Quality & InspectionFree worksheetPDF, Excel, Word export

Pareto Defect Cost Ranking Worksheet

A Pareto analysis tells you where to start. This worksheet lets you list defect types with count, cost and handling time, computes extended cost and hours per line, and exports to Excel for sorting and charting.

Free, optional. Reopen it on any device.
Download:
Defect typeProcessCountCost per defectExtended costHandling minutes eachHandling hours
$5,888
19 hrs
$6,510
21 hrs
$1,276
10 hrs
$3,135
11 hrs
$1,776
8 hrs
$333
4 hrs
Total defects
215
Total defect cost
$18,918
Total handling hours
72 hrs
Average cost per defect
$88
Average handling hours per defect
0.3362
Largest single defect cost line
$6,510
Largest line as share of total cost
34.4%

Rank by extended cost, not count: the most frequent defect is often not the most expensive. Sort the exported rows in Excel from largest to smallest and add a cumulative percent column to draw the Pareto chart. Aim at the few lines that make up roughly 80 percent of the cost.

Automated weekly defect Pareto

Optional: discuss producing this ranking from ERP scrap and inspection data each week.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Replace the sample rows with your defect categories from NCRs, scrap reason codes or final inspection records for a fixed period. Enter a realistic cost per defect, including material and labor, and the minutes spent handling each. Add rows for each category and delete the examples. Keep the period and the category list consistent from one review to the next so the results can be compared.

Count versus cost

A count-based Pareto answers which defect is most common. A cost-based Pareto answers which defect hurts most. They often disagree: a missing fastener may occur most often but cost little, while weld porosity occurs less and costs a great deal. Handling hours add a third view that shows where the inspectors and rework cells spend their time.

How to read the result

Check the share held by the largest line, then export and sort. If a few lines hold most of the cost, assign each a root cause owner and an A3 or 8D. If costs are evenly spread, the problem is systemic, and a process-level approach such as better work instructions or training may beat chasing individual defects.

  • Sort descending by extended cost
  • Add cumulative percent for the chart
  • Review monthly with the same categories
  • Revisit after corrective actions to measure the change

Common mistakes

Having too many categories so nothing stands out, an Other bucket that grows larger than the top defect, and mixing scrap reasons with causes. Define categories by symptom you can observe, and keep cause analysis for the next step with the 5 whys or a fishbone.

Frequently Asked Questions

How many categories should I use?

Between 6 and 12 is workable. If everything falls in Other, split it. If there are dozens of tiny categories, group them by symptom family.

Why use cost instead of count?

Cost shows business impact. A rare, expensive defect may deserve attention before a frequent, cheap one. Use both views in your review.

Where do I get cost per defect?

Use standard cost of the part at the point it was found, plus rework labor, plus disposal. Finance or cost accounting can supply average values by process.

Does it draw the chart?

The worksheet computes the numbers and exports to Excel. Sort by extended cost there, add a cumulative column and insert a combined bar and line chart.

If your scrap and NCR reason codes are in an ERP, we can help produce this ranking directly from transactions every week, so the meeting starts with the data.