Forecast Value Add (FVA) Worksheet
Forecast value add asks a blunt question: does each step in your forecasting process make the forecast better than doing less? This worksheet compares a naive forecast, the statistical forecast and the final consensus forecast against actuals, item by item.
| Item / family | Actual | Naive forecast | Statistical forecast | Final consensus forecast | Naive abs error | Stat abs error | Final abs error | FVA of stat model (units) | FVA of overrides (units) | |
|---|---|---|---|---|---|---|---|---|---|---|
60 | 25 | 60 | 35 | -35 | ||||||
50 | 30 | 10 | 20 | 20 | ||||||
110 | 60 | 190 | 50 | -130 | ||||||
400 | 150 | 100 | 250 | 50 | ||||||
30 | 10 | 40 | 20 | -30 | ||||||
60 | 20 | 10 | 40 | 10 |
Use the same actuals, lag and bucket for all three forecasts. The naive forecast is usually the last period's actual (or the same period last year for seasonal items). Measure over many periods before judging a team; a single month is noise.
Score every forecast version automatically
Optional: we can outline how to store each forecast version from your ERP and compute FVA by planner and family.
Optional. The tool and every export work without this. No spam.
How to use the worksheet
For each item or family, enter actual demand and three forecasts made at the same lag: the naive forecast, the statistical forecast and the final consensus after overrides. The sheet calculates the absolute error of each, the units of value added or lost by the model and by the overrides, and the WMAPE for each layer. Run it over several months of history, ideally by planner or by product group, then discuss the results at the demand review. Export to Excel to build a monthly trend of FVA.
The logic of FVA
FVA compares the error of one step with the error of the step before it. The naive forecast is the free benchmark. If the statistical model cannot beat naive, the model needs different parameters or data. If the consensus forecast has higher error than the statistical forecast, the overrides are subtracting value. The measure is simple: error before minus error after. A positive result means the step added value. The idea is popularised by Michael Gilliland in the forecasting community, and it is now a standard way to run forecast process reviews.
- Naive: last period or same period last year.
- Statistical: baseline model output.
- Consensus: after sales, marketing and planner overrides.
Reading the results
With the example rows, the statistical model beats naive by a few points of WMAPE, and the overrides slightly worsen the final forecast in some families because large upward adjustments missed. Do not conclude that overrides never work. Look at where they help: known one-off events, new products and contract changes are often better judged by people, while routine adjustments to stable items usually add noise. Target the review at the largest negative FVA items by volume.
Common mistakes
Comparing forecasts made at different lags. Judging a person or team on a few weeks of data. Using FVA only to criticise, when its best use is to focus effort where it pays. Skipping the naive benchmark, which leaves no baseline for improvement. And ignoring bias: a layer can lower absolute error while adding a systematic lean, so check the tracking signal for each forecast version as well.
Frequently Asked Questions
What is forecast value add?
It measures whether a step in the forecasting process improves accuracy compared with the previous step. You compare error from a naive forecast, a statistical forecast and the final consensus. Positive FVA means the step reduced error, negative means it increased error.
What is a naive forecast?
It is the simplest possible forecast, usually that next period will equal the last actual, or equal the same period last year for seasonal items. It costs nothing to produce, so any model or process that cannot beat it is not adding value.
Why would overrides make a forecast worse?
Common reasons are optimism bias, sales targets leaking into the forecast, adjusting stable items out of habit and double counting events already in the baseline. Overrides tend to help most with specific, documented events that history cannot see.
How much history do I need for FVA?
At least several months across many items, and ideally a year. A single period is dominated by noise. Group results by planner, product family and size of adjustment to see where the overrides help or hurt, once you have enough observations.
If you want each forecast version saved and scored automatically from your ERP every cycle, we can design a read-only FVA report that updates itself.
Related Tools
Forecast Accuracy MAPE and WMAPE Worksheet
Fill in actual and forecast per SKU and get item-level percentage error, plus portfolio MAPE, WMAPE, bias and forecast accuracy. Exports to Excel.
Supply Chain & InventoryForecast Bias and Tracking Signal Worksheet
Enter actual and forecast for each period of one item and get running error, MAD, tracking signal and bias percent so you know when a forecast has drifted.
Supply Chain & InventoryDemand Plan Template by Product Family
An editable demand plan worksheet: statistical baseline, sales and marketing adjustments, consensus, growth versus last year and confidence by product family.
Discrete ManufacturingDemand Planning Maturity Assessment
Score your demand planning maturity across forecasting method, accuracy tracking, S&OP process, and data granularity in about five minutes.
More Supply Chain & Inventory tools
See all- Oracle Fusion Inventory Turns and Carrying Cost Calculator
- Distribution ERP Fill Rate Calculator
- Distributor Rebate Tracking Worksheet
- Branch Transfer Planning Worksheet
- Distributor Slow-Moving Inventory Review Worksheet
- Distributor Vendor Performance Scorecard Worksheet
- Distributor GMROI Calculator
- Distributor Backorder Cost and Fill Rate Calculator
- EOQ with Vendor Minimum Order Calculator
Keep exploring
Free tools
- Statistical Forecast Model Comparison WorksheetLine up actuals against two forecast methods, see absolute percentage error per period and average MAPE for each, then export to Excel.
- Statistical vs Sales Forecast Blend CalculatorWeight the statistical forecast and the sales or customer forecast by how accurate each has been, and see the consensus number and the gap between sources.
- Forecast Override Log WorksheetLog every manual forecast override and measure whether it improved accuracy against the statistical baseline.
ERP fixes and how-tos
- SYSPRO Forecasting: How Forecasts Feed MRPHow SYSPRO forecasting feeds MRP: setting up forecasts, choosing a method, how sales orders consume forecast, and how to check the MRP result before releasing.
- Business Central for Process Manufacturing, Production Forecasts and Production DebuggingWhat Business Central can and cannot do for process manufacturing, how to set up a production forecast for planning, and how to debug production order problems.
- SyteLine forecasting, planning horizon and planning calendarHow forecasting, the planning horizon and the planning calendar work together in SyteLine MRP and APS, with parameter guidance and common mistakes to avoid.
Guides
- Demand Forecasting Configuration in Infor SyteLineConfigure SyteLine demand forecasting with statistical models, forecast consumption, demand management parameters, and accuracy measurement for production planning.
- AI Demand Forecasting Inside Your ERP: Better Numbers Into MRPAI demand forecasting in ERP: machine learning models that cut forecast error 20-40% and feed MRP in SyteLine, Infor LN, and M3 with planner-ready numbers.
- Infor M3 Demand Planning and Forecasting ConfigurationConfigure Infor M3 demand planning with statistical forecasting, forecast consumption, MPS integration, and demand sensing for accurate production scheduling.
AI on your ERP
- AI-Powered Demand Forecasting Integrations for NetSuite: Models, Item Demand Plans and ExplanationsHow AI demand forecasting integrates with NetSuite: native demand plans, external forecast models, importing item demand plans and explaining changes.
- AI Demand Forecasting for Manufacturers: Better Numbers and an Explanation Planners Can TrustAI demand forecasting explains ERP forecast changes in plain language, flags exceptions for planners, and handles short-history SKUs without Excel overrides.