DrawingStep-by-step wire harness quoting: read the drawing, build the BOM, price wire and connectors, time every termination, and add NRE, test and scrap.
AI on your ERP
- AI for Paperless Parts: Faster RFQ Review Without Sending Your Customers' Drawings to a Public ModelAdd private AI around Paperless Parts quoting: RFQ intake, drawing review, historical quote comparison and ERP handoff, without sending part data to a public model.
- AI for MachineMetrics: Connect CNC Machine Data to ERP Jobs, Costs and AnswersCombine MachineMetrics machine data, downtime reasons and cycle times with ERP jobs and costs, and ask plain-English questions with a private AI layer.