Medical Device Standards Reference Table (ISO, IEC, ASTM)
Medical device files cite dozens of standards, and it is easy to lose track of which one covers which question. This table lists the ISO, IEC and ASTM documents that quality and regulatory teams reach for most, grouped by area, so you can find the right reference in seconds.
| Standard | Subject | Area | Typical use in the quality system |
|---|---|---|---|
ISO 13485 | Quality management systems, requirements for regulatory purposes | QMS | Base QMS certification and audit criteria; also the model for the US QMSR |
ISO 14971 | Application of risk management to medical devices | Risk | Risk management plan, hazard analysis, risk control and benefit-risk file |
ISO/TR 24971 | Guidance on the application of ISO 14971 | Risk | Practical guidance for building the risk management file |
IEC 62304 | Medical device software, software life cycle processes | Software | Software development plan, safety classification, verification and maintenance |
IEC 81001-5-1 | Health software and health IT systems safety and security, security activities in the product life cycle | Software | Cybersecurity activities for software in or as a device |
AAMI TIR57 | Principles for medical device security, risk management | Software | Security risk management that feeds the safety risk file |
IEC 62366-1 | Application of usability engineering to medical devices | Usability | Use specification, use-related risk analysis, summative evaluation |
IEC 60601-1 | Medical electrical equipment, basic safety and essential performance | Electrical safety | Electrical safety test plan and certification for powered devices |
IEC 60601-1-2 | Collateral standard, electromagnetic disturbances | Electrical safety | EMC testing and immunity levels for the intended environment |
ISO 10993-1 | Biological evaluation of medical devices within a risk management process | Biocompatibility | Biological evaluation plan by nature and duration of body contact |
ISO 11135 | Sterilization of health-care products, ethylene oxide | Sterilization | EO process development, validation and routine control |
ISO 11137-1 | Sterilization of health care products, radiation, requirements | Sterilization | Gamma, electron beam and X-ray process validation and control |
ISO 11137-2 | Sterilization of health care products, radiation, establishing the sterilization dose | Sterilization | Dose setting and substantiation using bioburden data |
ISO 17665 | Sterilization of health care products, moist heat | Sterilization | Steam sterilization development, validation and routine control |
ISO 14937 | General requirements for characterization of a sterilizing agent | Sterilization | Used where no dedicated process standard exists |
ISO 11737-1 | Sterilization of health care products, microbiological methods, bioburden determination | Sterilization | Bioburden testing method and product family approach |
ISO 11737-2 | Sterilization of health care products, microbiological methods, tests of sterility | Sterilization | Tests of sterility performed in the definition, validation and maintenance of a sterilization process |
ISO 11607-1 | Packaging for terminally sterilized medical devices, materials, sterile barrier systems and packaging systems | Packaging | Material and sterile barrier system selection and qualification |
ISO 11607-2 | Packaging for terminally sterilized medical devices, validation requirements for forming, sealing and assembly processes | Packaging | Sealer IQ OQ PQ and seal parameter control |
ASTM F1980 | Accelerated aging of sterile barrier systems and medical devices | Packaging | Accelerated aging protocol used to support shelf-life claims |
ASTM F88 | Seal strength of flexible barrier materials | Packaging | Peel strength test for pouch and lidding seals |
ASTM F1886 | Determining integrity of seals for medical packaging by visual inspection | Packaging | Visual seal integrity inspection method |
ASTM F2096 | Detecting gross leaks in medical packaging by internal pressurization (bubble test) | Packaging | Gross leak test for sealed packages |
ISO 14644-1 | Cleanrooms and associated controlled environments, classification of air cleanliness by particle concentration | Cleanroom | Cleanroom classification and recertification |
ISO 14644-2 | Cleanrooms and associated controlled environments, monitoring to provide evidence of cleanroom performance | Cleanroom | Monitoring plan for cleanroom performance |
ISO 15223-1 | Medical devices, symbols to be used with information to be supplied by the manufacturer | Labeling | Standard label symbols such as manufacturer, lot, expiry, sterile |
ISO 20417 | Information to be supplied by the manufacturer | Labeling | General requirements for labels, IFU and accompanying information |
ISO 14155 | Clinical investigation of medical devices for human subjects, good clinical practice | Clinical | Clinical investigation planning, conduct and reporting |
ISO 80369-1 | Small-bore connectors for liquids and gases in healthcare applications, general requirements | Design | Connector misconnection risk reduction for small-bore devices |
Standards are revised on their own cycles and regulators recognize specific editions. Confirm the current edition, any amendments and the recognition status (FDA Recognized Consensus Standards database, EU harmonized standards list) before citing in a submission.
Optional review of your standards applicability matrix
Send us your matrix and we will comment on how it could be linked to your ERP and quality records.
Optional. The tool and every export work without this. No spam.
How to use the table
Type a standard number, a keyword such as sterilization or packaging, or a lifecycle topic into the search box. Filter mentally by the Area column to see everything that applies to one discipline, for example all sterilization documents. Export the list to Excel to seed a standards applicability matrix, where you add columns for edition, applicability to your device family, evidence location and the person responsible for conformity.
