Epicor ERP 10 AI Assistant Sizing and Value Calculator
This calculator sizes a private AI assistant for Epicor ERP 10 on-prem. It estimates peak GPU need, index size, time saved and payback, using assumptions you can change.
Your numbers
Users licensed to use the assistant.
Share of named users who ask at least one question on a given day.
Pilot logs give the real figure; 5 to 15 is common once habit forms.
Question, retrieved BAQ rows and document chunks, plus the answer. Smaller models with shorter context keep this near 3,000.
Job packets, drawings, certs and SOPs on the shares Epicor references.
Average across the document set.
Time saved versus asking a planner or running a BAQ yourself.
Salary plus benefits and overhead for the people asking.
Hardware amortised over 36 months plus power, cooling, support and rack space.
Aggregate tokens per second under batching for your model and quantisation. Measure it; this is the most sensitive assumption.
Integration, document pipeline, security review and pilot.
Your results
Planning estimate only. Tokens per second, time saved per question and peak share vary widely; replace the defaults with measurements from your own pilot before committing to hardware.
Simple payback vs minutes saved per question
Sweeps Minutes saved per question from 1 to 15, holding your other inputs fixed.
Epicor ERP 10 sizing review
Optional: send your numbers and get an engineer's second opinion on GPU count, index size and the value assumptions.
Optional. The tool and every export work without this. No spam.
How to use it
Enter named users, the share active on a typical day and questions per active user. Set tokens per question to include retrieved BAQ rows and document chunks. Enter your one-time implementation cost to see payback, and the sweep shows how sensitive payback is to the minutes saved per question.
- Smaller plants often fit on one 24 GB GPU
- Do not count licence holders who rarely log in as active
- Include integration and security review in one-time cost
- Compare against simply building more BAQs
The method
Peak load is modelled as 25 percent of daily questions in the busiest hour, converted to tokens per second and divided by GPU throughput. Concurrency assumes each request occupies a slot for about 15 seconds. Index size multiplies documents, pages, chunks per page and a float32 embedding with overhead. Value is hours saved over 21 working days times loaded cost.
Reading the sweep
The payback line falls sharply as minutes saved rise, then flattens. If payback is long at your realistic minutes-saved figure, the case may rest on fewer errors or faster quotes rather than time alone. A value near GPU cost means a smaller model or shared hardware may be the better choice.
Common mistakes
The usual mistakes are applying the busiest-hour throughput from a benchmark to mixed real prompts, ignoring retrieval context in tokens, and treating ERP 10 as static. If an upgrade is coming, keep hardware reusable and BAQ names stable.
Frequently Asked Questions
Is one GPU enough for an ERP 10 plant?
Often yes for 50 to 250 named users with a 7B to 14B model, because peak concurrency is low. Confirm with measured throughput and your busiest-hour question volume before buying.
Why is payback zero in some cases?
Payback shows zero when monthly value does not exceed monthly GPU cost, because the project would not recover its one-time cost. Increase realistic minutes saved or reduce cost, for example with a smaller model or shared hardware.
Does the calculator include licensing?
No. Open-weight models have no per-user licence, but your own server, database and operating system licences are outside this estimate. Add them to one-time or monthly cost if they apply.
How should I estimate minutes saved?
Time a handful of real questions the old way: finding a job status or shortage across screens and BAQs. Use the average of those timings, then discount for questions where the assistant is wrong or incomplete.
If you want the numbers checked against your ERP 10 usage, Netray can review them with you. The calculator needs no contact.
Related Tools
Epicor ERP 10 Private AI Layer Blueprint Generator
Generate a private AI architecture plan for Epicor ERP 10 on-prem, covering REST and BAQ access, replica, retrieval, local model serving, security and rollout.
On-Prem AIGPU Sizing Calculator for LLM Inference
Work out how many GPUs you need to serve a given open-weight model to your user base, based on memory footprint and token throughput.
On-Prem AIRAG Infrastructure Sizing Calculator
Estimate vector storage, node RAM, generation GPUs, and monthly infrastructure cost for a retrieval-augmented generation deployment over your document corpus.
On-Prem AIPrivate AI Total Cost of Ownership Calculator
Model the full 3-year cost of an on-prem AI deployment, including amortized hardware, power, staff time, and support, against comparable API spend.
More Epicor tools
See all- Epicor Kinetic Job Status Reference
- Epicor BAQ Query Template Generator
- Epicor BPM Directive Design Template
- Epicor DMT Import Template Worksheet (Part and BOM)
- Epicor MRP Run Checklist
- Epicor Kinetic Upgrade Checklist
- Epicor REST API v2 URL Builder
- Epicor Security Group Design Worksheet
- Epicor Kinetic Customization Change Request Form Template
New to Epicor ERP? Start with the Epicor ERP guide and toolkit, or plan with Training Path Builder, ERP Certification Study Planner, Upgrade Path Planner.
Keep exploring
Free tools
- Epicor Kinetic AI Assistant Sizing and Value CalculatorEstimate GPUs, vector index size, hours saved and payback for a private AI assistant on Epicor Kinetic on-premises.
- Epicor 9 and Vantage AI Assistant Sizing and Value CalculatorEstimate GPUs, index size, hours saved and payback for a private AI assistant over a legacy Epicor 9 or Vantage system.
- Epicor Eclipse AI Assistant Sizing and Value CalculatorEstimate GPUs, index size, hours saved and payback for a private AI assistant over Epicor Eclipse extract data.
ERP fixes and how-tos
- Epicor ERP 10 AI Integration Without Cloud: Private ArchitectureAdd a private AI assistant to Epicor ERP 10 on-prem: REST and BAQ access, SQL replica, Service Connect, local LLM, role mirroring, audit and phased rollout.
- How to Add AI to Epicor Kinetic On-Premises Without Moving Your DataReference architecture for a private AI assistant on Epicor Kinetic on-premises: BAQ and REST v2 access, SQL replica, local LLM, roles, audit and rollout.
- Why Is Epicor So Slow? A Kinetic Performance ChecklistDiagnose slow Epicor Kinetic: separate client, app server, SQL Server, BAQ and network causes, with a step-by-step checklist and ways to tell slow from down.