Out-of-Tolerance Dimensional Inspection SQL Query Generator
Most quality systems store inspection values along with lower and upper limits. These three queries turn that raw data into a rejection list, a per-characteristic summary and an early warning for characteristics drifting toward a limit.
Fill in
1. List every out-of-tolerance measurement
SELECT
lot_no,
characteristic_id,
measured_value,
lower_limit,
upper_limit,
CASE
WHEN measured_value < lower_limit THEN measured_value - lower_limit
ELSE measured_value - upper_limit
END AS deviation_from_limit,
inspected_at
FROM dbo.inspection_results
WHERE part_no = 'PN-48213'
AND inspected_at >= '2026-07-01'
AND inspected_at < '2026-09-30'
AND (measured_value < lower_limit OR measured_value > upper_limit)
ORDER BY inspected_at DESC;2. Summary per characteristic
SELECT
characteristic_id,
COUNT(*) AS measurements,
SUM(CASE WHEN measured_value < lower_limit OR measured_value > upper_limit THEN 1 ELSE 0 END) AS out_of_tolerance,
100.0 * SUM(CASE WHEN measured_value < lower_limit OR measured_value > upper_limit THEN 1 ELSE 0 END) / COUNT(*) AS pct_out,
AVG(measured_value) AS mean_value,
MIN(measured_value) AS min_value,
MAX(measured_value) AS max_value,
STDEV(measured_value) AS std_dev,
MIN(lower_limit) AS lsl,
MIN(upper_limit) AS usl
FROM dbo.inspection_results
WHERE part_no = 'PN-48213'
AND inspected_at >= '2026-07-01'
AND inspected_at < '2026-09-30'
GROUP BY characteristic_id
ORDER BY pct_out DESC, characteristic_id;3. Characteristics close to a limit (mean within 25 percent of the band)
SELECT characteristic_id, AVG(measured_value) AS mean_value, MIN(lower_limit) AS lsl, MIN(upper_limit) AS usl
FROM dbo.inspection_results
WHERE part_no = 'PN-48213'
AND inspected_at >= '2026-07-01'
AND inspected_at < '2026-09-30'
GROUP BY characteristic_id
HAVING AVG(measured_value) < MIN(lower_limit) + 0.25 * (MIN(upper_limit) - MIN(lower_limit))
OR AVG(measured_value) > MIN(upper_limit) - 0.25 * (MIN(upper_limit) - MIN(lower_limit));Table and column names are generic placeholders, so map them to your own quality or ERP inspection tables. The script uses SQL Server syntax: use STDDEV or STDDEV_SAMP on Oracle, PostgreSQL and MySQL, and a bound parameter instead of an inline part number in production code. Limits that vary by lot should be grouped per limit pair. Test against a copy of the data before scheduling.
Ask your inspection data in plain English
Optional: a short review of how a private, read-only assistant could answer quality questions from your ERP and CMM data.
Optional. The tool and every export work without this. No spam.
How to use the generator
Enter the name of your inspection results table and map each column: part number, characteristic, lot, measured value, limits and date. Add the part number and the date range, then copy the queries into your SQL client or report tool. The first query lists every failing measurement with its distance from the nearest limit. The second summarizes each characteristic with count, percent out, mean, spread and limits. The third finds characteristics whose average sits close to a limit.
- Run query 2 first to find which characteristics deserve attention
- Use query 1 to pull the lots for containment or an NCR
- Schedule query 3 weekly as a drift check
Why the summary matters
A percent-out figure only tells you that something failed. Comparing the mean and spread to the limits tells you why. A mean near one limit with a small standard deviation points to a centering problem, which is cheaper to fix with an offset. A mean at the center with a large standard deviation points to a variation problem, which needs a process fix. From the mean and the standard deviation you can also estimate Cpk as the smaller of (USL minus mean) and (mean minus LSL), divided by 3 sigma.
Reading the output
Suppose a bore characteristic shows 400 measurements, 12 out of tolerance, a mean of 25.012 against limits of 24.990 and 25.020, and a standard deviation of 0.006. The mean is within 0.008 of the upper limit, and the rejects are all above it. Shifting the process mean down by about 0.008 would remove most of the failures. That is the kind of conclusion a raw failure list does not give you.
ERP and data notes
Inspection data may live in an ERP quality module, a CMM database, an MES, or spreadsheets. Check how your system stores measurements: some store attribute results only, some store one row per sample with the limits in a separate plan table, requiring a join. Limits can change with drawing revision, so join to the revision if you need an exact historical picture. Confirm decimal precision and unit of measure before comparing values.
Frequently Asked Questions
Will this work with SAP QM or SyteLine tables?
The table and column names here are generic placeholders. You need to map them to your own schema, and in many ERPs the limits live in a separate plan table that has to be joined. Check your vendor data model before running against production.
How do I get a Cpk from these results?
Take the mean and standard deviation from query 2, then compute the smaller of (USL minus mean) and (mean minus LSL), and divide by three times the standard deviation. Use it only if the data is from a stable process and is reasonably normal.
Why is the date filter written with less than the end date?
Using a half-open range avoids losing results from the last day when the column has a time part. If you want the end date included, set the To date to the following day.
Is it safe to run on a production database?
These are read-only SELECT queries, but a large unindexed table can still slow other users. Run them on a reporting copy or with a narrow date range, check the execution plan, and use parameters rather than pasted values in any scheduled job.
If inspection data sits in an ERP or MES that is hard to query, Netray can help set up a read-only, on-prem assistant that answers these questions and shows the SQL it ran.
Related Tools
Monte Carlo Tolerance Stack-Up Python Script Generator
Fill in up to four stack dimensions and a gap limit, and get a Python script that simulates the assembly and reports worst case, RSS and out-of-limit rate.
Quality & InspectionTolerance vs Process Capability Review Worksheet
A worksheet that checks each toleranced feature against measured process mean and standard deviation, returning Cp, Cpk and predicted defects per million.
Quality & InspectionDimensional Inspection Record Worksheet
Enter nominal, plus and minus tolerance and the measured value for each dimension. Deviation and pass or fail are computed per row.
Quality & InspectionCMM Inspection Report Template
A coordinate measuring machine report layout with setup details, datum alignment, a feature results table and sign-off lines.
More Developer Tools tools
See all- OEE SQL Query Generator
- OEE Power BI DAX Measures Generator
- Gage R&R Python Script Generator (Average and Range)
- Calibration Due List SQL Query Generator
- SAP Sales Order ABAP SELECT Generator (VBAK, VBAP, VBFA)
- SAP Sales Order Create BAPI ABAP Generator (BAPI_SALESORDER_CREATEFROMDAT2)
- SAP ABAP Open Items SELECT Generator
- SAP ACDOCA SQL Query Generator
- SAP QM Inspection Lot ABAP SELECT Generator
Keep exploring
Free tools
- Inspection Results SQL Query GeneratorFill in your own inspection table and column names to generate SQL for lot reject rate by supplier and top failing characteristics.
- OEE SQL Query GeneratorFill in your table and column names and get a SQL query that calculates availability, performance, quality and OEE per line per day.
- PPAP Dimensional Results WorksheetAn editable dimensional results sheet with five measured values per characteristic and automatic conformance checks.