Supply Chain & InventoryFree templatePDF, Excel, Word exportWarehousing and Logistics

Freight Damage and Shortage Claim Form Template

Filing a freight claim is mostly an exercise in documentation. Carriers pay claims that arrive complete and on time, and deny those that are missing proof. This template organises the details and the document checklist so nothing is left out.

Fill in

Live preview
Free, optional. Reopen it on any device.
Download:

Freight Damage Claim Form Template

Freight Claim

Claim reference: FC-2026-018 Date: 2026-10-22 Claim type: Visible damage Total claimed: 4,860.00

Claimant

Eastline Assembly LLC Contact: Receiving Manager, +1 555 0142

Shipment Details

Carrier: Regional Freight Lines PRO number: PRO 7731902 BOL number: BOL-2026-004417 Delivery date: 2026-10-21

Description of Loss or Damage

Two of three pallets arrived with crushed lower cartons and forklift punctures. Exception noted on the delivery receipt at time of delivery. Goods held in quarantine for carrier inspection.

Itemised Claim

Item numberDescriptionQty affectedUnit valueClaimed valueBasis
BRK-1001Machined bracket, boxed12028.503,420.00Invoice
FIT-2204Hydraulic fitting6024.001,440.00Invoice

Documents Attached

DocumentAttached (Y/N)
Original bill of lading
Delivery receipt showing noted exceptions
Commercial invoice for the goods
Photographs of damage and packaging
Inspection report or repair estimate
Packing list

Declaration

Claimant representative (name, title, date) / Date

A starting point, not legal advice. Carrier liability limits, notice periods and filing deadlines depend on the carrier's tariff, the bill of lading and applicable law, so check them before filing. In the United States, interstate motor carriers generally require a written claim within nine months of delivery, but confirm the terms that apply to your shipment.

Draft claim packages from ERP data

Optional: a short review of automating claim document assembly from shipment, receipt and invoice records.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the template

Fill in the shipment identifiers exactly as they appear on the bill of lading, choose the claim type, and describe what happened in plain facts. Then complete the itemised table with the invoice value of each affected item. Export the PDF and attach it to your claim package along with the documents on the checklist. Keep your own copy and log the date it was sent, because carriers usually acknowledge claims within a defined period.

Visible versus concealed damage

Visible damage is noticed at delivery and should be noted on the delivery receipt before signing. Concealed damage is discovered after the driver has left, once cartons are opened. Concealed claims are possible but harder, so report them to the carrier quickly, keep the packaging, and do not move the goods until the carrier has had the chance to inspect.

  • Note exceptions on the delivery receipt, not only in email
  • Photograph the pallet, labels and damage before unpacking
  • Keep damaged packaging for inspection
  • Report concealed damage as soon as it is found

Calculating the claimed amount

Claims are typically based on the invoice value of the damaged or missing goods, plus documented freight charges in some cases, less any salvage. Consequential losses such as production downtime are usually not covered under standard terms. Use the actual invoice unit value, not list price or replacement cost, unless your bill of lading declared a different value.

Common mistakes

Claims fail when the delivery receipt was signed clean, when the filing deadline was missed, when no invoice was attached, or when the goods were thrown away before inspection. Another frequent problem is claiming the whole shipment when only part was affected. Be specific and keep the claim proportionate to the evidence.

Frequently Asked Questions

How soon must a freight claim be filed?

It depends on the carrier's terms, the bill of lading and applicable law. For US interstate trucking, nine months from delivery is a common minimum for written claims, but contracts can differ. File promptly, since evidence and memory fade quickly.

Do I need to keep damaged goods?

Yes. Carriers have the right to inspect, and many will send an inspector or ask for photos before they accept liability. Hold the goods and packaging in a marked quarantine location until the claim is settled or the carrier releases them.

What if I signed the delivery receipt clean?

You can still file for concealed damage, but your position is weaker. Report it quickly with photos and the original packaging. For future deliveries, note any visible issue on the receipt before signing.

Can I claim for lost sales or downtime?

Usually not under standard carrier terms, which limit liability to the value of the goods and sometimes to a per-pound cap. If the shipment is high value, declare the value on the bill of lading and consider separate cargo insurance.

If you want claim packages assembled automatically from your ERP shipment, receipt and invoice data, we can discuss a private agent that drafts them for review.