How to add document OCR to Katana
Short answer
Katana does not read documents itself, so OCR runs beside it. Extract fields from supplier invoices, packing slips and customer POs, match them to Katana records, and write receipts or orders through the REST API after review.
Small manufacturers using Katana still receive paper and PDFs: a supplier packing slip that has to be checked against a purchase order, a vendor invoice that goes to the accounting tool, a customer PO that has to become a sales order, a certificate that must be kept with a batch.
Receiving is where the cost is highest. Someone reads a slip, finds the PO in Katana, and enters the received quantities line by line. Mistakes here distort inventory and later production.
OCR with sensible matching and review turns those slips into pre-filled receipts that a person confirms.
What teams use it for
Packing slip to PO receipt
Read the supplier slip, match lines to the open PO, and prepare the receiving quantities for confirmation.
Customer PO to sales order draft
Extract customer, items and dates from a PDF order and draft a Katana sales order.
Certificates attached to batches
Read material certificates, capture the batch or lot number, and store the file against the matching batch record.
Invoice data for three-way check
Extract invoice totals and compare with the PO and receipt before handing to the accounting tool.
Delivery note archive
Index scanned delivery notes by PO number so they can be found later without filenames.
Katana integration surface
- Katana REST API for purchase orders and their rows, including receiving of purchase order rows; check current endpoints for the exact receive operation.
- Batch and serial tracking features on the product side, where lot numbers captured by OCR can be stored (plan and settings dependent).
- Sales order create endpoints for customer PO capture.
- File attachment handling in the API is limited, so plan to keep originals in your own storage and reference them in notes.
- QuickBooks and Xero sync for accounting, which means invoice posting usually stays outside Katana.
How it works
- 1
Define document types
Pick two or three to start, for example packing slips and customer POs, and gather a sample set of real documents.
- 2
Choose the OCR and extraction engine
Layout-aware OCR plus a language or vision model for field extraction; open-weight options exist if documents must stay private.
- 3
Match to Katana records
Use PO number, supplier and SKU lookups against the API, with fuzzy matching and a cross-reference for supplier part numbers.
- 4
Score confidence per field
High scores pass through; anything below a threshold is highlighted on the original image for a person.
- 5
Review screen
Show the document side by side with the proposed receipt or order, allow edits, and require a click to confirm.
- 6
Write and archive
Call the Katana API to receive or create, store the original file in your document store, and keep an audit trail.
Example flows
Receiving goods against a PO
Trigger: A photo of a packing slip is uploaded by the receiver.
- OCR extracts the PO number and line quantities.
- The open PO is fetched from Katana and lines are matched.
- A variance, 95 received against 100 ordered, is highlighted.
- The receiver confirms; the receipt is posted.
Result: Inventory updates the same day with the discrepancy visible.
Material certificate capture
Trigger: A certificate PDF arrives with a shipment.
- The heat or lot number and material are extracted.
- The matching received batch is located.
- The file is stored and linked in the batch notes.
Result: Traceability documents are findable by lot.
Keeping data on-prem
Because Katana is cloud only, only the structured outcome goes to it. Run OCR and extraction on your own hardware: document layout and text recognition models run on a single modest GPU, and an open-weight vision language model can handle messy slips locally. Keep the original scans and certificates in your file share or private object storage, and send Katana only the PO number, quantities and batch ids. This matters for customers whose drawings and certificates are under contractual confidentiality.
Security checklist
- Store originals in your own access-controlled storage.
- Do not put full document text into Katana notes.
- Log who confirmed each extracted record.
- Scan uploads for malware before processing.
Ways to get it done
Off-the-shelf OCR service with Zapier or Make
Effort: Days.
Consistent invoice formats and low volume.
In-house pipeline with open OCR and a vision model
Effort: Four to eight weeks to tune.
Mixed supplier formats and in-house developers.
Partner build with Netray
Effort: Several weeks, based on document types.
Private deployment, review UI, and supplier-specific matching.
Pitfalls
- !Packing slips often omit your PO number; fall back to supplier and date matching.
- !Units of measure differ between slip and Katana, such as each versus box.
- !Table extraction fails on skewed phone photos; add image correction first.
- !Partial deliveries must receive only what arrived, not the whole PO.
Frequently asked questions
Does Katana include OCR?
Not to our knowledge. Katana manages inventory, orders and production but does not read documents. You add OCR as a separate step and push the verified result into Katana through the REST API.
Can documents be attached to Katana records?
