AI Agents & AutomationFree calculatorPDF, Excel, Word exportManufacturing

Extraction Precision, Recall and F1 Calculator

Accuracy alone hides the trade-off in document extraction between returning wrong values and failing to return values. Precision, recall and F1 separate the two so that you can tune a model or threshold with intent.

Your numbers

fields

Fields the model extracted with the right value.

fields

Fields the model extracted with a wrong value, or extracted where none exists.

fields

Fields present in the document that the model did not return.

$

Rework, payment error or scrap cost when a wrong value is accepted.

$

Manual keying cost when a field is absent.

Your results

Precision
96.4%
Of the values returned, the share that are right.
Recall
97.4%
Of the values that exist, the share the model found.
F1 score
96.9%
Miss rate
2.6%
Wrong share of returned values
3.6%
Cost exposure for this sample
$680
Assumes no human review catches the wrong values.

Count results from a labeled sample of your own documents. Define a match rule (exact, normalized) before scoring.

Free, optional. Reopen it on any device.
Save results:

Precision, recall and F1 vs wrong extractions

Sweeps Wrong extractions (false positives) from 0 to 300, holding your other inputs fixed.

Extraction evaluation help

Optional: discuss building an evaluation harness for your documents.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the calculator

Take a labeled sample, such as 100 invoices or certificates with the correct values entered by hand. Count fields the model got right, fields it returned wrong and fields it missed. Enter the counts, and add the cost of an undetected wrong value and of a missed field to see financial exposure for the sample. The chart sweeps the wrong-extraction count so that you can see the effect on precision and F1.

  • Fix the match rule first: exact match or normalized (dates, currency, whitespace).
  • Score per field type, because invoice totals and descriptions behave differently.
  • Use a sample that includes your worst suppliers and scan quality.

The definitions

Precision is true positives divided by true positives plus false positives. Recall is true positives divided by true positives plus false negatives. F1 is their harmonic mean, which simplifies to twice true positives over twice true positives plus false positives plus false negatives. A miss is cheap in a system where people fill gaps; a wrong value is costly where nobody checks it. That is why cost weights matter more than a single score.

How to read the result

High recall with low precision means the model returns values for almost everything but some are wrong, which is dangerous without review. High precision with low recall means it is cautious and leaves work to people. A confidence threshold moves a model along this trade-off: raising it improves precision and lowers recall. Choose the point from the cost of each error type, not from the F1 alone.

Common mistakes

Scoring on a sample that is too clean gives optimistic results. Counting a field returned with the wrong value only as a false positive is a convention, and some teams also count it as a miss, so state your rule. Finally, a single overall F1 hides the fields that matter: report the critical fields separately.

Frequently Asked Questions

What is the difference between precision and recall?

Precision asks how many returned values are right. Recall asks how many of the existing values were found. A model can be strong on one and weak on the other, which is why both are reported.

When should I use F1?

Use F1 as a single comparison number when false positives and false negatives matter roughly equally. When their costs differ greatly, use the cost exposure or weight the metrics accordingly.

How big should the evaluation sample be?

Large enough to cover the main suppliers, layouts and scan qualities, and to give a stable count for each field you care about. A few hundred documents is common, but rare fields may need targeted sampling.

How does the confidence threshold relate to these metrics?

Raising the threshold removes low-confidence values, which usually increases precision and reduces recall. Plot both against several thresholds on your sample and pick the point that fits your review capacity.

If you need an evaluation harness that scores an extraction model against your labeled documents on-prem, Netray can build one with you.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

Guides

AI on your ERP

Manufacturing hubs

Integrations

Troubleshooting