Document Classification Taxonomy Worksheet
Before a document AI tool can route a PDF anywhere, someone has to define the list of document types and what happens to each. This worksheet is that catalog: one row per type, with the channel it arrives by, how it will be classified and extracted, where it lands in the ERP and what review effort it will create.
| Document type | Category | Arrives via | Extraction method | Key fields | Lands in | Retention | Documents per month | Share needing review (%) | Minutes per review (min) | Review hours per month | |
|---|---|---|---|---|---|---|---|---|---|---|---|
53 hrs | |||||||||||
10 hrs | |||||||||||
24 hrs | |||||||||||
9 hrs | |||||||||||
7 hrs |
Retention periods are legal and contractual questions, so confirm them with your records policy and customers rather than relying on defaults. Start with the five or six document types that make up most of your volume.
Get a taxonomy review from your own inbox sample
Send an anonymised week of document filenames and types and we will suggest what to automate first. Optional follow-up.
Optional. The tool and every export work without this. No spam.
How to use the worksheet
Pull a week of documents from your shared inbox, scanner folder and portals, and group them by type. Add a row for each, noting the channel, the key fields you need, and the ERP object that should receive the data. Choose an extraction method per type, then estimate the share that will need review and the minutes per review. The computed review hours show where the human workload will sit, so you can decide which types to automate first and which to leave manual.
- Automate by volume and rule clarity, not by document importance
- Keep a catch-all type for unknown documents so nothing disappears
- Version the list as you add types
Designing the taxonomy
Keep it flat and operational. A taxonomy of two levels, category and type, is easier to maintain than a deep tree. Name types by what the business does with them, such as supplier invoice or goods receipt support, not by file format. Each type needs one owner, one destination and a defined fallback when classification is uncertain. Overlapping types such as invoice and credit note should be separate because the posting logic differs, even if the layouts look alike.
Sequencing the rollout
Start with high-volume, structured types where errors are cheap to fix. Add certificates and quality records afterward, with higher review rates and stricter confidence bars. Leave rare, complex documents manual until you have the volume to justify tuning. After go live, track classification accuracy separately from extraction accuracy, since a misclassified document fails before any field is read.
- Measure misrouted documents per week
- Review the unknown bucket monthly for new types
- Retire types that no longer arrive
Frequently Asked Questions
How many document types should I start with?
Five to ten, covering most of your volume. A long tail of rare types adds tuning effort for little saving. Add types when the unknown bucket shows enough volume to pay for them.
What is the difference between classification and extraction?
Classification decides what kind of document it is and where it goes. Extraction reads the fields from it. Both can fail separately, so measure them separately and route low-confidence results to review.
Do I need retention periods in the taxonomy?
It is useful, because the document type usually determines how long you must keep the record. Confirm the periods with your records policy, tax rules and customer contracts, since they differ by country and industry.
Can an LLM replace a taxonomy?
An LLM can classify and extract flexibly, but you still need the taxonomy to define the destinations, owners and rules. The model reads the document; the taxonomy tells the business what to do with it.
If you want an inbox classifier that routes each document type to the right ERP workflow on your own servers, we can design the taxonomy with you and run it privately, with a person confirming anything uncertain.
Related Tools
Email Inbox Automation Checklist
A 30-item checklist to prepare a shared invoice, order or certificate inbox for automated capture without losing documents or control.
AI Agents & AutomationInvoice OCR Field Mapping Worksheet
Map every invoice field your OCR extracts to its ERP target, set a minimum confidence per field and see which fields fall short of the bar.
Quality & InspectionCertificate of Conformance Extraction Field Template
Generate a JSON extraction schema for supplier certificates of conformance, with required fields and the confidence bar before auto-acceptance.
AI Agents & AutomationOCR Human Review Staffing Calculator
Estimate reviewer hours and full-time staff needed for the share of documents that fall out of straight-through processing.
More AI Agents & Automation tools
See all- Business Process Automation ROI Calculator
- AI Agent Use Case Prioritizer
- Document Processing Automation Savings Calculator
- AP Invoice Automation ROI Calculator
- Order Entry Automation Savings Calculator
- Quote-to-Cash Cycle Time Calculator
- Manufacturing AI Readiness Assessment
- RPA vs AI Agent Selector
- ERP AI Maturity Assessment
Keep exploring
Free tools
- Knowledge Base AI Readiness ChecklistA practical checklist covering content quality, metadata and taxonomy, access governance, technical readiness, and ownership before you connect a knowledge base to an AI assistant.
- ERP AI Data Source Inventory WorksheetAn editable inventory of ERP tables, file shares and document stores with classification and an AI-allowed decision per source.
- Email Inbox Automation ChecklistA 30-item checklist to prepare a shared invoice, order or certificate inbox for automated capture without losing documents or control.
ERP fixes and how-tos
- Infor LN integration document types and integration rules with IONHow integration document types and rules work in Infor LN with ION and BODs: what they define, how mapping is set up, and where to debug.
- Infor LN Document Central: Attachments and Document ManagementWhat Document Central and Infor Document Management do for Infor LN, how attachments are stored and configured, and what an admin should check first.
- Material Classification Report in SAP PP (CL30N, Tables and Queries)Report on material classification in SAP PP with CL30N, CL20N and the KLAH, KSSK, INOB and AUSP tables, plus SQVI and SQ01 query examples for planners.
Guides
- Infor Document Management: Setup and ConfigurationConfigure Infor Document Management (IDM) for CloudSuite. Document types, workflows, retention policies, and integration with ERP transactions.
- How to Set Up Document Control in SyteLineGuide to implementing document control in Infor SyteLine. Configure document types, revision management, approval workflows, and distribution control for ISO 9001 and AS9100 compliance.
- SyteLine Cycle Counting Configuration and Setup GuideSet up cycle counting in Infor SyteLine with ABC classification, count scheduling, variance thresholds, and approval workflows for inventory accuracy.
AI on your ERP
- Building a Document Routing Agent for Dynamics 365: Classify, Match, Attach and RouteBuild a document routing agent for Dynamics 365: classify inbound documents, match them to ERP records, attach and route them for review, privately if needed.
- AI for SyteLine Quality: Nonconformance Reports and Inspection DataAI for Infor SyteLine quality: analyse NCR trends, inspection results and supplier defects, draft dispositions for review, and keep quality data private on-prem.
Integrations
- How to add document OCR to KatanaCapture supplier invoices, packing slips, customer POs and certificates into Katana with OCR, confidence thresholds and human review via the REST API.
- How to automate email processing in Oracle NetSuiteAutomate inbound email in Oracle NetSuite: turn POs, RFQs, invoices and confirmations from shared inboxes into reviewed transactions using email capture and REST.