Freight TMSInfor M3 (with Infor Nexus)Runs on-prem

Infor Nexus Network TMS with QAD Precision parcel for Infor ERPs

Infor Nexus Network TMS is a global transportation management product on the Infor Nexus network, and Infor added multi-carrier parcel execution to it through QAD Precision. It is used alongside Infor ERPs such as M3. The public announcement describes the capability, not the ERP-level integration, so treat M3 specifics as a project to confirm.

How Infor Nexus Network TMS with QAD Precision parcel connects to Infor M3 (with Infor Nexus)

Multi-carrier parcel execution embedded in Infor Nexus

Parcel rating, labels and carrier execution are part of the Nexus TMS through QAD Precision rather than a separate add-on. Infor's announcement does not document the ERP connection, so confirm how shipments and orders flow from your ERP with Infor.

Order and shipment exchange with the ERP

In general a TMS needs delivery or shipment data from the ERP and returns carrier, cost and tracking. For M3 this commonly means ION-based or API-based exchange, but this is a general pattern, not a documented M3 specification.

What data moves

FromToDataWhen
Infor ERP (for example M3)Infor Nexus TMSShipment or delivery requestsDelivery released
Infor Nexus TMSCarrierRate, booking and parcel label requestCarrier selected
Infor Nexus TMSInfor ERPCarrier, tracking and freight costShipment executed
CarrierInfor Nexus TMSTracking eventsCarrier status update

Setting it up

  1. 1Define freight scopeIdentify whether you need parcel, truckload, ocean or air, as the TMS is wider than parcel shipping.
  2. 2Confirm ERP integration routeAsk Infor how your ERP connects to Nexus TMS and who delivers it.
  3. 3Prepare ERP shipping dataEnsure addresses, weights, dimensions and incoterms are accurate in the ERP.
  4. 4Load carriers and contractsConfigure carrier accounts, rate agreements and service levels.
  5. 5Define routing rulesSet rules for mode and carrier selection by lane, weight and service.
  6. 6Pilot with one lane or siteCompare freight cost and tracking against current practice before wider rollout.

What usually breaks

  • !Buying a global TMS when parcel shipping software would meet the need.
  • !Item master data with no weight or dimensions, causing poor rating.
  • !Carrier contracts not loaded correctly, so quoted rates differ from invoices.
  • !Tracking events not linked back to ERP orders for customer service.
  • !Assuming ERP integration is included without a written scope.
  • !Cloud network dependency not reviewed against site data policies.

A private AI layer across both systems

Freight cost analysis

A private assistant reading TMS shipments and ERP orders can explain where freight cost rose, by lane and carrier, read-only.

Late shipment triage

Combine tracking events with ERP promised dates to list orders likely to miss, with a draft customer message for approval.

Master data gap detection

List items and addresses likely to cause rating failures before they ship.

Plain-language shipment questions

Let customer service ask where an order is and get one answer from both systems.

Try it here, free

Multistate Sales Tax Nexus Tracking Worksheet

Open full tool

Track sales and transaction counts by state against your economic nexus thresholds, and see which states are close to triggering registration.

When something else fits better

  • Multi-carrier parcel software such as ProcessWeaver if your need is parcel labels and manifests.
  • ERP-native shipping features with carrier integrations for simple distribution.
  • A TMS from another vendor if you do not use the Infor Nexus network.

Frequently asked questions

Is Nexus TMS the same as a parcel tool?

No. Infor Nexus Network TMS is a broader transportation management product on the Nexus network. Parcel execution through QAD Precision was added to it, so it covers parcel inside a wider freight scope.

Does it work with M3?

Infor positions it for use with its ERPs, but the announcement does not describe the M3 connection. Ask Infor for the integration design and responsibilities for your M3 version before planning.

Can I use it with on-premises M3?

Nexus is a cloud network, so on-premises M3 would exchange shipment data with it across your boundary. Check the network path and data handling with your security team.

What does QAD Precision add?

Infor says it adds multi-carrier parcel execution to Nexus TMS, meaning rating, labels and carrier choice for parcels.

Pairing documented at www.ajot.com/news/infor-announces-global-transportation-management-software-now- . Infor Nexus Network TMS with QAD Precision parcel is a product of Infor / QAD Precision; Netray is independent and not affiliated with either vendor.

Get Infor M3 alerts

Support and maintenance deadlines, release changes that affect Infor M3 sites, and new free Infor M3 tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for Infor M3: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to Infor M3? Start with the Infor M3 guide and toolkit, or plan with Training Path Builder, Upgrade Path Planner, ERP Table and Field Explorer.

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

Guides

AI on your ERP

Integrations

Software