Safety & WorkforceFree referencePDF, Excel, Word exportIndia

Factories Act 1948 Sections Quick Reference for Plant Managers

Plant managers keep reaching for the same dozen Factories Act sections: working hours, overtime, canteen, creche and safety officer thresholds. This table puts them in one searchable place.

Download:
SectionSubjectKey requirement in plain words
2(m)
Definition of factory
Premises with 10 or more workers using power, or 20 or more without power, where a manufacturing process is carried on
6
Approval, licensing and registration
Plans need prior approval and the factory needs a licence under the state rules
7
Notice by occupier
Occupier gives written notice to the chief inspector before occupying or using the premises
7A
General duties of the occupier
Ensure the health, safety and welfare of all workers so far as is reasonably practicable
11
Cleanliness
Keep the factory clean, with drains cleared and periodic limewashing or painting
13
Ventilation and temperature
Adequate ventilation and reasonable working temperature
14
Dust and fume
Take effective measures to prevent inhalation and accumulation of dust and fumes
16
Overcrowding
Minimum space per worker in work rooms
18
Drinking water
Provide wholesome drinking water at suitable points
19
Latrines and urinals
Sufficient, clean and separate for men and women
21
Fencing of machinery
Dangerous moving parts must be securely fenced
22
Work on or near machinery in motion
Only trained adult male workers, wearing tight clothing, may examine or lubricate moving machinery
28
Hoists and lifts
Sound construction, periodic examination, safety gates
29
Lifting machines, chains, ropes
Testing, examination by a competent person, safe working load marked
31
Pressure plant
Operating pressure must be safe and safety valves and gauges maintained
32
Floors, stairs and means of access
Safe means of access, handrails, no obstructions
34
Excessive weights
No person may be required to lift loads likely to cause injury
35
Protection of eyes
Screens or goggles for processes that risk eye injury
36A
Portable electric light
Safe voltage requirements in confined spaces
38
Precautions in case of fire
Exits, fire fighting means and worker training
40B
Safety officers
Required where 1000 or more workers are employed, or where the state notifies hazardous processes
41B
Compulsory disclosure for hazardous processes
Occupier discloses hazards and prepares an on-site emergency plan
42
Washing facilities
Adequate and clean facilities, separate for men and women
45
First aid
Boxes or cupboards, at least one for every 150 workers; ambulance room where 500 or more are employed
46
Canteen
Required where more than 250 workers are employed
47
Shelters, rest rooms, lunch rooms
Required where more than 150 workers are employed
48
Creches
Required where more than 30 women workers are employed
49
Welfare officers
Required where 500 or more workers are employed
51
Weekly hours
No adult worker works more than 48 hours in a week
52
Weekly holidays
A rest day for adult workers, normally a Sunday
54
Daily hours
No adult worker works more than 9 hours in a day
55
Intervals for rest
Rest interval of at least half an hour after at most 5 hours of work
56
Spread over
Working hours with intervals must not spread over more than 10.5 hours in a day
59
Extra wages for overtime
Overtime paid at twice the ordinary rate of wages
62
Register of adult workers
Maintain the register with names, shifts and rest days
66
Further restrictions on women's employment
Work within permitted hours, subject to state rules
67
Prohibition of employment of young children
No child under 14 may be employed
79
Annual leave with wages
Entitlement accrues at one day for every 20 days worked by an adult, subject to the qualifying rule
88
Notice of dangerous occurrences
Report accidents and dangerous occurrences to the inspector
92
General penalty
Penalties for contravention by the occupier or manager

This is a summary for orientation. Section numbers, thresholds and state rules can differ, and the Act is being absorbed into the OSH Code. Read the official text and your state Factories Rules before acting on any entry.

Shift and overtime compliance report

Optional help building shift and overtime exception reports from your ERP attendance data.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the quick reference

Search by section number or topic such as canteen, overtime or fencing. Each row shows the subject and the headline requirement. Use it to answer a quick question from HR or an auditor, then confirm the full text and state rules before taking a decision. Export it to PDF for a safety committee pack or to Excel if you want to add a compliance status column for each section.

  • Search by section number or topic
  • Use the thresholds to check which welfare facilities apply to you
  • Export to Excel and add status, owner and evidence columns

Headcount thresholds you will be asked about

The Act ties welfare and safety facilities to headcount. More than 150 workers triggers shelters and rest rooms, more than 250 triggers a canteen, more than 30 women workers triggers a creche, 500 or more workers triggers a welfare officer, and 1000 or more workers triggers a safety officer. These counts include contract workers in many state interpretations, so check how your state and your inspector count. Keep a monthly headcount record so you can show when a threshold was crossed.

Working hours and overtime

Adult workers are capped at 48 hours a week and 9 hours a day, with a rest interval after 5 hours and a total spread over of 10.5 hours. Overtime is paid at twice the ordinary rate under section 59. Some states have amended limits for overtime hours and exemptions, so use your state rules for the actual quarterly caps. ERP time and attendance setups should flag any shift pattern that breaks these limits before payroll closes.

Common mistakes

Plants often miss the headcount trigger when contract labour grows, so a canteen or creche requirement appears without notice. Registers are another weak point: the adult worker register, overtime register and accident register should match payroll and attendance exactly. A third issue is relying on an old summary without checking state amendments.

Frequently Asked Questions

Which Factories Act section deals with overtime wages?

Section 59 requires overtime to be paid at twice the ordinary rate of wages for work beyond the normal daily or weekly limits. State rules and recent amendments can change related limits, so check yours.

How many workers make a factory under the Act?

Section 2(m) covers premises with 10 or more workers where power is used, or 20 or more where it is not, if a manufacturing process is carried on. State governments can extend coverage to smaller units.

When must a plant appoint a safety officer?

Under section 40B a safety officer is required where 1000 or more workers are employed, or where the state government notifies the factory because of hazardous processes. Check your state rules for the qualifications.

Is this the full text of the Act?

No. These are short summaries for navigation, not legal text. Use the official Act and your state Factories Rules for decisions, and confirm the effect of the OSH Code on your establishment.

If you want shift, overtime and headcount alerts built into your ERP time data, we can help design those reports to run on your own servers.