LOTO Lockout Tagout Periodic Inspection Checklist

A lockout tagout program only protects people if the procedures match the machines and the people know them. This checklist structures the annual periodic inspection: procedures, devices, training, group and contractor control, and records. Use it as the working form for each inspection.

0%

0 of 36 items complete

10 critical items still open - these are the highest-risk gaps.

Free, optional. Reopen it on any device.
Download checklist:

Written program and procedures

Devices and hardware

Training and authorized employees

Group, shift and contractor control

Periodic inspection and records

Count the items marked complete. Any unchecked critical item should have a corrective action and an owner before the inspection is signed off. This checklist is a working aid based on the structure of the OSHA lockout/tagout rule (29 CFR 1910.147); check the current regulation and any local or state requirements.

Link safety procedures to work orders

Optional: talk to us about attaching energy control procedures to equipment and tasks in your ERP.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to run the inspection

Choose a machine or procedure, walk the actual isolation points with the authorized employee, and compare what they do with what the written procedure says. The inspector should not be a person who normally uses that procedure. Tick items as you verify them, note findings against the machine, and keep the completed form as the inspection record with the date, machine, inspector and employees included.

  • Inspect at least annually, or more often if incidents or changes occur
  • Observe, do not only read the procedure
  • Ask the employee to explain each energy source and the verification step
  • Record who was inspected and who inspected

What the rule expects

The OSHA standard in 29 CFR 1910.147 requires an energy control program, machine-specific procedures (with a limited exception for simple equipment), training, and periodic inspection at least annually. The inspection is meant to correct deviations or inadequacies in the procedure and in employee knowledge. Other countries and some US states have their own rules and different terms, so confirm which applies to your site.

Typical findings

Common failures are procedures that list only the electrical source and miss stored hydraulic or pneumatic energy, missing try-out steps, a single lock used for several people, contractor crews working under no shared procedure, and worn tags that cannot be read. Another is a procedure copied from a similar machine that has since been modified. Each finding should have an owner and a due date.

Connecting it to maintenance planning

Where possible, attach the correct energy control procedure to the maintenance task in your CMMS or ERP so the planner can print it with the work order. Review procedures when a modification or engineering change is closed. This keeps the document set tied to the equipment records instead of a separate folder that goes out of date.

Frequently Asked Questions

How often must LOTO procedures be inspected?

Under the OSHA rule in 29 CFR 1910.147, the periodic inspection must be done at least once a year for each energy control procedure. Many sites inspect high-risk machines more often, and after incidents or equipment changes.

Who may perform the periodic inspection?

An authorized employee who is not one of the employees using the procedure being inspected. That gives an independent look at whether the procedure and the practice match. Check your local regulation for exact wording.

Do I need a procedure for every machine?

In general yes, though the standard has a limited exception for simple equipment that meets listed conditions, and similar machines can share a procedure if the steps are the same. Document the reasoning for any exception.

Is this checklist legal advice?

No. It is a working aid built on the structure of the rule. Regulations change and vary by jurisdiction, so check the current text and consult your EHS adviser for your specific obligations.

If you want procedures linked to equipment and work orders in your ERP so inspections are scheduled and tracked, we can discuss how to set that up.