Yarn Count Conversion Worksheet: Ne to Tex, Nm and Denier
Yarn is sold in different count systems depending on the fiber and the country, which makes purchase orders, BOMs and supplier quotes hard to compare. This worksheet converts English cotton count (Ne) into Tex, dtex, Nm and denier, and gives yarn length for the weight you buy.
| Yarn / use | Cotton count Ne | Tex (g per 1000 m) | dtex | Metric count Nm | Denier (g per 9000 m) | Quantity (kg) | Length (km) | |
|---|---|---|---|---|---|---|---|---|
19.6833 | 196.8333 | 50.8044 | 177.15 | 101,608.81 | ||||
29.525 | 295.25 | 33.8696 | 265.725 | 169,348.01 | ||||
9.8417 | 98.4167 | 101.6088 | 88.575 | 81,287.04 | ||||
59.05 | 590.5 | 16.9348 | 531.45 | 101,608.81 | ||||
7.3813 | 73.8125 | 135.4784 | 66.4313 | 40,643.52 |
Conversions assume the standard cotton count: Tex = 590.5 / Ne, with Nm = 1000 / Tex and denier = 9 x Tex. Other systems (worsted, linen, woolen) use different constants. Check the count system before ordering.
Normalize item specs in your ERP
Optional: discuss cleaning yarn and fabric specifications across your item master.
Optional. The tool and every export work without this. No spam.
How to use it
Type each yarn on a row, enter the Ne count and the quantity in kilograms, and the other systems are calculated automatically. Add rows for each yarn on your BOM, then export to Excel or PDF for a purchase order or tech pack. Overwrite the example rows with your own counts.
- Ne and Nm are indirect systems: higher number means finer yarn
- Tex and denier are direct systems: higher number means heavier yarn
- Ply yarns need the resultant count, so check the supplier's convention
The conversions
Tex is grams per 1000 meters. For cotton counts, Tex = 590.5 / Ne. Nm is meters per gram, so Nm = 1000 / Tex. Denier is grams per 9000 meters, so Denier = 9 x Tex, and dtex is 10 x Tex. Yarn length in kilometers equals kilograms x 1000 / Tex, which is useful when you convert a purchase quantity into knitted or woven length.
Reading the result
A 30 Ne yarn is about 19.7 Tex, roughly 50.8 Nm and about 177 denier. Doubling the Ne halves the Tex. Use the length column to compare supplier quotes per kilogram on yarns of different counts: a finer yarn gives more kilometers per kilogram, so a higher price per kilogram can still be the same cost per kilometer.
Common mistakes
The most frequent mistake is mixing indirect and direct systems, for example expecting a higher Nm to mean a heavier yarn. Others apply the cotton constant to worsted or linen counts, which use other base lengths. Also check whether denier refers to filament yarn, and whether the quoted count is single or plied before conversion.
Frequently Asked Questions
What is the formula to convert Ne to Tex?
For English cotton count the formula is Tex = 590.5 / Ne. For example 20 Ne is 29.5 Tex. Tex is the grams of yarn per 1000 meters, so a heavier yarn has a higher Tex and a lower Ne.
How do I convert Ne to Nm?
Divide 1000 by the Tex, or multiply Ne by about 1.6934. For example 30 Ne is about 50.8 Nm. Nm counts the meters in one gram, so a higher Nm is a finer yarn.
Does this work for polyester or viscose?
Counts are fiber independent once expressed in Tex or denier. If the supplier quotes polyester in denier, enter the Ne equivalent or use the formula backwards. The cotton constant only applies if the count is given as Ne.
How is yarn length calculated?
Length in meters is weight in grams divided by Tex, times 1000. In this sheet the length column is shown in kilometers for a quantity in kilograms. It does not include waste, so keep an allowance when you plan production.
If yarn items and specifications are stored in your ERP with inconsistent units, we can build a read-only assistant that normalizes counts across suppliers and flags BOM mismatches.
Related Tools
Reactive Dye Liquor Ratio and Recipe Calculator
Work out liquor volume, dye, salt and soda ash for a dye batch and see chemical and water cost per kg of fabric at different liquor ratios.
Industry TemplatesFabric Shrinkage Pattern Allowance Calculator
Convert finished garment size and wash shrinkage into the pattern (cut) size, then total fabric area and linear meters for the order.
Costing & FinanceGarment FOB Price and CMT Margin Calculator
Build a garment FOB quote from fabric consumption, trims, CMT, packing, finance cost and the margin you want to earn.
More Industry Templates tools
See all- Garment Tech Pack Specification Template
- Garment Size Grade Spec Worksheet
- Textile Dye Lot Recipe Card Template
- Pre-Production Meeting (PPM) Minutes Template
- Cutting Order and Lay Plan Sheet Template
- Distributor Free Freight Policy Template
- Job Shop Quote Cover Letter Template
- Monthly Operations Review Meeting Pack Template
- OEE Improvement A3 Charter Template
Keep exploring
Free tools
- Textile and Apparel Plant ERP Readiness AssessmentAnswer 10 questions about styles, lots, BOMs, routings, costing and traceability to see how ready your plant data is for ERP-driven planning or AI.
- Oracle EBS 12.2 Disk Space Calculator (fs1, fs2, fs_ne and Database)Size application and database tier storage for EBS 12.2, including both file system editions, fs_ne, staging, growth and backups.
- Cutting Order and Lay Plan Sheet TemplateA fill-in cutting order and lay plan for the cutting room: style, fabric, marker, ply count, size ratio and approvals, exported to PDF or Word.
ERP fixes and how-tos
- Conversion Factor Session in Infor LN: Setup and Common ErrorsHow unit conversion factors work in Infor LN: general factors versus item-specific factors, where to maintain them and how to fix missing conversion factor errors.
- JD Edwards table conversion: how it works and how to run oneWhat a JD Edwards table conversion does to a JDE table's structure and data, when it runs in a package build, and how to run or design one manually.
AI on your ERP
- AI on Your ERP for Textile and Apparel ManufacturingPrivate AI on your ERP for textile and apparel makers: style-color-size matrices, lot dyeing, cut plans, TNA calendars and buyer compliance, kept on your own systems.
- Infor M3 AI for Fashion and Apparel: Seasons, Sizes and AllocationPrivate AI on Infor M3 for fashion and apparel: style-color-size matrix, season planning, allocation, returns and supplier PO tracking, on-prem or private cloud.