- Search by number, title word or area
- Use Area to group by discipline
- Export to Excel for your applicability matrix
- Add edition and recognition columns yourself
How the standards fit together
ISO 13485 is the system level document. ISO 14971 sits beside it as the risk process that every design, production and post-market decision should feed. Product-specific standards then sit underneath: IEC 60601-1 for powered equipment, IEC 62304 for software, ISO 10993 for materials in body contact, and the sterilization and packaging families for sterile products. A technical file normally shows a clear line from the intended use to the risk file and then to the applicable standards.
Building a standards applicability matrix
For each device family list every standard that could apply, state whether it applies and why, record the exact edition used, and point to the report or protocol that demonstrates conformity. Where you apply only part of a standard, say which clauses. Reviewers and notified body auditors look for a documented rationale rather than a silent omission, so the exclusion rows matter as much as the inclusions.
Common mistakes
Teams often cite a standard without its edition, rely on an old edition after a revision changed requirements, or treat a collateral standard as optional. Another frequent gap is citing ISO 11607-1 for packaging materials but having no ISO 11607-2 validation of the sealing process. Keep the matrix under document control and review it when a standard is revised or a design change alters the device scope.
Frequently Asked Questions
Does this list replace the official standards?
No. It is a navigation aid with short subject descriptions. Requirements are in the published standards, which you must purchase from the issuing body. Always read the current edition and any amendments before claiming conformity.
Which standards are mandatory?
Standards are generally voluntary, but regulators recognize or harmonize specific ones and conformity gives a presumption of meeting related legal requirements. What is mandatory depends on your market, device class and the regulation that applies to you.
Why is ISO 14971 listed with ISO/TR 24971?
ISO 14971 contains the requirements. ISO/TR 24971 is a technical report that gives guidance on applying them. Teams usually keep both in the risk management procedure references.
Can I add my own rows?
The reference table is read-only, but you can export it to Excel and extend it with company standards, customer specifications and country requirements.
If your standards matrix, risk file and ERP quality records are maintained in separate places, Netray can discuss connecting them so evidence links stay current.
Related Tools
ISO 10993 Biocompatibility Parts Reference Table
Look up what each part of the ISO 10993 series covers and which biological endpoint or evaluation step it supports.
Compliance & ContractsEU MDR Annex VIII Classification Rules Reference
A searchable summary of the 22 classification rules in Annex VIII of Regulation (EU) 2017/745 with the class each rule typically leads to.
Compliance & ContractsFDA 21 CFR 820 to ISO 13485 Clause Crosswalk
Map each 21 CFR 820 quality system topic to the corresponding ISO 13485 clause to speed up QMSR gap assessments and procedure rewrites.
Quality & InspectionIEC 62304 Software Lifecycle Documentation Checklist
Check that your medical device software file covers planning, requirements, architecture, verification, release, maintenance and problem resolution.
More Compliance & Contracts tools
See all- UDI Label Data Field Reference
- Medical Device Recall Cost Estimator
- ISO 13485 Document Templates
- SAP SoD Residual Risk Score Calculator
- SAP Firefighter ID Usage Review Log
- IBM i (AS/400) User Profile Access Review Worksheet
- SyteLine Security and User Access Audit Checklist
- Infor XA (MAPICS) User Access Review Worksheet
- China ERP Data Security and Compliance Assessment
Keep exploring
Free tools
- ISO 13485 Quality Plan Template with Medical Device File ExampleA fill-in ISO 13485 quality plan with a medical device file content example and a clause compliance checklist table.
- IEC 62304 Software Lifecycle Documentation ChecklistCheck that your medical device software file covers planning, requirements, architecture, verification, release, maintenance and problem resolution.
- Medical Device Accelerated Aging Calculator (ASTM F1980)Calculates the accelerated aging factor and chamber time for a target shelf life using the Q10 method.
Guides
- Medical Device ERP: What ERP for Medical Device Manufacturers Must DoMedical device ERP explained: what ERP for medical device manufacturers must do for DHR, lot and UDI traceability, Part 11, QMSR and ISO 13485, and how to choose.
- ISO 13485 ERP Requirements for Medical Device Contract ManufacturersWhat ISO 13485 and FDA QMSR actually require of an ERP at a medical device contract manufacturer: records, traceability, change control and software validation.
- How to Quote Medical Device Contract Manufacturing WorkHow medical device contract manufacturers build a quote: materials with certs, cleanroom labor, validation, inspection, sterilization handoffs and NRE.
AI on your ERP
- AI on Infor SyteLine for Medical Device Manufacturers: Genealogy, DHR and Audit EvidencePrivate AI on Infor SyteLine for medical device makers: lot and serial genealogy, DHR assembly, UDI and QMSR evidence, with human approval on every write.
- AI on SAP Business One for Medical Device Manufacturers: Traceability and Records Retrieval Without Touching the Validated StatePrivate AI on SAP Business One for medical device manufacturers: UDI, lot and serial traceability, supplier records, DHR retrieval. Read-only, on-prem, QMSR-aware.
Manufacturing hubs
- Spring Manufacturers Institute and spring makers: processes, standards and ERP realitiesSpring Manufacturers Institute and spring makers: wire, coiling, heat treat and PPAP, plus the ERP, quoting and private AI issues compression and torsion spring shops face.
- Manufacturing in West Michigan and Grand RapidsWest Michigan manufacturing around Grand Rapids: automotive parts, office furniture, medical devices, standards, local programs and where private AI on ERP helps.