Excel Manufacturing Production Template: Plan and Track Orders, Hours and Yield

Small manufacturers often start production planning in Excel. This worksheet gives you a clean layout: orders, work centers, due dates, planned and actual quantities, with hours, attainment and yield calculated for you. Edit the rows, then export to Excel to share or build on.

Free, optional. Reopen it on any device.
Download:
OrderPartWork centerStatusDue datePlanned qtyGood qtyScrap qtyStd rate (units per hour)Planned hoursAttainment %Yield %
16 hrs
65%
97.7%
30 hrs
0%
0%
10 hrs
98%
98%
16 hrs
43.8%
97.2%
8 hrs
0%
0%
Total planned qty
1,450
Total good qty
883
Total scrap qty
19
Total planned hours
80 hrs
Overall attainment
60.9%
Total good quantity divided by total planned quantity.
Overall yield
97.9%
Good units as a share of good plus scrap.
Scrap rate
2.1%
Orders on the sheet
5

Planned hours = planned quantity divided by the standard rate. Attainment compares good quantity with plan. Yield compares good with good plus scrap. Add a row per order and work center step if one order passes through several operations.

Get production status straight from your ERP

An optional walkthrough of answering late-order and yield questions from live ERP data, on-premises, without maintaining a separate spreadsheet.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the worksheet

Add one row per order and work center step. Enter the planned quantity and the standard production rate for that step in units per hour. As production runs, update good and scrap quantities and the status. The sheet calculates planned hours, attainment against plan and yield per row, plus totals and overall percentages. Sort by due date to find what is at risk, and filter by work center to see load.

  • One row per order and operation.
  • Update good and scrap quantities at least once per shift.
  • Use status to separate planned, active and finished work.
  • Export to Excel for weekly reviews or to add charts.

The three numbers it calculates

Planned hours show how much capacity an order needs: quantity divided by rate. Add them by work center and compare with available hours to see overload. Attainment is good quantity divided by planned quantity and tells you progress against the plan. Yield is good divided by good plus scrap and shows how much material and time turn into sellable output. A low yield with high attainment means you are hitting quantity by making scrap, which hides cost.

Growing beyond a spreadsheet

Spreadsheets work well for a handful of orders and one planner. They struggle when several people edit, when materials and BOMs drive the schedule, or when you need history. Signs you are outgrowing Excel include version conflicts, late orders discovered by phone call, no link between inventory and production, and hours spent re-keying shop floor data. At that point an MRP or ERP system, or a scheduling layer on top of your current ERP, pays for itself.

Common mistakes

Frequent problems are using optimistic standard rates, ignoring setup and changeover time, mixing units per hour with units per shift, and overwriting plan numbers so the original commitment is lost. Keep the original plan in the planned column and track changes elsewhere. Also check that the rate reflects the real bottleneck work center, not the fastest machine in the route.

Frequently Asked Questions

Can I use this as an Excel production template?

Yes. Edit the rows in the browser and export to Excel. The exported file keeps the columns and values, so you can continue in Excel, add your own charts or paste it into an existing workbook. It is free and needs no sign up.

How do I calculate production yield?

Yield equals good units divided by total units produced, which is good plus scrap, multiplied by 100. If you made 588 good parts and 12 scrap parts, yield is 98 percent. Track it per order and work center to find where losses occur.

What standard rate should I enter?

Use a rate based on time studies or recent actual runs, not the machine's rated speed. Include normal minor stoppages. If setup is significant, add it as a separate row or reduce the effective rate for short runs so planned hours are realistic.

How is this different from a production schedule?

This worksheet tracks quantity, hours and yield by order. A production schedule sequences orders across machines and days. Use this to measure progress, and pair it with a schedule or master production schedule when you need to commit dates.

If your production data already lives in an ERP, Netray can add a private AI layer that answers questions like which orders are late and why, on your own servers, without a separate spreadsheet.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

Guides

AI on your ERP

Software