Forklift Pre-Shift Inspection Checklist Template

Forklift incidents often trace back to a defect that was visible at the start of the shift. A short, consistent pre-shift inspection catches worn forks, failed brakes and leaking hoses before they hurt someone. Use this template as a daily form.

Fill in

Live preview
Free, optional. Reopen it on any device.
Download:

Forklift Pre-Shift Inspection Checklist Template

Powered Industrial Truck Daily Inspection

Date: 2026-10-20 Shift: First Operator: M. Okafor Truck ID: FLT-07 Type: Counterbalance (electric) Hour meter: 6,418 Charge or fuel: Battery 85%

Inspection Items (mark OK, Defect or N/A)

AreaCheckOK / Defect / N/A
WalkaroundTires or wheels: wear, damage, missing lugs
WalkaroundForks: cracks, bends, heel wear, positioner locks
WalkaroundMast, chains and carriage: damage, lubrication, slack
WalkaroundHydraulic hoses and cylinders: leaks, cracks
WalkaroundOverhead guard and load backrest: damage, loose bolts
PowerBattery: secured, connector and cables sound, water level
PowerLPG cylinder: mounted, hose and valve sound, no leaks
CabSeat belt or operator restraint latches
CabHorn, headlights, backup alarm, strobe or blue light
CabSteering, service brake and parking brake
CabLift, lower, tilt and sideshift operate smoothly
CabData plate and capacity placard legible
CabFire extinguisher present where required

Defects Noted

Left fork tip worn, within limit. Horn works. Seat belt latches. No leaks under truck.

Status

Truck status after inspection: Safe to operate

A truck with a defect that affects safe operation must be tagged and removed from service until repaired and cleared.

Sign-off

Operator / Date
Supervisor review (if defect noted) / Date
Maintenance (if repaired) / Date

A starting point, not legal advice. In the United States, OSHA 29 CFR 1910.178 requires industrial trucks to be examined before being placed in service, and at least daily when used on a round-the-clock basis, with unsafe trucks removed from service. Add checks that match your truck manufacturer's manual, your site rules and your local regulations.

Link inspections to maintenance work orders

Optional: a brief review of connecting inspection defects to work orders in your ERP.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the checklist

The operator completes one form per truck per shift, before the truck enters service. Walk around the truck first, then check controls from the seat. Mark each line OK, Defect or N/A, note the hour meter, and write any issues in the defects box. Export the PDF to print a stack for the dock, or export Excel and keep a digital log by truck. Supervisors should review every form with a defect.

Why the checks are ordered this way

The walkaround covers items that fail slowly: tires, forks, chains and hoses. The power section protects against battery acid, hydrogen and LPG hazards. The cab checks cover the controls and warning devices that prevent collisions. Any defect that affects braking, steering, lifting or load stability should take the truck out of service, not merely be noted.

  • Cracked or bent forks must not be used
  • Leaking hydraulic fluid is a fire and slip hazard
  • A missing seat belt or inoperative horn is not minor
  • Tag out the truck and notify the supervisor

Using the log for maintenance planning

Recording the hour meter each day gives maintenance a reliable usage record, which supports service intervals based on hours rather than guesses. Repeated defects on the same truck, such as tire wear or hydraulic leaks, show where preventive maintenance is falling behind or where operators are abusing equipment. Review the forms weekly, not only after an incident.

Common mistakes

The most common failure is a form signed without actually inspecting the truck. Others include no consequence for a reported defect, trucks returned to service without a documented repair, and a one-size checklist that ignores the difference between a reach truck and a pallet jack. Tailor the list and make removal from service easy and blame-free.

Frequently Asked Questions

How often must a forklift be inspected?

In the United States, OSHA requires examination before each shift when trucks are used on a round-the-clock basis, and at least daily otherwise. Other countries have similar rules, so check your local regulation and the manufacturer's manual.

Do pallet jacks need a pre-shift inspection?

Powered pallet jacks are powered industrial trucks and should be inspected like other trucks. Manual pallet jacks are not covered by the same rule, but a quick check of wheels, handle and forks is good practice.

What should happen when a defect is found?

Record it, tell the supervisor and tag the truck. If the defect affects safe operation, remove the truck from service until a qualified person repairs it and clears it. Do not let operators decide to carry on anyway.

How long should inspection forms be kept?

Rules vary. Many sites keep daily forms for at least a few months to a year, and keep repair records for the life of the truck. Follow your company policy, insurance requirements and local regulations.