Garment Size Grade Spec Worksheet
A size chart tells the factory what each point of measure must be in every size. This worksheet builds a size set from the base size and a grade step, and keeps the tolerance beside it so that sewing and final inspection check the same numbers.
| Point of measure | Base size M (cm) | Grade step (cm) | S | M | L | XL | Tolerance +/- (cm) | |
|---|---|---|---|---|---|---|---|---|
51.5 | 54 | 56.5 | 59 | |||||
49.5 | 52 | 54.5 | 57 | |||||
68.5 | 70 | 71.5 | 73 | |||||
44 | 45 | 46 | 47 | |||||
62 | 63 | 64 | 65 | |||||
18.5 | 19 | 19.5 | 20 |
This worksheet uses a uniform step between sizes, which is a simplification. Real grade rules can differ between size breaks, so overwrite computed sizes in the exported file where your pattern block needs it. All measurements are garment measurements, not body measurements.
Need size data consistent with your ERP?
We can review how size matrices and spec data are structured in your item master.
Optional. The tool and every export work without this. No spam.
How to use the worksheet
Enter the points of measure that the buyer specifies, then the base size value in the middle size and the grade step in centimetres. The small, large and extra-large columns calculate from those two numbers. Change the example rows to your style, export the table to Excel, and paste it into the tech pack. If a size break is not uniform, edit the exported cells for that size and note the exception.
- Name each point of measure exactly as the buyer does
- Measure flat, laid on a table
- Keep the tolerance column in the exported file
- Hold the base size sample for the whole run
- Use the same unit across the pack
Grading in plain terms
Grading scales a base pattern up and down to produce other sizes. The grade step is the change per size at a given point, for example 2.5 cm in chest width or 1 cm in sleeve length. Body-width points grade more than shoulder or neck points. A uniform grade is a quick approximation, and most pattern makers refine increments at larger sizes. The tolerance defines how far a finished garment may differ from spec before it fails inspection.
Common mistakes and ERP notes
Frequent errors include mixing half-chest and full-chest numbers, applying the grade in the wrong direction, and using a tolerance in different units from the spec. In an ERP, size is usually an item variant or a matrix dimension. Keep the size codes in the chart identical to the ERP size codes, so that the measurement spec, the production order and the packing list all use the same labels.
Frequently Asked Questions
What is a grade step?
It is the difference in a measurement from one size to the next at a given point of measure. For example, a 2.5 cm chest grade means each larger size is 2.5 cm wider at the chest, measured flat on the garment.
Is chest measured flat or around?
Specs normally state flat half-chest, measured across the garment. Always confirm whether your buyer lists half or full circumference. The worksheet works with either, but all points in the same chart must use the same basis.
Why keep tolerances in the same sheet?
Inspectors need the spec and the allowed variation together. Putting tolerance beside each point of measure avoids guesses on the line and gives auditors a clear basis for passing or failing a garment.
Can I add more sizes?
You can add more columns in the exported file by extending the same pattern. For plus sizes or children, use a separate chart with its own base size and grade steps instead of stretching one grade rule.
If size and variant data is hard to keep consistent between style files and your ERP, we can take a look and suggest a cleaner structure.
Related Tools
Garment Tech Pack Specification Template
A fill-in tech pack that gives the sewing floor and the buyer one agreed specification for a style, exportable to PDF or Word.
Industry TemplatesPre-Production Meeting (PPM) Minutes Template
Minutes for the pre-production meeting that releases an apparel order to cutting, with approvals, risks and an action list.
MES & Shop FloorApparel Time and Action (TNA) Calendar Worksheet
An editable time and action plan that lists order milestones, owners, planned and actual days, and shows total delay.
Quality & InspectionFabric Four-Point Inspection Report Template
A printable report for the four-point fabric inspection system, with defect point scoring rules and a roll-by-roll results table.
More Industry Templates tools
See all- Textile Dye Lot Recipe Card Template
- Fabric Shrinkage Pattern Allowance Calculator
- Reactive Dye Liquor Ratio and Recipe Calculator
- Yarn Count Conversion Worksheet (Ne, Tex, Nm, Denier)
- Cutting Order and Lay Plan Sheet Template
- Distributor Free Freight Policy Template
- Job Shop Quote Cover Letter Template
- Monthly Operations Review Meeting Pack Template
- OEE Improvement A3 Charter Template
Keep exploring
Free tools
- Garment Costing WorksheetEditable cost sheet for a single style: fabric, trims, cut-make-trim, packing and overhead with wastage per line and a quote price.
- Garment Tech Pack Specification TemplateA fill-in tech pack that gives the sewing floor and the buyer one agreed specification for a style, exportable to PDF or Word.
- Garment SAM Daily Output and Labor Cost CalculatorTurn style SAM, operators, hours and line efficiency into daily output, labor cost per piece and days to complete an order.
Guides
- Infor M3 Fashion Edition: Style-Color-Size Matrix, PLM Integration, and Seasonal PlanningConfigure Infor M3 for fashion and apparel. Style-color-size matrix, PLM integration, seasonal planning, and garment costing in M3 Fashion edition.
- Factory KPI Dashboard Design: 7 Rules for Dashboards People Actually UseFactory KPI dashboard design in 7 rules: pick metrics by audience, define each KPI, limit tiles, drill to the source row, show data freshness, and track usage.
AI on your ERP
- AI on Your ERP for Textile and Apparel ManufacturingPrivate AI on your ERP for textile and apparel makers: style-color-size matrices, lot dyeing, cut plans, TNA calendars and buyer compliance, kept on your own systems.
- NetSuite AI for Apparel Manufacturing: Matrix Items, Seasons, Contractors and TraceabilityAI on NetSuite for apparel: matrix items, size curves, seasons, contract manufacturers, landed cost and UFLPA traceability questions, answered privately.