Warehouse Receiving Report Template
A receiving report is the first control point for inventory accuracy. If the count, condition and lot at the dock are wrong, every downstream number inherits the error. Use this template to make receiving consistent across shifts.
Fill in
Warehouse Receiving Report Template
Receiving Report
Report number: RR-20261020-03 Date received: 2026-10-20 Dock arrival: 09:40 Dock door: Door 4
Delivery Details
Supplier: Allied Fastener Supply Purchase order: PO-77412 Carrier: Metro Express Freight Trailer or container: TRL-20931 Seal condition: Intact, number matches
Line Check
| Line | Item number | Ordered | Received | UoM | Condition | Lot or serial | Putaway location |
|---|---|---|---|---|---|---|---|
| 1 | FST-M8-40 | 5,000 | 5,000 | EA | Good | L2610-18 | A-12-03 |
| 2 | FST-M10-60 | 2,400 | 2,200 | EA | Short 200 | L2610-21 | A-12-05 |
| 3 | |||||||
| 4 |
Exceptions
Two cartons on pallet 3 crushed at one corner. Contents inspected, no visible damage. Photos taken.
Sign-off
Record exceptions on the carrier's delivery receipt before the driver leaves, as well as here. Post the receipt in your ERP against the purchase order only after quantities are verified, so over and short receipts follow your tolerance rules. Adjust the columns to match your own inspection requirements.
Automate receiving matching
Optional: a brief review of how delivery documents could be matched to POs from your ERP data.
Optional. The tool and every export work without this. No spam.
How to use it
Complete the delivery header when the truck is at the door, then check each PO line against what is physically on the pallets. Record ordered quantity, received quantity and condition separately so shortages and overages are obvious. Export the finished report to PDF for the file, or to Excel if you keep a daily receiving log. Sign it, and give the driver a copy with any exceptions noted on the carrier's paperwork.
What to verify at the dock
Check the seal number against the BOL before opening the trailer. Count handling units first, then pieces. Inspect for visible damage before moving anything, because once freight is moved the carrier will dispute liability. Capture lot or serial numbers for controlled items at receipt, not later, since back-filling them from memory is a common source of traceability gaps.
- Seal number and condition against the BOL
- Pallet or carton count against the carrier paperwork
- Item and quantity against the PO line, including UoM
- Visible damage, wet cartons, crushed corners
- Lot, date code or serial where required
Reading the discrepancy columns
A short receipt means you owe the supplier a discrepancy notice and the PO line stays open. An over receipt needs a decision: return, accept within tolerance, or accept and update the PO. Damaged goods should be received to a quarantine or hold location rather than to saleable stock, so they cannot be picked while a claim is pending.
Common mistakes
Teams often sign the carrier's receipt clean and find shortages later, which weakens any claim. Others receive the whole PO quantity because the packing slip says so, without counting. Receiving into a generic location with the intent to move it later leads to lost stock. Use a staging location, then put away with a documented move.
Frequently Asked Questions
Is a receiving report the same as a goods received note?
They serve the same purpose: a document recording what arrived, in what condition and against which order. Goods received note (GRN) is the common term in India, the UK and Africa, while receiving report is typical in North America.
Who should sign the receiving report?
The person who physically counted and inspected the delivery signs as receiver. Many sites also have inventory control or a supervisor review it for exceptions. The driver's signature on your copy shows they acknowledged the noted discrepancies.
How long should receiving reports be kept?
It depends on your quality system, customer contracts and tax rules. Many sites keep them at least as long as the related supplier invoice and audit period. Aerospace and regulated industries often require longer retention, so follow your own procedure.
Should I receive damaged goods into stock?
Receive them to a hold or quarantine location with the damage documented, not to available stock. That prevents picking while the carrier claim or supplier return is decided, and it keeps your inventory accuracy honest.
If receiving data is re-keyed from paper into your ERP, we can show how a private AI agent can match delivery documents to POs and flag discrepancies for a person to approve.
Related Tools
Bill of Lading Template
A fill-in straight bill of lading with shipper, consignee, carrier, commodity lines and signature blocks. Exports to PDF, Word or Excel.
Supply Chain & InventoryFreight Damage Claim Form Template
A fill-in freight claim form for damaged or short shipments, with a document checklist. Exports to PDF, Word or Excel.
Supply Chain & InventoryWarehouse Putaway Task Log Worksheet
An editable putaway log that computes units per hour and minutes per line for each task. Exports to Excel.
Supply Chain & InventoryWarehouse Bin Location Master Worksheet
An editable bin master with zone, aisle, bay, level, dimensions and computed volume. Exports to Excel for WMS or ERP location loading.
More Supply Chain & Inventory tools
See all- Carrier Performance Scorecard Worksheet
- Warehouse Labor Hours Planning Worksheet
- Oracle Fusion Inventory Turns and Carrying Cost Calculator
- Distribution ERP Fill Rate Calculator
- Distributor Rebate Tracking Worksheet
- Branch Transfer Planning Worksheet
- Distributor Slow-Moving Inventory Review Worksheet
- Distributor Vendor Performance Scorecard Worksheet
- Distributor GMROI Calculator