Fabric Four-Point Inspection Report Template
The four-point system scores every visible fabric defect from one to four points by size, then converts the total into points per 100 square yards. This template gives inspectors a consistent record and gives the buyer a documented basis for accepting or rejecting a lot.
Fill in
Fabric Four-Point Inspection Report Template
Fabric Inspection Report
Company: Sunrise Apparel Pvt Ltd Supplier: Hanshin Textile Mills PO: PO-448210 Article: Cotton twill 3/1, 245 GSM Lot: LOT-7731 Inspector: R. Mehta Date: 2026-10-20
Scoring Rules (four-point system)
| Defect size | Penalty points |
|---|---|
| Up to 3 inches (75 mm) in length | 1 |
| Over 3 up to 6 inches | 2 |
| Over 6 up to 9 inches | 3 |
| Over 9 inches | 4 |
| Hole up to 1 inch | 2 |
| Hole over 1 inch | 4 |
Roll Results
| Roll no. | Length (yd) | Cuttable width (in) | Total points | Points per 100 sq yd | Result |
|---|---|---|---|---|---|
| 1 | |||||
| 2 | |||||
| 3 | |||||
| 4 | |||||
| 5 | |||||
| 6 |
Formula and Limit
Points per 100 sq yd = (total points x 3600) / (length in yards x cuttable width in inches).
Acceptance limit: 40 points per 100 sq yd per roll. Maximum 4 points per linear yard regardless of defects in that yard.
Remarks
Shade variation checked against approved lab dip under D65. Selvedge to selvedge width checked at three points per roll.
Sign-off
The four-point system is a common industry method, but the acceptance limit comes from your buyer or supplier agreement. Forty points per 100 square yards is a widely used default, not a universal rule.
Want inspection results flowing into your ERP?
We can review how roll-level inspection data could post to quality records in your system.
Optional. The tool and every export work without this. No spam.
How to use the report
Complete the header, then inspect each roll on an inspection frame with a light source, running the fabric at a steady speed. Record the length, cuttable width and total penalty points for each roll in the exported document. Calculate points per 100 square yards with the printed formula and compare it to the agreed limit. Mark the roll as pass or fail, and note shade, hand feel and width on the remarks block. Sign and send it with the goods receipt.
- Inspect rolls on a frame, not on the table
- Use cuttable width, not full width
- Cap penalty at 4 points per linear yard
- Record the result per roll, not only per lot
- File the report against the goods receipt
The method behind the score
Defects are scored by length for warp or weft direction faults: up to 3 inches is one point, over 3 up to 6 is two, over 6 up to 9 is three, and over 9 is four. Holes are scored by diameter. The total is scaled by roll area to a common 100 square yard basis, which makes rolls of different size comparable. A roll that scores above the limit is graded down or rejected. Large lots are often sampled, with the sample size set in the supply agreement.
Mistakes and ERP notes
Common errors are using full width rather than cuttable width, forgetting the per-yard cap, and inspecting only the first rolls of a lot. In an ERP, record the result against the goods receipt or the inspection lot, and block the roll or lot if it fails. Keep roll numbers from the supplier packing list, since they link a failed roll to a cutting plan and to a debit note.
Frequently Asked Questions
What is a normal acceptance level for four-point inspection?
Forty points per 100 square yards is a widely used default for a roll, and some buyers use 20 to 30 for premium goods. It is a contract term, so confirm the figure in your purchase agreement or buyer manual before you reject a lot.
Why use cuttable width and not full width?
Fabric beyond the usable width cannot be cut into garments, so including it understates the defect density. Cuttable width is the distance between the useful edges, excluding selvedge and any unusable stripes or marks.
Do I inspect every roll?
That depends on the agreement. Many mills accept sampling based on lot size, while high-value or problem fabrics are checked at 100%. If a sample fails, a common rule is to inspect the entire lot.
How is shade variation handled?
Shade is normally not scored by the four-point system. Check it separately against an approved lab dip or swatch, and record shading between rolls, within a roll and from side to centre in the remarks.
If inspection results sit in paper files, we can look at how to feed them into your ERP quality module. Ask us for an expert review.
Related Tools
Garment Tech Pack Specification Template
A fill-in tech pack that gives the sewing floor and the buyer one agreed specification for a style, exportable to PDF or Word.
Industry TemplatesTextile Dye Lot Recipe Card Template
A dye lot recipe card that records fabric, liquor ratio, dyestuff, chemicals, process steps and shade results for one batch.
Industry TemplatesPre-Production Meeting (PPM) Minutes Template
Minutes for the pre-production meeting that releases an apparel order to cutting, with approvals, risks and an action list.
Discrete ManufacturingFurniture Cut List and Panel Yield Worksheet
An editable cut list that totals part area and estimates how many board sheets a furniture job needs, exportable to Excel.
More Quality & Inspection tools
See all- SAP QM Process Capability Cp Cpk Calculator
- SAP QM Lot Rejection Rate, PPM and Sigma Level Calculator
- SAP QM Gauge R&R Study Calculator
- SAP QM Cp and Cpk Capability Calculator
- Job Shop Material Certification Log Worksheet
- Job Shop First Piece Inspection Sign-Off Template
- Job Shop Scrap and Rework Cost Calculator
- Master Data Audit Sample Size Calculator
- Data Quality Sigma Level Calculator
Keep exploring
Free tools
- Fabric Consumption CalculatorWork out fabric consumption per garment and for the whole order from marker length, end allowance, shrinkage and wastage.
- Fabric Shrinkage Pattern Allowance CalculatorConvert finished garment size and wash shrinkage into the pattern (cut) size, then total fabric area and linear meters for the order.
- GSM Calculator for Fabric WeightCompute fabric GSM from a cut sample, then convert to oz/yd2, grams per linear metre, metres per kg and roll weight.
ERP fixes and how-tos
- Infor Data Lake Compass API: Submit a Query, Poll and Fetch ResultsHow the Compass API works in Infor Data Lake: submit SQL as a job, poll status, page results, and handle timeouts, with a Python outline and common errors.
- Inspection Results and Inspection Plan Reports in SAP QMWhich SAP QM transactions report inspection results and inspection plans? Use QA32, QE03, QGC1 for evaluation and QP19 for plan lists, plus the QM tables behind them.
- SAP QM inspection results report: which tcode shows whatFind inspection results in SAP QM: QA32 lot list, QE51N results worklist, QM12 and QGC2 evaluations, MIC history, and the QALS, QAMR and QAVE tables.
AI on your ERP
- AI on Your ERP for Textile and Apparel ManufacturingPrivate AI on your ERP for textile and apparel makers: style-color-size matrices, lot dyeing, cut plans, TNA calendars and buyer compliance, kept on your own systems.
- Private AI for Epicor Kinetic Cloud, Outside the Multi-Tenant BoundaryRun a private LLM on Epicor Kinetic private cloud or Kinetic Cloud data via BAQs, REST v2 and Data Fabric, keeping sensitive manufacturing data off shared AI.