Inventory Write-Off Approval Form Template
Writing off inventory is a financial and control event: it reduces profit, removes stock records and, if done carelessly, hides shrink or fraud. A signed form that records what was written off, why and who approved it is the simplest control, and this template gives you one.
Fill in
Inventory Write-Off Approval Form Template
Inventory Write-Off Request
Company: Acme Precision Ltd Form number: IWO-2026-087 Date: 2026-10-20 Site: Plant 1, Main stores
Reason
Obsolete or no demand
Parts for a discontinued product family. No demand for 24 months and no open orders. Engineering confirms no alternate use.
Items
| Part number | Description | Qty | Unit cost | Extended value | Lot / location |
|---|---|---|---|---|---|
Financial summary
| Item | Amount |
|---|---|
| Total write-off value | 38,420 |
| Expected recovery | 2,100 scrap value |
| Expense account | 5900 Inventory write-offs |
Disposal
Method: Scrap for metal value Disposal witnessed by: ______________________
Checks before write-off
Confirmed no open demand or alternate use. Checked for customer-owned or consigned material. Hazardous or controlled items handled per procedure. ERP adjustment reference to be recorded after posting.
Approvals
Set approval limits by value in your own policy. For controlled, export-restricted or customer-owned items, follow the specific disposal rules that apply. This form is a documentation starting point, not accounting or tax advice.
Find obsolete stock candidates
Optional: a quick look at flagging no-demand items from ERP usage data.
Optional. The tool and every export work without this. No spam.
How to use the form
Enter the reason, explanation and the total value in the fields, then list each part, quantity and cost in the items table. Print or export to PDF, add the engineering, inventory and finance signatures, and attach any supporting count sheet or inspection report. Record the ERP inventory adjustment or scrap transaction reference once posted. Keep the form with the month end close file for audit.
Why the evidence matters
Auditors test write-offs because they affect earnings and can mask theft or poor cost control. Strong support shows the stock was real, unusable or unsellable, and that the value is correct. Typical evidence includes demand history, engineering confirmation of no alternate use, quality rejection records and photos for damage. Separate the reasons so you can see trends: handling damage points to warehouse practice, cycle count losses to process control, obsolescence to forecasting and engineering change management.
- Confirm no open orders or alternate use.
- Check consigned and customer-owned stock.
- Record disposal method and witness.
- Post to a dedicated write-off account.
Reserve versus write-off
Many companies carry an excess and obsolete reserve and charge write-offs against it rather than to expense, so the profit hit is taken earlier through the reserve. If you do this, the account on the form should be the reserve and the expense is recognised when the reserve is built. Make sure the reserve review and the write-off form use the same criteria for obsolete stock, otherwise they drift apart.
Common mistakes
Frequent failures include writing off without checking open orders, scrapping material that could be returned to the supplier for credit, ignoring salvage value, and letting the ERP adjustment be posted before approval. Put the approval before the posting, and give the storeroom no ability to post large adjustments on its own. Review the log monthly for patterns.
Frequently Asked Questions
When should inventory be written off?
When it is unusable, unsellable or lost, or when its net realisable value falls below cost and no recovery is expected. Common triggers are obsolescence, damage, expiry, quality rejection and count variance. Document the reason and approvals each time.
Who should approve an inventory write-off?
Usually the inventory manager, engineering or quality for technical judgment, the plant manager and finance. Higher values need higher authority, set in your policy. The person who handles the stock should not be the only approver.
What is the difference between a reserve and a write-off?
A reserve is an estimate of expected losses recorded before the stock is actually scrapped. A write-off removes specific items from the books. Write-offs are often charged against the reserve, so the expense was already recognised.
Can scrapped inventory have a recovery value?
Yes. Metal scrap, supplier returns and surplus sales can recover part of the cost. Record the expected recovery on the form and post the proceeds when received, rather than ignoring them.
If you want slow-moving and obsolete stock flagged from ERP demand and usage history, Netray can discuss automating the candidate list that feeds this form.
Related Tools
GRNI Accrual Schedule Worksheet
Schedule goods received but not invoiced, value each line and support the month end GRNI accrual with an auditable listing.
Costing & FinanceStandard Cost Change Approval Memo Template
Record why standard costs are changing, what the inventory revaluation effect is, and who approved the roll.
Costing & FinanceCapital Expenditure Request Form Template
A fill-in capital appropriation request form with justification, cost summary, financial return and approval lines.
Costing & FinanceOverhead Under and Over Absorption Calculator
Find under or over absorbed overhead for the period and see how much comes from spending versus volume.
More Costing & Finance tools
See all- SAP QM Inspection Effort and Cost Calculator
- SAP Standard Cost Estimate BOM Rollup Calculator
- Legacy ERP Retirement Cost and Payback Calculator
- JD Edwards World Month-End Close Procedure Template
- Distributor Customer Credit Application Template
- Distributor Customer Profitability Worksheet
- Distributor GMROI and Inventory Turns Calculator
- Vendor Early Pay Discount Worksheet
- SyteLine Cost Rollup Variance Calculator
Keep exploring
Free tools
- SyteLine Excess and Obsolete Inventory Review TemplateA review and approval form for documenting why an item is excess or obsolete and what you decided to do with it.
- Aerospace Shelf-Life Material Expiry Write-Off CalculatorShows how much shelf-life controlled material expires before use for a given order size, and the yearly write-off that follows.
- Estimate Review and Approval Form TemplateA one-page gate that records cost, margin, risks and approvals before a manufacturing quote is released.
ERP fixes and how-tos
- Oracle Fusion Inventory: Cycle Count Setup and Adjustment ApprovalSet up cycle counts in Oracle Fusion Inventory: count definitions, ABC classes, tolerances, approval of adjustments and where the accounting lands in costing.
- How to Promote Form Customizations from a Test Tenant to Production in CloudSuite IndustrialHow to move Mongoose form customizations, UDFs and event config from a test tenant to production in CloudSuite Industrial multi-tenant without losing changes.
Guides
- SyteLine Inventory Adjustment Workflows and ConfigurationConfigure inventory adjustment transactions in Infor SyteLine including reason codes, approval workflows, GL posting, and audit controls for corrections.
- How to Configure Inventory Adjustments in SyteLineStep-by-step guide to configuring inventory adjustments in Infor SyteLine CloudSuite Industrial, including adjustment reasons, approval workflows, and GL account mapping.
- How to Manage Inventory Aging in SyteLineStep-by-step guide to managing inventory aging in Infor SyteLine CloudSuite Industrial, including aging reports, obsolescence reserves, and disposition workflows.