ISO 13849-1 Performance Level (PL) and SIL Reference Table
Machine safety functions such as emergency stop, light curtain muting and guard interlocks are rated with a performance level (PL) from ISO 13849-1, or a SIL from IEC 62061. This table collects the bands you keep looking up in one searchable place.
| Item | Group | Range or definition | Note |
|---|---|---|---|
PL a | Performance level | PFHd 1E-5 to below 1E-4 per hour | Lowest level; no direct SIL equivalent |
PL b | Performance level | PFHd 3E-6 to below 1E-5 per hour | Roughly SIL 1 band at the upper end |
PL c | Performance level | PFHd 1E-6 to below 3E-6 per hour | Corresponds to SIL 1 |
PL d | Performance level | PFHd 1E-7 to below 1E-6 per hour | Corresponds to SIL 2 |
PL e | Performance level | PFHd 1E-8 to below 1E-7 per hour | Corresponds to SIL 3 |
SIL 1 | Safety integrity level (IEC 62061) | PFH 1E-6 to below 1E-5 per hour | High demand or continuous mode |
SIL 2 | Safety integrity level (IEC 62061) | PFH 1E-7 to below 1E-6 per hour | High demand or continuous mode |
SIL 3 | Safety integrity level (IEC 62061) | PFH 1E-8 to below 1E-7 per hour | High demand or continuous mode |
Category B | Structure category | Basic safety principles, single channel, no diagnostics | A fault can cause loss of the safety function |
Category 1 | Structure category | Single channel using well-tried components and principles | Higher MTTFd than Category B |
Category 2 | Structure category | Single channel with periodic testing of the safety function | Test interval must be sufficiently frequent versus demand rate |
Category 3 | Structure category | Redundant, single fault does not lose the safety function | Single faults detected where reasonably practicable |
Category 4 | Structure category | Redundant, single fault detected at or before next demand | Accumulation of undetected faults must not lose the function |
MTTFd low | MTTFd per channel | 3 years to below 10 years | Mean time to dangerous failure |
MTTFd medium | MTTFd per channel | 10 years to below 30 years | |
MTTFd high | MTTFd per channel | 30 years to 100 years | Value capped at 100 years per channel |
DC none | Diagnostic coverage | Below 60 percent | |
DC low | Diagnostic coverage | 60 percent to below 90 percent | |
DC medium | Diagnostic coverage | 90 percent to below 99 percent | |
DC high | Diagnostic coverage | 99 percent or higher | |
CCF | Common cause failure | Score of at least 65 out of 100 required | Applies to redundant categories 2, 3 and 4 via the measures list in the standard |
Summary table for orientation, not a substitute for the standard. PFHd is the probability of dangerous failure per hour. SIL values use IEC 62061 and IEC 61508 bands. Actual PL determination uses the Table 7 style combination of category, MTTFd and DC, plus software, systematic failure and validation requirements. Verify against the current edition of ISO 13849-1 and ISO 13849-2.
Link safety ratings to serial numbers
Optional: a review of how to hold safety function data against machine serial numbers in your ERP.
Optional. The tool and every export work without this. No spam.
How to use this table
Start from the required performance level (PLr) set during risk assessment, then check that the designed safety function reaches it. Find PLr in the first rows, check the PFHd limit, and confirm the category, MTTFd and diagnostic coverage rows you used in your calculation. If your customer or notified body quotes SIL, use the SIL rows for the equivalent band.
- Set PLr from risk assessment first
- Pick a category that can support the PL
- Check MTTFd and DC band per channel
- Confirm common cause failure measures for redundant designs
PL versus SIL
PL c, d and e line up with SIL 1, 2 and 3 on PFHd. PL a and b have no clean SIL counterpart. The two methods differ in how they build up the number: ISO 13849-1 uses a simplified category-based method, while IEC 62061 uses a subsystem and reliability block approach. Use the one your harmonised standard or customer references, and state it in the technical file.
Worked example
A safety door with a coded magnetic switch pair and a safety relay is assessed at PLr d. A two channel Category 3 architecture with medium MTTFd (say 20 years per channel) and high DC can reach PL d. If you use a single channel Category 2 design, you would likely fall short. Record each component's B10d value from datasheets when computing MTTFd.
Common mistakes
Treating the category as the PL is the most frequent error. Category is only one input. Another is ignoring validation: ISO 13849-2 expects fault lists and tests. Teams also forget that the PFHd of the safety function is the total of sensor, logic and actuator, not just the safety relay certificate value.