Attachment support in the API is limited and has changed over time, so check current documentation. A safer pattern is to keep originals in your own storage and add a link or reference number in the record notes.
What accuracy should we expect?
Digital PDFs from repeat suppliers can be very accurate. Phone photos, handwriting and unusual layouts are lower. Test on a few hundred of your own documents and use confidence thresholds so uncertain fields always get checked.
Can it read supplier invoices for accounting?
Yes technically, but Katana usually syncs to QuickBooks or Xero for accounting, so many teams send invoice data there. Use OCR in Katana for receiving and ordering, and match invoices to receipts as a check.
Is private OCR realistic for a small shop?
Yes. A single workstation GPU can run OCR and a modest open-weight model for a small document volume. If volume is tiny, a managed service with a data processing agreement may be cheaper and simpler.
Want Document OCR working on your Katana?
A free 30 minute assessment: we map the integration path for your version and setup, and where it should run.
Get a free assessmentTry it here, free
Katana MRP API Request Builder for Orders and Inventory
Build Katana Open API GET requests for sales orders, manufacturing orders, products and inventory, as curl commands or a Python snippet.
Keep exploring
Free tools
- Katana MRP API Request Builder for Orders and InventoryBuild Katana Open API GET requests for sales orders, manufacturing orders, products and inventory, as curl commands or a Python snippet.
- MRPeasy vs Katana Selection ScorecardA 10-question fit test that scores how much planning depth and shop floor control your operation needs, to compare MRPeasy and Katana style cloud MRPs.
- OCR Human Review Queue Staffing CalculatorSize the number of reviewers needed for a document capture exception queue, including peak days and the impact of the confidence threshold.
ERP fixes and how-tos
- Katana MRP Integrations and the MRPeasy REST APIKatana MRP integrations and the MRPeasy REST API: what the Shopify, accounting and marketplace connectors sync, where the API fits and how to avoid sync gaps.
- Katana Manufacturing Order Ingredients Not Available: How to ResolveWhy a Katana manufacturing order shows ingredients as not available or expected, how stock allocation works, and how to resolve the shortage with POs or adjustments.
- How to Receive a PO in Epicor and Run the 3-Way MatchReceive purchase orders in Epicor Kinetic with Receipt Entry, understand the three-way match between PO, receipt and AP invoice, and see where Fulfillment Workbench fits.
Runs with your ERP
- Affinda and Infor LN: AI document capture for invoices and ordersHow Affinda AI document extraction fits Infor LN invoice and order capture, what data flows, what breaks, and where a private on-prem AI layer helps.
- DocBits and Infor LN: supplier invoice capture and matchingHow DocBits captures supplier invoices, matches them to Infor LN POs and receipts and hands them to LN, with integration notes, setup and pitfalls.
- AI Invoice Management and SAP S/4HANA Cloud: OCR capture and AP processingHow the AI Invoice Management SAP Store app captures invoice data with OCR and imports it into S/4HANA Cloud, plus setup steps, pitfalls and alternatives.
Guides
- AI-Powered Document Processing for ERP SystemsAutomate invoice, PO, and packing slip processing into ERP with AI document extraction. Covers OCR, layout analysis, validation rules, and ERP posting.
- Building an AI Document Processing Pipeline: OCR to ValidationHow to build an AI document processing pipeline: OCR quality, LLM extraction, schema validation, and the human review layer that catches what slips through.
AI on your ERP
- AI for Katana Cloud ManufacturingAdd private AI on top of Katana: natural-language answers across Katana, Shopify, and QuickBooks Online, plus agents for reorder points and channel demand, without a public model reading your data.
- AI Invoice Reader for SAP: From PDF to a Checked MIRO DraftHow an AI invoice reader for SAP works: SAP Document AI, OpenText VIM and private models compared, from extraction to MIRO drafts and blocked invoices.
Integrations
- How to add document OCR to Infor SyteLineCapture vendor invoices, packing slips and certificates of conformance into Infor SyteLine with OCR, confidence thresholds, PO matching and a human review queue.
- How to add document OCR to IFS CloudCapture supplier invoices, packing slips and certificates into IFS Cloud with OCR and AI extraction, confidence thresholds and review before posting.
Software
- KatanaKatana is a cloud inventory and manufacturing system for small product makers. See its modules, integrations, limits and alternatives before you choose.
- MRPeasyMRPeasy is a cloud MRP and ERP system for small manufacturers. See its modules, integrations, limitations and alternatives for shortlisting.