Furniture Cut List and Panel Yield Worksheet
A cut list is the bridge between the design drawing and the panel saw. This worksheet totals part area and edge banding and gives a quick sheet count, so a planner can quote and order board before the nesting software runs.
| Part | Material | Qty | Length (mm) | Width (mm) | Area (m2) | Edge banding (m) | |
|---|---|---|---|---|---|---|---|
0.8064 | 2.88 | ||||||
0.8557 | 3.056 | ||||||
0.8208 | 3.04 | ||||||
0.5669 | 1.428 | ||||||
0.5456 | 2.864 |
Edge banding here counts the two long edges of each part only. Add short edges or one-edge parts to your own rules. Sheet estimates mix all materials, so split the list by material before ordering.
Want cut lists generated from your BOM?
We can review how part lists and sheet quantities could come straight from your ERP.
Optional. The tool and every export work without this. No spam.
How to use the worksheet
List every part with its material, quantity and finished size in millimetres. The area and edge banding columns calculate by themselves. The summary under the table divides total part area by the area of a full 2440 by 1220 sheet at an assumed yield. Replace the example rows, then export to Excel or CSV and pass it to the saw operator. For jobs with several board types, copy the sheet once per material.
- Use finished sizes, not rough sizes
- Keep grain direction in the part name
- Group rows by material
- Add a kerf allowance in your nesting step
- Check edge banding rules for every part
Yield and the method behind it
Yield is part area divided by the sheet area consumed. Simple carcass work with few part sizes often nests at 80 to 90 percent, while curved parts, grain-matched doors and veneered panels can fall well below that. Treat the worksheet figure as an order estimate. The final answer comes from optimised nesting, which accounts for kerf, trim cuts and the sheet sizes your supplier really delivers.
Common mistakes and ERP notes
Teams often forget that the back panel uses a different board, or they mix 18 mm and 25 mm parts in one total. In an ERP, each board type should be its own component on the bill of materials, with the sheet as the unit of measure and a yield or scrap factor on the line. This worksheet gives you the starting quantity and the scrap percentage to enter there.
Frequently Asked Questions
What yield should I assume for panel cutting?
For cabinets and carcass furniture, 80 to 90 percent is a common planning range with good nesting. Grain-matched, veneered or curved work is lower. Use your own history from past jobs if you have it, and adjust the yield in the summary formula.
Does the worksheet include saw kerf?
No. The area is the finished part size. Kerf, trim cuts and edge allowances are handled by your nesting software or your yield factor, so keep the estimate conservative and confirm with the saw operator.
Can I use it for solid wood?
Area is useful for veneer and sheet goods. For solid wood you normally buy by volume or board feet, so use the quantities here as a parts list and calculate lumber separately by thickness.
How do I export the list?
Use the export buttons to get Excel or CSV. The calculated columns export with their values, which you can hand to a panel saw or import into a nesting tool after mapping the column names.
If your cut lists are rebuilt by hand for every order, we can review how to generate them from the BOM in your ERP.
Related Tools
Furniture Container Loading CBM Calculator
Estimate cubic metres per carton, total shipment volume and the number of 20 ft, 40 ft or 40 ft high cube containers required.
Quality & InspectionFabric Four-Point Inspection Report Template
A printable report for the four-point fabric inspection system, with defect point scoring rules and a roll-by-roll results table.
Industry TemplatesGarment Size Grade Spec Worksheet
An editable size chart that builds S, M, L and XL measurements from a base size and grade increment per point of measure.
Industry TemplatesTextile Dye Lot Recipe Card Template
A dye lot recipe card that records fabric, liquor ratio, dyestuff, chemicals, process steps and shade results for one batch.
More Discrete Manufacturing tools
See all- OEE Calculator (Overall Equipment Effectiveness)
- Scrap Rate Cost Calculator
- Takt Time Calculator
- Cycle Time & Capacity Calculator
- Inventory Carrying Cost Calculator
- Economic Order Quantity (EOQ) Calculator
- MRP Nervousness Assessment
- Production Scheduling Maturity Assessment
- Shop Floor Digitization Scorecard
Keep exploring
Free tools
- Furniture Panel Sheet Yield and Kerf CalculatorEstimate how many identical parts fit on a board, material yield, sheets needed for an order and board cost per part, including saw kerf and trim.
- Furniture BOM Cost WorksheetEditable furniture BOM with scrap per line and extended material cost, ready to export to Excel for costing or ERP upload prep.
- Furniture Finishing Defect ChecklistChecklist for finished furniture inspection: surface prep, coating defects, colour match, assembly and packing, with critical items flagged.
AI on your ERP
- AI for ERP in Furniture and Woodworking ManufacturingPrivate AI on your ERP for furniture and cabinet makers: configurators, cut lists, panel yield, lumber grades, finishing, formaldehyde and install scheduling.
- AI on Infor SyteLine for Furniture ManufacturersAI on Infor SyteLine for furniture makers: finish and fabric variants, cut-to-size yield, CARB and TSCA records, and dealer order status. On-prem option.