Frequently Asked Questions
What PFHd does PL d need?
PL d requires a PFHd of at least 1E-7 and below 1E-6 per hour. That is the same band as SIL 2 for high demand or continuous mode, though the two methods calculate the value differently.
Is Category 3 the same as PL d?
No. Category 3 is an architecture, and with suitable MTTFd and diagnostic coverage it can achieve PL d, and in some cases PL e is not reachable. The PL depends on category, MTTFd, DC and CCF together.
What is B10d used for?
B10d is the number of cycles at which 10 percent of components fail dangerously. Combined with your operations per year, it gives MTTFd for electromechanical parts such as contactors and valves.
Does the Machinery Regulation change this?
Regulation (EU) 2023/1230 replaces the Machinery Directive from January 2027 and adds items such as software and AI related safety aspects, but the core ISO 13849-1 method remains the common route to presumption of conformity. Check the harmonised standards list.
If you store safety function ratings in spreadsheets and want them linked to machine serial numbers and the technical file in your ERP, we can scope that connection.
Related Tools
Machinery Safety Standards Reference (Type A, B, C)
Quick lookup of the core machine safety standards, what each covers and where it fits in the A, B, C hierarchy.
Compliance & ContractsMachine Risk Assessment Checklist (ISO 12100)
A structured checklist for the ISO 12100 risk assessment process on a new or modified machine, with critical items flagged.
Engineering & PLMIEC 60204-1 Wire and Pushbutton Colour Reference
Conductor, pushbutton and indicator lamp colours used in machine control panels, in one searchable chart.
Engineering & PLMIP Ingress Protection Code Reference (IEC 60529)
Look up what every IP digit means for solids and liquids, so enclosure, motor and sensor specs on your machine are unambiguous.
More Compliance & Contracts tools
See all- Machinery Project Change Order Request Template
- Liquidated Damages Delay Exposure Calculator
- SAP SoD Residual Risk Score Calculator
- SAP Firefighter ID Usage Review Log
- IBM i (AS/400) User Profile Access Review Worksheet
- SyteLine Security and User Access Audit Checklist
- Infor XA (MAPICS) User Access Review Worksheet
- China ERP Data Security and Compliance Assessment
- ERP Vendor Data Processing Agreement Outline
Keep exploring
Free tools
- Fiber Optic Wavelength Bands and Windows ReferenceSearchable table of the ITU optical bands and the wavelengths used by multimode, singlemode, PON and test equipment.
- Machine Safety Function Register WorksheetAn editable register of safety functions with required performance level, achieved performance level, category and validation status for the technical file.
- Machinery Safety Standards Reference (Type A, B, C)Quick lookup of the core machine safety standards, what each covers and where it fits in the A, B, C hierarchy.
ERP fixes and how-tos
- How to calculate item cost prices in Infor LNRun item cost price calculation in Infor LN: cost components, simulation vs update mode, BOM/routing roll-up, and how the result reaches inventory valuation.
- Why Is Epicor So Slow? A Kinetic Performance ChecklistDiagnose slow Epicor Kinetic: separate client, app server, SQL Server, BAQ and network causes, with a step-by-step checklist and ways to tell slow from down.
- How Much Does ERP AI Actually Cost?Realistic cost bands for adding AI to an ERP: pilot, single-department and enterprise rollouts, vendor copilot pricing, and the costs CIOs miss.
Guides
- SyteLine Performance Troubleshooting GuideTroubleshoot SyteLine performance issues systematically. Slow forms, timeout errors, batch processing delays, and server resource bottlenecks.
- Error Handling and Debugging for SyteLine IDO DevelopmentDebug SyteLine IDO errors effectively. Learn error categories, exception handling patterns, logging strategies, and diagnostic tools for Infor CloudSuite Industrial.
- ERP for Industrial Machinery Manufacturers: ETO, Configuration, and AftermarketERP for industrial machinery manufacturers: engineer-to-order quoting, configurators, project accounting, aftermarket service parts and field service needs.
AI on your ERP
- Evaluating SAP for Industrial AI in Manufacturing: Strengths, Gaps and How to DecideAn honest look at SAP for manufacturing industrial AI: Digital Manufacturing, asset performance and Joule, where they fit and where gaps remain.
- AI on SAP Business One for Industrial Machinery Builders: Projects, Spares and Service in One ConversationPrivate AI on SAP Business One for machinery builders: project and BOM status, spare parts, service contracts, warranty and CE documentation, on-prem and read-only.