Epicor DMT Import Template Worksheet for Part and BOM Data
Data migration fails more often on sequencing and cleansing than on the DMT tool itself. This worksheet helps you stage part and BOM rows in one place, order the loads, and catch missing parents before anything touches the database.
| Record type | Company | PartNum | PartDescription | TypeCode | IUM | Parent part (BOM) | Revision (BOM) | Material seq (BOM) | Qty per (BOM) | Load order | |
|---|---|---|---|---|---|---|---|---|---|---|---|
Use this as a planning and cleansing sheet. The exact column headers DMT expects depend on the DMT template you select and your Kinetic version, so map these columns to the headers in the DMT upload screen before loading. Load parts before BOMs, test in a pilot company, and keep the source file for audit.
Migration data check
Want a second pair of eyes on your cleansed part and BOM file before the load? Request an optional review.
Optional. The tool and every export work without this. No spam.
How to use the worksheet
Add one row per part and one per BOM component. Set the load order so that parts are loaded first, then BOM components that reference them. Export to Excel or CSV, then copy the columns into the DMT template you select in the Data Migration Tool and map headers. Always do a trial in a pilot company before production.
- Load order 1: part master records
- Load order 2: BOM material lines
- Check that every BOM component exists as a part first
- Keep unit of measure consistent between part and BOM
Sequencing and dependencies
A BOM line references a parent part and a component part. If either is not on file yet, the row errors. Revisions add another dependency: the parent revision must exist before material lines are attached. Plan the order on paper first. A short dry run on a few assemblies reveals most structural issues quickly.
Cleansing before load
Standardize part numbers, remove trailing spaces, fix unit of measure inconsistencies and resolve duplicates before loading. Decide whether obsolete parts migrate at all. Loading dirty data is easy, but cleaning it afterward in a live system is slow and risky, and costing may be affected by wrong types or units.
Common mistakes
Loading BOMs before parts, using different units for the same part, forgetting company on multi-company loads, and testing only in production. Another common one is trusting a column mapping from a previous version after an upgrade. Always compare headers again.
Frequently Asked Questions
What is Epicor DMT?
The Data Migration Tool, or DMT, is Epicor's utility for loading and updating data in bulk from CSV or Excel files. It supports many record types including parts, BOMs, customers and open orders. Each load type expects specific column headers.
Should I load parts or BOMs first?
Parts first. BOM material lines refer to parent and component parts, so the part master must exist. Load revisions next if you use them, then material lines, and then operations and any engineering data your process needs.
Can I update existing parts with DMT?
Yes, DMT can add new records and update existing ones depending on the options you choose. Test the update behavior on a pilot company, because an update with blank cells may behave differently from what you expect.
How do I check the load worked?
Review the DMT log, then reconcile counts against your source file and spot check a sample of parts and BOMs in the Part and Engineering Workbench screens. Run a BOM explosion on a few top-level assemblies to confirm structure.
If your migration includes thousands of parts and BOMs, we can help build validation checks that run before the DMT load.
Related Tools
Epicor Kinetic Upgrade Checklist
A phase-by-phase upgrade checklist covering inventory, testing, integrations, cutover and rollback for Epicor Kinetic.
EpicorEpicor MRP Run Checklist
A practical checklist for planners running Epicor MRP, with critical checks on part data, lead times, firm jobs and the review of suggestions.
EpicorEpicor BAQ Query Template Generator
Fill in company, days back and status filters to get a starter SQL for an open jobs BAQ, plus a design checklist for the Query Builder.
EpicorEpicor Security Group Design Worksheet
An editable worksheet to plan security groups by role and score each for exposure, so over-broad access is visible before audit.
More Epicor tools
See all- Epicor Kinetic Job Status Reference
- Epicor BPM Directive Design Template
- Epicor REST API v2 URL Builder
- Epicor Safety Stock and Reorder Point Calculator
- Epicor EOQ and Lot Sizing Calculator
- Epicor Resource Group Burden Rate Calculator
- Epicor Shop Floor OEE Calculator
- Epicor Job Cost Variance Worksheet
- Epicor Shop Floor Labor Reporting SOP Template
New to Epicor ERP? Start with the Epicor ERP guide and toolkit, or plan with Training Path Builder, ERP Certification Study Planner, Upgrade Path Planner.
Keep exploring
Free tools
- Epicor DMT Data Load Plan WorksheetSequence your Epicor Data Management Tool loads with record counts, rates and estimated run time, then export the plan to Excel.
- Epicor DMT Data Load ChecklistChecklist for planning and running Epicor DMT loads: prerequisites, load order, BPM impact, validation and rollback.
- Epicor DMT Data Load Time CalculatorPlan DMT load windows by combining record counts, throughput, error rates and fix time into total hours.
ERP fixes and how-tos
- How to import data with Epicor DMT (Data Migration Tool)Step by step guide to Epicor Data Migration Tool (DMT): generating templates, mapping fields, preprocessing steps, running imports, and reading the error log for failed rows.
- Epicor Kinetic Costing Workbench: Part Cost, Rollup and Material BurdenHow Epicor Kinetic part cost works: the Costing Workbench, cost rollup for standard cost, material burden, and a practical cost review routine.
- Shortage, Scrap, WIP, BOM, GL and Sales Reports in Epicor KineticWhere to find the Epicor Kinetic shortage, scrap, WIP, BOM, general ledger and sales reports, and how to build each one as a BAQ when the standard report falls short.
AI on your ERP
- Getting Epicor Kinetic Data Ready for AI: Part Master, BAQs, UD Fields and Job DataHow to get Epicor Kinetic and ERP 10 data ready for AI: part master, revisions, UD fields, BAQs as definitions, labor and job data quality, security groups.
- Private AI for Epicor Kinetic Cloud, Outside the Multi-Tenant BoundaryRun a private LLM on Epicor Kinetic private cloud or Kinetic Cloud data via BAQs, REST v2 and Data Fabric, keeping sensitive manufacturing data off shared AI.
Integrations
- How to add AI agents to Epicor KineticHow to add AI agents to Epicor Kinetic: a tool layer over the REST v2 API and BAQs, MRP exception triage, PO expediting, and human approval before any write.
- How to add an AI chatbot to Epicor KineticAdd an AI chatbot to Epicor Kinetic: an internal assistant for planners and buyers or a customer portal bot, grounded in BAQs and runnable fully on-prem.